Live commercial capture intelligence tracking 537 verified high-voltage interconnection queue filings, FERC Large Generator / Load Interconnection Agreements (LGIA/ISA), and DoD/DOE substation & transformer contract actions across PJM, ERCOT, MISO, NYISO, CAISO, SPP, and ISO-NE totaling 111.3 GW (111,313 MW). Built for hyperscale data center site selectors, HV step-up transformer OEMs ($GEV, $ETN, $HUBB), substation EPC primes ($PWR, $MYRG, $AMRC), and AI procurement agents.
| ISO / Queue ID | Project / Developer / Location | Substation / POI & Voltage | Capacity & Est. Upgrade | Commercial Trigger & Equipment Lead Risk | Source |
|---|---|---|---|---|---|
| NYISO NYISO-L-1743 |
St. Lawrence Infrastructure 2 (NYPA)
St. Lawrence Infrastructure, LLC
St. Lawrence, NY | Filed 2025-09-02 | Target COD 2027-12-01
|
NYPA's 230kV Moses Massena 1 (MMS-1) and 230kV Moses Massena 2 (MMS-2)
230 kV | Large Industrial / DOE Load
|
1,935 MW
Est. Upg: $131.6M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
1935 MW large load interconnection at NYPA's 230kV Moses Massena 1 (MMS-1) and 230kV Moses Massena 2 (MMS-2) (230kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1757 |
NY-Route 9W Load Center (National Grid)
NY-Route 9W LLC $NGG
Greene, NY | Filed 2026-01-07 | Target COD 2027-12-01
|
Leeds 345kV substation
345 kV | Large Load / AI Data Center & Industrial
|
1,000 MW
Est. Upg: $68.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
1000 MW large load interconnection at Leeds 345kV substation (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1738 |
1 Gig Data Center East Fishkill, NY (CONED)
Donovan Drive Holdings LLC $ED
Dutchess, NY | Filed 2025-07-17 | Target COD 2027-12-01
|
East Fishkill to Wood Street 345 kV lines (38 and 39)
345 kV | Large Load / AI Data Center & Industrial
|
1,000 MW
Est. Upg: $68.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
1000 MW large load interconnection at East Fishkill to Wood Street 345 kV lines (38 and 39) (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1742 |
St. Lawrence Infrastructure 1 (NYPA)
St. Lawrence Infrastructure, LLC
St. Lawrence, NY | Filed 2025-09-02 | Target COD 2027-12-01
|
NYPA HA-2, 345kV Transmission Line
345 kV | Large Industrial / DOE Load
|
860 MW
Est. Upg: $58.5M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
860 MW large load interconnection at NYPA HA-2, 345kV Transmission Line (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1765 |
Micron Fab 3 (National Grid)
Eldo Varghese $MU
Onondaga, Ne | Filed 2026-08-28 | Target COD 2027-12-01
|
National Grid - Clay Substation
345 kV | Semiconductor Fab Load
|
606 MW
Est. Upg: $41.2M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
606 MW large load interconnection at National Grid - Clay Substation (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1627 |
Micron Fab 2 (NM-NG)
Micron New York Semiconductor Manufacturing LLC $MU
Onondaga, NY | Filed 2023-10-31 | Target COD 2027-12-01
|
National Grid Clay 345 kV Substation
345 kV | Semiconductor Fab Load
|
576 MW
Est. Upg: $39.2M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
576 MW large load interconnection at National Grid Clay 345 kV Substation (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1741 |
North East Data LLC Data Center (NM-NG)
North East Data LLC
Niagara, NY | Filed 2025-08-29 | Target COD 2027-12-01
|
230kV lines 77 and 78
230 kV | Large Load / AI Data Center & Industrial
|
500 MW
Est. Upg: $34.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
500 MW large load interconnection at 230kV lines 77 and 78 (230kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1536 |
White Pine Phase 1 (NM-NG)
Micron New York Semiconductor Manufacturing LLC $MU
Onondaga, NY | Filed 2023-03-11 | Target COD 2027-12-01
|
Clay 345 kV Substation
345 kV | Semiconductor Fab Load
|
480 MW
Est. Upg: $32.6M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
480 MW large load interconnection at Clay 345 kV Substation (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1730 |
Arsenal Data Site 1000 (NYPA)
Arconic Corporation
St Lawrence, NY | Filed 2025-03-07 | Target COD 2027-12-01
|
Haverstock to Adirondak 345kV line HA-1
345 kV | Large Load / AI Data Center & Industrial
|
467 MW
Est. Upg: $31.8M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
467 MW large load interconnection at Haverstock to Adirondak 345kV line HA-1 (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-0979 |
North Country Data Center (NYPA)
North Country Data Center
St. Lawrence, NY | Filed 2020-01-22 | Target COD 2027-12-01
|
Reynolds 115kV
115 kV | Large Load / AI Data Center & Industrial
|
435 MW
Est. Upg: $29.6M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
435 MW large load interconnection at Reynolds 115kV (115kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1762 |
Highwall Data Center (NYSEG)
Highwall Energy, LLC
Clearfield, PA | Filed 2026-05-12 | Target COD 2027-12-01
|
same POI of Q#1080 (Mineral Basin Solar), connects to NYSEG's L47 line
345 kV | Large Load / AI Data Center & Industrial
|
400 MW
Est. Upg: $27.2M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
400 MW large load interconnection at same POI of Q#1080 (Mineral Basin Solar), connects to NYSEG's L47 line (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1740 |
Incremental Load Request for Remington Factory Redevelopment (NYPA)
Turin Management LLC
Herkimer, NY | Filed 2025-08-29 | Target COD 2027-12-01
|
Line 1: 345KV from EDIC to Fraser. Line 2: 345 KV from Marcy to Coopers Corners
345 kV | Large Load / AI Data Center & Industrial
|
400 MW
Est. Upg: $27.2M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
400 MW large load interconnection at Line 1: 345KV from EDIC to Fraser. Line 2: 345 KV from Marcy to Coopers Corners (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1763 |
Patriot Forge (NYSEG)
Patriot Forge PA, LLC
Tioga, PA | Filed 2026-05-29 | Target COD 2027-12-01
|
Tap on the NYSEG 345 kV Line 47 (Homer City -Mainesburg 345 kV)
345 kV | Large Industrial / DOE Load
|
350 MW
Est. Upg: $23.8M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
350 MW large load interconnection at Tap on the NYSEG 345 kV Line 47 (Homer City -Mainesburg 345 kV) (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1744 |
Brookhaven Data Center (LIPA)
Brookhaven Logistics Center, LLC
Suffolk, NY | Filed 2025-09-05 | Target COD 2027-12-01
|
LIPA 138kV line circuit, between Caithness Long Island Energy Center Substation and Brookhaven Substation. Coordinates: 40°49'05.8"N 72°55'45.4"W.
138 kV | Large Load / AI Data Center & Industrial
|
300 MW
Est. Upg: $20.4M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
300 MW large load interconnection at LIPA 138kV line circuit, between Caithness Long Island Energy Center Substation and Brookhaven Substation. Coordinates: 40°49'05.8"N 72°55'45.4"W. (138kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1731 |
New York State Artificial Intelligence Data Center (NYPA)
ZeroC Data Centers, LLC
St. Lawrence, NY | Filed 2025-03-14 | Target COD 2027-12-01
|
Haverstock-Adirondack 345kV transmission line HA-2
345 kV | Large Load / AI Data Center & Industrial
|
300 MW
Est. Upg: $20.4M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
300 MW large load interconnection at Haverstock-Adirondack 345kV transmission line HA-2 (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1726 |
Data & Technology Campus (NM-NG)
Riverview Innovation & Technology Campus, Inc.
Erie, NY | Filed 2025-01-31 | Target COD 2027-12-01
|
Huntley - Packard 230kV line 78
230 kV | Large Load / AI Data Center & Industrial
|
300 MW
Est. Upg: $20.4M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
300 MW large load interconnection at Huntley - Packard 230kV line 78 (230kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1723 |
Olean Digital Data Center (NM-NG)
Olean Digital LLC
Cattaraugus, NY | Filed 2024-11-07 | Target COD 2027-12-01
|
Homer Hill 115kV Substation
115 kV | Large Load / AI Data Center & Industrial
|
300 MW
Est. Upg: $20.4M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
300 MW large load interconnection at Homer Hill 115kV Substation (115kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1719 |
New York State Artificial Intelligence Data Center (NM-NG)
ZeroC Data Centers, LLC
St. Lawrence, NY | Filed 2024-09-18 | Target COD 2027-12-01
|
Dennison 115kV substation
115 kV | Large Load / AI Data Center & Industrial
|
300 MW
Est. Upg: $20.4M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
300 MW large load interconnection at Dennison 115kV substation (115kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1484 |
580 STAMP load increase (NM-NG)
GCEDC
Genesee, NY | Filed 2022-12-02 | Target COD 2027-12-01
|
115 kv STAMP substation
115 kV | Large Load / AI Data Center & Industrial
|
300 MW
Est. Upg: $20.4M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
300 MW large load interconnection at 115 kv STAMP substation (115kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-0580 |
WNY STAMP (NYPA)
Genesee County Economic Devel.
Genesee, NY | Filed 2016-09-27 | Target COD 2027-12-01
|
Kintigh/Niagara - New Rochester 345kV
345 kV | Large Industrial / DOE Load
|
300 MW
Est. Upg: $20.4M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
300 MW large load interconnection at Kintigh/Niagara - New Rochester 345kV (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1736 |
Ranalli SuperDC (NYPA)
Ranalli SuperDC LLC
Onondaga, NY | Filed 2025-05-07 | Target COD 2027-12-01
|
Clay to Pannell ckts PC-1 and PC-2
345 kV | Large Load / AI Data Center & Industrial
|
270 MW
Est. Upg: $18.4M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
270 MW large load interconnection at Clay to Pannell ckts PC-1 and PC-2 (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1752 |
Broome County Tech Park (NYSEG)
The Agency
Broome, NY | Filed 2025-10-30 | Target COD 2027-12-01
|
345 kV POI via a loop on the existing Oakdale-Fraser Line 32. The interconnection substation will have a ring bus configuration.
345 kV | Large Industrial / DOE Load
|
250 MW
Est. Upg: $17.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
250 MW large load interconnection at 345 kV POI via a loop on the existing Oakdale-Fraser Line 32. The interconnection substation will have a ring bus configuration. (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1745 |
Pontoon Bridge Road Data Center (NYPA)
American Data Center Partners LLC
St Lawrence, NY | Filed 2025-10-09 | Target COD 2027-12-01
|
Haverstock-Adirondack 345kV transmission lines
345 kV | Large Load / AI Data Center & Industrial
|
250 MW
Est. Upg: $17.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
250 MW large load interconnection at Haverstock-Adirondack 345kV transmission lines (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1732 |
Wulf Compute Data Center II (NYSEG)
TeraWulf Brookings LLC $WULF
Niagara, NY | Filed 2025-03-29 | Target COD 2027-12-01
|
Kintigh 345kV sub-station
345 kV | Large Load / AI Data Center & Industrial
|
250 MW
Est. Upg: $17.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
250 MW large load interconnection at Kintigh 345kV sub-station (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1670 |
Lake Mariner Data II (NYSEG)
Lake Mariner Data LLC $WULF
Niagara, NY | Filed 2024-01-23 | Target COD 2027-12-01
|
Kintigh 345kV Substation
345 kV | Large Load / AI Data Center & Industrial
|
250 MW
Est. Upg: $17.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
250 MW large load interconnection at Kintigh 345kV Substation (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-849 |
Somerset Load (NYSEG)
Somerset Operating Company, LLC
Niagara, NY | Filed 2019-05-21 | Target COD 2027-12-01
|
Kintigh 345kV
345 kV | Large Load / AI Data Center & Industrial
|
250 MW
Est. Upg: $17.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
250 MW large load interconnection at Kintigh 345kV (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1728 |
Arsenal Data Site 250 (NYPA)
Arconic Corporation
St Lawrence, NY | Filed 2025-03-07 | Target COD 2027-12-01
|
Haverstock to Adirondak 345kV line HA-1
345 kV | Large Load / AI Data Center & Industrial
|
233 MW
Est. Upg: $15.8M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
233 MW large load interconnection at Haverstock to Adirondak 345kV line HA-1 (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1729 |
Arsenal Data Site 500 (NYPA)
Arconic Corporation
St Lawrence, NY | Filed 2025-03-07 | Target COD 2027-12-01
|
Haverstock to Adirondak 345kV line HA-1
345 kV | Large Load / AI Data Center & Industrial
|
233 MW
Est. Upg: $15.8M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
233 MW large load interconnection at Haverstock to Adirondak 345kV line HA-1 (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1751 |
Massena Development LLC Power Allocation (NYPA)
North Country Data Center LLC
St; Lawrence, NY | Filed 2025-10-21 | Target COD 2027-12-01
|
NYPA - HW1 and HW2 (345kV) Lines - at Haverstock Substation
345 kV | Large Industrial / DOE Load
|
200 MW
Est. Upg: $13.6M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
200 MW large load interconnection at NYPA - HW1 and HW2 (345kV) Lines - at Haverstock Substation (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1725 |
Greenidge 200 MW Data Center Project (NYSEG)
Greenidge Generation, LLC
Yates, NY | Filed 2024-12-20 | Target COD 2027-12-01
|
New York State Electric & Gas (NYSEG) - Greenidge 115 kV Substation
115 kV | Large Load / AI Data Center & Industrial
|
200 MW
Est. Upg: $13.6M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
200 MW large load interconnection at New York State Electric & Gas (NYSEG) - Greenidge 115 kV Substation (115kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1724 |
Alcoa East Energy Allocation Project (NYPA)
Alcoa $AA
St. Lawrence, NY | Filed 2024-12-09 | Target COD 2027-12-01
|
Haverstock - Willis 345kV lines HW1 & HW2
345 kV | Large Industrial / DOE Load
|
200 MW
Est. Upg: $13.6M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
200 MW large load interconnection at Haverstock - Willis 345kV lines HW1 & HW2 (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1717 |
Proposed Datacenters at 450 Broadway, Buchanan, NY, 10511 (ConEd)
Holtec Decommissioning International (HDI) $ED
Westchester, NY | Filed 2024-08-07 | Target COD 2027-12-01
|
Buchanan 138kV Substation
138 kV | Large Load / AI Data Center & Industrial
|
200 MW
Est. Upg: $13.6M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
200 MW large load interconnection at Buchanan 138kV Substation (138kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1633 |
Suffern Quarry Data Center (O&R)
Robert Delcalzo
Rockland, NY | Filed 2023-11-13 | Target COD 2027-12-01
|
There is a 135kv line abutting our property. We will be building a substation. We currently connect to the Hillburn Area Station.
135 kV | Large Load / AI Data Center & Industrial
|
200 MW
Est. Upg: $13.6M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
200 MW large load interconnection at There is a 135kv line abutting our property. We will be building a substation. We currently connect to the Hillburn Area Station. (135kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1213 |
St Lawrence Data and Agricultural Center (NM-NG)
ZeroC Data Centers, LLC
St. Lawrence, NY | Filed 2021-06-28 | Target COD 2027-12-01
|
Dennison 115kV substation
115 kV | Large Load / AI Data Center & Industrial
|
200 MW
Est. Upg: $13.6M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
200 MW large load interconnection at Dennison 115kV substation (115kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-0909 |
Massena Load (NM-NG)
PetaWatt Holdings, Inc.
St. Lawrence, NY | Filed 2019-09-18 | Target COD 2027-12-01
|
Dennison 115kV substation
115 kV | Large Load / AI Data Center & Industrial
|
200 MW
Est. Upg: $13.6M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
200 MW large load interconnection at Dennison 115kV substation (115kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1747 |
Globe Digital Holdings - 1 (National Grid)
GLOBE DH LLC $NGG
Niagara, NY | Filed 2025-10-17 | Target COD 2027-12-01
|
Beck Packard 76 230kV
230 kV | Large Load / AI Data Center & Industrial
|
192 MW
Est. Upg: $13.1M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
192 MW large load interconnection at Beck Packard 76 230kV (230kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1748 |
GLOBE DH 2 (National Grid)
GLOBE DH LLC $NGG
NIAGARA FALLS, NY | Filed 2025-10-17 | Target COD 2027-12-01
|
Beck Packard 76 230kV
230 kV | Large Industrial / DOE Load
|
192 MW
Est. Upg: $13.1M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
192 MW large load interconnection at Beck Packard 76 230kV (230kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1749 |
Globe DH 3 (National Grid)
GLOBE DH LLC $NGG
niagara falls, NY | Filed 2025-10-17 | Target COD 2027-12-01
|
Niagara Packard 77 230kV
230 kV | Large Industrial / DOE Load
|
192 MW
Est. Upg: $13.1M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
192 MW large load interconnection at Niagara Packard 77 230kV (230kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1754 |
Kenwood Tech Center (National Grid)
EKG Group LLC $NGG
Albany, NY | Filed 2025-11-11 | Target COD 2027-12-01
|
Albany?Bethlehem 115 kV Line #18
115 kV | Large Industrial / DOE Load
|
180 MW
Est. Upg: $12.2M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
180 MW large load interconnection at Albany?Bethlehem 115 kV Line #18 (115kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1721 |
Brookhaven Logistics Center (LIPA)
WF Industrial XII LLC
Suffolk, NY | Filed 2024-10-28 | Target COD 2027-12-01
|
138-872 Holbrook to Sills Rd
345 kV | Large Industrial / DOE Load
|
177 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
176 MW large load interconnection at 138-872 Holbrook to Sills Rd (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1733 |
Cayuga Data (NYSEG)
Cayuga Operating Company, LLC
Tompkins, NY | Filed 2025-03-29 | Target COD 2027-12-01
|
Milliken 115kV Substation
115 kV | Large Load / AI Data Center & Industrial
|
162 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
162 MW large load interconnection at Milliken 115kV Substation (115kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1761 |
NYISO Load Interconnection Process - Data Center Inquiry (NYSEG)
URI TALY
Horseheads, NY | Filed 2026-04-12 | Target COD 2027-12-01
|
Broad Street 34.5 kV Line 93
35 kV | Large Load / AI Data Center & Industrial
|
150 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
150 MW large load interconnection at Broad Street 34.5 kV Line 93 (34kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1760 |
iPark 84 Data Center Interconnection (Central Hudson)
iPark East Fishkill LLC
Dutchess, NY | Filed 2026-03-25 | Target COD 2027-12-01
|
New 115kV line from CHG&E East Fishkill Substation
115 kV | Large Load / AI Data Center & Industrial
|
150 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
150 MW large load interconnection at New 115kV line from CHG&E East Fishkill Substation (115kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1681 |
Niagara Digital Campus (NM-NG)
Niagara Falls Redevelopment LLC
Niagara, NY | Filed 2024-04-09 | Target COD 2027-12-01
|
Adams to Packard 115kV lines 187 and 188
115 kV | Large Load / AI Data Center & Industrial
|
140 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
140 MW large load interconnection at Adams to Packard 115kV lines 187 and 188 (115kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1739 |
Brookhaven National Laboratory Electron Ion Collider Project (LIPA)
Brookhaven Science Associates on behalf of US Department of Energy
Suffolk, NY | Filed 2025-07-30 | Target COD 2027-12-01
|
LIPA existing 69 kV / 13.8 kV substation (PSEG Fifth Ave substation)
69 kV | Large Industrial / DOE Load
|
120 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
120 MW large load interconnection at LIPA existing 69 kV / 13.8 kV substation (PSEG Fifth Ave substation) (69kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1315 |
SDC St. Lawrence (NYPA)
Sabey Data Center Properties, LLC
St. Lawrence, NY | Filed 2021-12-20 | Target COD 2027-12-01
|
Moses-Reynolds MRG-1 and Moses-Reynolds MRG-2 at 115kV
115 kV | Large Industrial / DOE Load
|
120 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
120 MW large load interconnection at Moses-Reynolds MRG-1 and Moses-Reynolds MRG-2 at 115kV (115kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1446 |
Massena Green Hydrogen (NYPA)
Air Products and Chemicals Inc $APD
St Lawrence, NY | Filed 2022-10-05 | Target COD 2027-12-01
|
Haverstock - Adirondack 345 kV line 1
345 kV | Large Industrial / DOE Load
|
110 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
110 MW large load interconnection at Haverstock - Adirondack 345 kV line 1 (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1735 |
Remington Factory Redevelopment (IMEU)
Turin Management LLC
Herkimer, NY | Filed 2025-05-02 | Target COD 2027-12-01
|
Ilion Municipal 115kV substation
115 kV | Large Industrial / DOE Load
|
100 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
100 MW large load interconnection at Ilion Municipal 115kV substation (115kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1756 |
Site Master Plan Expansion Phase II (National Grid)
Research Foundation of SUNY $NGG
Albany, NY | Filed 2025-12-18 | Target COD 2027-12-01
|
Patroon Creek and McKnownville
345 kV | Large Industrial / DOE Load
|
90.0 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
90 MW large load interconnection at Patroon Creek and McKnownville (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1683 |
Cayuga Compute (NYSEG)
Cayuga Operating Company, LLC
Tompkins, NY | Filed 2024-04-24 | Target COD 2027-12-01
|
Milliken substation 115kV
115 kV | Large Load / AI Data Center & Industrial
|
88.0 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
88 MW large load interconnection at Milliken substation 115kV (115kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-0359 |
Verizon - Project Oasis (NYSEG)
National Grid $NGG
Niagara, NY | Filed 2010-12-20 | Target COD 2027-12-01
|
Somerset - Kintigh 345kV
345 kV | Large Industrial / DOE Load
|
75.0 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
75 MW large load interconnection at Somerset - Kintigh 345kV (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1737 |
Griffiss Park Triangle Development (NM-NG)
Griffiss Utility Services Corporation
Oneida, NY | Filed 2025-06-03 | Target COD 2027-12-01
|
Gulf to Rome 115kV line
115 kV | Large Industrial / DOE Load
|
66.0 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
66 MW large load interconnection at Gulf to Rome 115kV line (115kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1750 |
Al Tech Steel Site (NM-NG)
Advance Albany County Alliance
Albany, NY | Filed 2025-10-21 | Target COD 2027-12-01
|
Maplewood Menands 18
345 kV | Large Industrial / DOE Load
|
60.0 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
60 MW large load interconnection at Maplewood Menands 18 (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-0776 |
Greenidge Load (NYSEG)
Greenidge Generation LLC
Yates, NY | Filed 2018-10-22 | Target COD 2027-12-01
|
Greenidge 115kV
115 kV | Large Load / AI Data Center & Industrial
|
60.0 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
60 MW large load interconnection at Greenidge 115kV (115kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1753 |
New York State Dept. of Health Lab (Harriman Campus, Albany NY) (National Grid)
New York State Office of General Services $NGG
Albany, NY | Filed 2025-11-04 | Target COD 2027-12-01
|
Woodlawn-State Campus #12 115kV feeder, and Menands-State Campus #15-115kV feeder.
115 kV | Large Industrial / DOE Load
|
56.8 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
56 MW large load interconnection at Woodlawn-State Campus #12 115kV feeder, and Menands-State Campus #15-115kV feeder. (115kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1465 |
Digihost load (NM-NG)
Digihost Technologies, Inc.
Niagara, NY | Filed 2022-11-14 | Target COD 2027-12-01
|
Walck Rd. 115kV
115 kV | Large Load / AI Data Center & Industrial
|
50.2 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
50 MW large load interconnection at Walck Rd. 115kV (115kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1746 |
OOWWTP Expansion Program (National Grid)
Onondaga County Department of Water Environment Protection $NGG
Onondaga, NY | Filed 2025-10-15 | Target COD 2027-12-01
|
National Grid's 115kV lines: Clay-Teall LN#11 and Clay-Woodard LN#17
115 kV | Large Industrial / DOE Load
|
50.0 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
50 MW large load interconnection at National Grid's 115kV lines: Clay-Teall LN#11 and Clay-Woodard LN#17 (115kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1714 |
Hudson Valley Data Center (O&R)
Robert Delcalzo
Rockland, NY | Filed 2024-07-02 | Target COD 2027-12-01
|
Line 60 138KV - Ramp to Tallman
138 kV | Large Load / AI Data Center & Industrial
|
50.0 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
50 MW large load interconnection at Line 60 138KV - Ramp to Tallman (138kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1682 |
Hudson Valley Data Center (O&R)
Equity Suffern Developers, LLC
Rockland, NY | Filed 2024-04-24 | Target COD 2027-12-01
|
Line 60 138kV - Ramapo to Tallman
138 kV | Large Load / AI Data Center & Industrial
|
50.0 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
50 MW large load interconnection at Line 60 138kV - Ramapo to Tallman (138kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1646 |
POWI Project (NM-NG)
P&M Brick LLC
Albany, NY | Filed 2023-11-30 | Target COD 2027-12-01
|
New Scotland to Knickerbocker 345kV line
345 kV | Large Industrial / DOE Load
|
50.0 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
50 MW large load interconnection at New Scotland to Knickerbocker 345kV line (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-0850 |
Cayuga Load (NYSEG)
Cayuga Operating Company, LLC
Cayuga, NY | Filed 2019-05-21 | Target COD 2027-12-01
|
Milliken 115kV
115 kV | Large Load / AI Data Center & Industrial
|
50.0 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
50 MW large load interconnection at Milliken 115kV (115kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-0311 |
Concord Casino (NYSEG)
NY State Electric & Gas
Sullivan, NY | Filed 2008-09-24 | Target COD 2027-12-01
|
Coopers Corner - Rock Hill
345 kV | Large Industrial / DOE Load
|
48.0 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
48 MW large load interconnection at Coopers Corner - Rock Hill (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1755 |
Site Master Plan Expansion Phase I (National Grid)
Research Foundation of SUNY $NGG
Albany, NY | Filed 2025-12-18 | Target COD 2027-12-01
|
Patroon Creek and McKnownville
345 kV | Large Industrial / DOE Load
|
45.0 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
45 MW large load interconnection at Patroon Creek and McKnownville (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1759 |
Saratoga Expansion (National Grid)
Robert Grant $NGG
Saratoga, NY | Filed 2026-03-25 | Target COD 2027-12-01
|
Adjacent to existing 34.5kV service, a new 115kV substation will be built.
35 kV | Large Industrial / DOE Load
|
40.0 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
40 MW large load interconnection at Adjacent to existing 34.5kV service, a new 115kV substation will be built. (34kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-205 |
Luther Forest (NM-NG)
National Grid $NGG
Saratoga, NY | Filed 2005-11-02 | Target COD 2027-12-01
|
Round Lake 115kV
115 kV | Large Industrial / DOE Load
|
40.0 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
40 MW large load interconnection at Round Lake 115kV (115kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1716 |
Orangeburg Expansion Phase 2 (O&R)
DataBank Holdings, LLC
Orange, NY | Filed 2024-08-05 | Target COD 2027-12-01
|
Oak St 38kV substation
38 kV | Large Industrial / DOE Load
|
30.0 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
30 MW large load interconnection at Oak St 38kV substation (38kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1715 |
1547 CSR - Orangeburg LLC (O&R)
Jerry Martin
Rockland, NJ | Filed 2024-07-02 | Target COD 2027-12-01
|
138kV Line 703 between Corporate Drive and Harings Corner
138 kV | Large Industrial / DOE Load
|
30.0 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
30 MW large load interconnection at 138kV Line 703 between Corporate Drive and Harings Corner (138kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-0423 |
University of Rochester (NYSEG)
Rochester Gas & Electric
Monroe, NY | Filed 2013-11-17 | Target COD 2027-12-01
|
Station 251
345 kV | Large Industrial / DOE Load
|
25.0 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
25 MW large load interconnection at Station 251 (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1713 |
Project Sycamore Orangeburg (O&R)
Project Sycamore - Orangeburg
Rockland, NY | Filed 2024-06-19 | Target COD 2027-12-01
|
Oak Street 138kV
138 kV | Large Industrial / DOE Load
|
22.3 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
22 MW large load interconnection at Oak Street 138kV (138kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1758 |
GE Vernova 2690 Balltown Road High Yard Upgrade (National Grid)
GE Vernova $GEV
Schenectady, NY | Filed 2026-01-29 | Target COD 2027-12-01
|
Rosa Road - General Electric R&D National Grid #14
345 kV | Large Industrial / DOE Load
|
20.0 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
20 MW large load interconnection at Rosa Road - General Electric R&D National Grid #14 (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-0290A |
Green Island Power (NM-NG)
Green Island Power Authority
Albany, NY | Filed 2008-04-07 | Target COD 2027-12-01
|
Maplewood - Johnson Rd 115kV
115 kV | Large Industrial / DOE Load
|
20.0 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
20 MW large load interconnection at Maplewood - Johnson Rd 115kV (115kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1522 |
GTS Dover EMD Compressor (ConEd)
Iroquois Gas Transmission System $ED
Dutchess, NY | Filed 2023-02-15 | Target COD 2027-12-01
|
Pleasant Valley - Cricket Valley 345kV
345 kV | Large Industrial / DOE Load
|
16.5 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
16 MW large load interconnection at Pleasant Valley - Cricket Valley 345kV (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| NYISO NYISO-L-1764 |
Kilbourne Graphite Concentrator Plant (National Grid)
Titan Mining Corporation $NGG
ST LAWRENCE, NY | Filed 2026-07-16 | Target COD 2027-12-01
|
ZINCO 115
345 kV | Large Industrial / DOE Load
|
15.0 MW
Est. Upg: $12.0M
|
DATA CENTER / LARGE LOAD INTERCONNECTION
Lead Risk: 30-42 Months (345kV/115kV Large Power Transformer)
15 MW large load interconnection at ZINCO 115 (345kV) - developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.
|
Official Filing ↗ |
| MISO J4409 |
MISO J4409 - DUKE ENERGY INDIANA, LLC CIN Substation (Solar / Battery Storage)
DUKE ENERGY INDIANA, LLC CIN $DUK
Regional, TX | Filed 2026-09-04 | Target COD 2031-10-01
|
DUKE ENERGY INDIANA, LLC CIN Substation
345 kV | Solar / Battery Storage
|
1,440 MW
Est. Upg: $122.4M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 1440 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4331 |
MISO J4331 - ITC MIDWEST Substation (Solar / Battery Storage)
ITC MIDWEST
Regional, TX | Filed 2026-09-01 | Target COD 2031-06-30
|
ITC MIDWEST Substation
345 kV | Solar / Battery Storage
|
1,435 MW
Est. Upg: $122.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 1435 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| NYISO C24-003 |
Vineyard Mid-Atlantic West (NYPA)
Vineyard Mid-Atlantic LLC
Nassu, NY | Filed 2024-08-01 | Target COD 2028-06-01
|
East Garden City 345kV
345 kV | Offshore Wind
|
1,321 MW
Est. Upg: $112.3M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 1321 MW (Offshore Wind) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| NYISO C24-021 |
Bluepoint Wind 1 (CONED)
Bluepoint Wind LLC $ED
Kings, NY | Filed 2024-08-01 | Target COD 2028-06-01
|
Brooklyn Clean Energy Hub 345kV Substation
345 kV | Offshore Wind
|
1,310 MW
Est. Upg: $111.3M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 1310 MW (Offshore Wind) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4342 |
MISO J4342 - NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS Substation (Solar / Battery Storage)
NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS
Regional, TX | Filed 2026-09-09 | Target COD 2031-05-02
|
NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS Substation
345 kV | Solar / Battery Storage
|
976 MW
Est. Upg: $83.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 976 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4324 |
MISO J4324 - NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS Substation (Solar / Battery Storage)
NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS
Starke, TX | Filed 2026-09-09 | Target COD 2031-05-02
|
NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS Substation
345 kV | Solar / Battery Storage
|
976 MW
Est. Upg: $83.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 976 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4298 |
MISO J4298 - DUKE ENERGY INDIANA, LLC CIN Substation (Solar / Battery Storage)
DUKE ENERGY INDIANA, LLC CIN $DUK
Regional, TX | Filed 2026-09-08 | Target COD 2031-05-02
|
DUKE ENERGY INDIANA, LLC CIN Substation
345 kV | Solar / Battery Storage
|
976 MW
Est. Upg: $83.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 976 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4369 |
MISO J4369 - MIDAMERICAN ENERGY CO. MEC Substation (Solar / Battery Storage)
MIDAMERICAN ENERGY CO. MEC
Regional, TX | Filed 2026-09-01 | Target COD 2031-06-30
|
MIDAMERICAN ENERGY CO. MEC Substation
345 kV | Solar / Battery Storage
|
950 MW
Est. Upg: $80.8M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 950 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4299 |
MISO J4299 - CLECO POWER LLC CLEC Substation (Solar / Battery Storage)
CLECO POWER LLC CLEC
Regional, TX | Filed 2026-09-09 | Target COD 2031-05-02
|
CLECO POWER LLC CLEC Substation
345 kV | Solar / Battery Storage
|
770 MW
Est. Upg: $65.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 770 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4384 |
MISO J4384 - MISO Transmission Owner Substation (Solar / Battery Storage)
MISO Transmission Owner
Regional, TX | Filed 2026-09-09 | Target COD 2031-12-31
|
MISO Transmission Owner Substation
345 kV | Solar / Battery Storage
|
770 MW
Est. Upg: $65.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 770 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4339 |
MISO J4339 - DUKE ENERGY INDIANA, LLC CIN Substation (Solar / Battery Storage)
DUKE ENERGY INDIANA, LLC CIN $DUK
Regional, TX | Filed 2026-09-08 | Target COD 2031-05-02
|
DUKE ENERGY INDIANA, LLC CIN Substation
345 kV | Solar / Battery Storage
|
770 MW
Est. Upg: $65.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 770 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4307 |
MISO J4307 - ENTERGY LOUISIANA, LLC ELTO Substation (Solar / Battery Storage)
ENTERGY LOUISIANA, LLC ELTO $ETR
Regional, TX | Filed 2026-09-09 | Target COD 2031-12-01
|
ENTERGY LOUISIANA, LLC ELTO Substation
345 kV | Solar / Battery Storage
|
720 MW
Est. Upg: $61.2M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 720 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| NYISO C26-0053 |
EF Barrett - 2 (NY Transco)
NGV Barrett Energy Center LLC
Nassau, NY | Filed 2026-09-08 | Target COD 2028-06-01
|
(New) 345 kV Barrett Propel Substation
345 kV | CC
|
627 MW
Est. Upg: $53.3M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 626 MW (CC) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| NYISO C26-0001-1 |
EVERGREEN RIDGE POWER (NYSEG)
Evergreen Ridge Power, LLC
TIOGA, PA | Filed 2026-07-31 | Target COD 2028-06-01
|
Mainesburg 345 kV to Homer City 345 kV Circuit ID -1
345 kV | CC
|
624 MW
Est. Upg: $53.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 624 MW (CC) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4406 |
MISO J4406 - MISO Transmission Owner Substation (Solar / Battery Storage)
MISO Transmission Owner
Regional, TX | Filed 2026-09-09 | Target COD 2030-09-01
|
MISO Transmission Owner Substation
345 kV | Solar / Battery Storage
|
524 MW
Est. Upg: $44.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 523 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4322 |
MISO J4322 - ENTERGY ARKANSAS, LLC EATO Substation (Solar / Battery Storage)
ENTERGY ARKANSAS, LLC EATO $ETR
Regional, TX | Filed 2026-09-10 | Target COD 2030-04-01
|
ENTERGY ARKANSAS, LLC EATO Substation
345 kV | Solar / Battery Storage
|
500 MW
Est. Upg: $42.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 500 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4381 |
MISO J4381 - MIDAMERICAN ENERGY CO. MEC Substation (Solar / Battery Storage)
MIDAMERICAN ENERGY CO. MEC
Regional, TX | Filed 2026-09-10 | Target COD 2030-05-30
|
MIDAMERICAN ENERGY CO. MEC Substation
345 kV | Solar / Battery Storage
|
500 MW
Est. Upg: $42.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 500 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4355 |
MISO J4355 - Cedar Mountain - Lyon County 345.0kV (Solar / Battery Storage)
MINNESOTA MUNICIPAL POWER AGENCY M2PA
Redwood, TX | Filed 2026-09-09 | Target COD 2031-09-30
|
Cedar Mountain - Lyon County 345.0kV
345 kV | Solar / Battery Storage
|
500 MW
Est. Upg: $42.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 500 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4343 |
MISO J4343 - Cedar Mountain - Lyon County 345.0kV (Solar / Battery Storage)
AMEREN ILLINOIS $AEE
Redwood, TX | Filed 2026-09-09 | Target COD 2031-09-30
|
Cedar Mountain - Lyon County 345.0kV
345 kV | Solar / Battery Storage
|
500 MW
Est. Upg: $42.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 500 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4408 |
MISO J4408 - NORTHERN STATES POWER COMPANY Substation (Solar / Battery Storage)
NORTHERN STATES POWER COMPANY $XEL
Regional, TX | Filed 2026-09-04 | Target COD 2031-07-01
|
NORTHERN STATES POWER COMPANY Substation
345 kV | Solar / Battery Storage
|
500 MW
Est. Upg: $42.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 500 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| NYISO C26-0042 |
Adirondack Energy Storage Center (NYPA)
Adirondack Energy Storage LLC
Lewis County, NY | Filed 2026-08-27 | Target COD 2028-06-01
|
Adirondack 345kV substation
345 kV | Battery Energy Storage (BESS)
|
500 MW
Est. Upg: $42.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 500 MW (Battery Energy Storage (BESS)) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4388 |
MISO J4388 - MISO Transmission Owner Substation (Solar / Battery Storage)
MISO Transmission Owner
Regional, TX | Filed 2026-09-12 | Target COD 2028-02-01
|
MISO Transmission Owner Substation
345 kV | Solar / Battery Storage
|
499 MW
Est. Upg: $42.4M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 499 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4404 |
MISO J4404 - NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS Substation (Solar / Battery Storage)
NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS
Regional, TX | Filed 2026-09-10 | Target COD 2031-11-30
|
NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS Substation
345 kV | Solar / Battery Storage
|
490 MW
Est. Upg: $41.6M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 490 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4333 |
MISO J4333 - GREAT RIVER ENERGY Substation (Solar / Battery Storage)
GREAT RIVER ENERGY
Regional, TX | Filed 2026-09-03 | Target COD 2031-11-30
|
GREAT RIVER ENERGY Substation
345 kV | Solar / Battery Storage
|
490 MW
Est. Upg: $41.6M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 490 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4362 |
MISO J4362 - MISO Transmission Owner Substation (Solar / Battery Storage)
MISO Transmission Owner
Regional, TX | Filed 2026-09-03 | Target COD 2031-11-30
|
MISO Transmission Owner Substation
345 kV | Solar / Battery Storage
|
490 MW
Est. Upg: $41.6M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 490 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4372 |
MISO J4372 - NORTHERN STATES POWER COMPANY Substation (Solar / Battery Storage)
NORTHERN STATES POWER COMPANY $XEL
Regional, TX | Filed 2026-09-12 | Target COD 2031-12-31
|
NORTHERN STATES POWER COMPANY Substation
345 kV | Solar / Battery Storage
|
470 MW
Est. Upg: $40.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 470 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| NYISO C26-0051 |
Gowanus Gas Turbine Facility Repowering (CONED)
Astoria Generating Company, LP $ED
Kings County, Brooklyn, NY | Filed 2026-09-04 | Target COD 2028-06-01
|
Existing POI at Gowanus 138 kV, between brk # 2N and brk # 4N (42421 & 42423 to 42G13) and between brk # 2S and brk # 5S (42422 & 42424 to 42G24).
138 kV | CT
|
448 MW
Est. Upg: $38.1M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 448 MW (CT) interconnection on 138kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4389 |
MISO J4389 - MISO Transmission Owner Substation (Solar / Battery Storage)
MISO Transmission Owner
Regional, TX | Filed 2026-09-25 | Target COD 2031-06-30
|
MISO Transmission Owner Substation
345 kV | Solar / Battery Storage
|
430 MW
Est. Upg: $36.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 430 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| NYISO C26-0028 |
Northport Power Station (LIPA)
NGV Northport Energy Center LLC
Suffolk, NY | Filed 2026-08-20 | Target COD 2028-06-01
|
138 kV Northport Substation
138 kV | CC
|
427 MW
Est. Upg: $36.3M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 427 MW (CC) interconnection on 138kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| NYISO C26-0027 |
EF Barrett - 1 (NY Transco)
NGV Barrett Energy Center LLC
Nassau, NY | Filed 2026-08-18 | Target COD 2028-06-01
|
(New) 345 kV Barrett Propel Substation
345 kV | CC
|
427 MW
Est. Upg: $36.3M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 426 MW (CC) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4340 |
MISO J4340 - SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SO (Solar / Battery Storage)
SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH
Regional, TX | Filed 2026-09-09 | Target COD 2030-01-15
|
SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH Substation
345 kV | Solar / Battery Storage
|
415 MW
Est. Upg: $35.3M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 415 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4347 |
MISO J4347 - MIDAMERICAN ENERGY CO. MEC Substation (Solar / Battery Storage)
MIDAMERICAN ENERGY CO. MEC
Regional, TX | Filed 2026-09-11 | Target COD 2030-01-31
|
MIDAMERICAN ENERGY CO. MEC Substation
345 kV | Solar / Battery Storage
|
400 MW
Est. Upg: $34.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 400 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| NYISO C26-0056 |
Brooks Road BESS (RG&E)
Aurora Solar, LLC
Monroe, NY | Filed 2026-09-10 | Target COD 2028-06-01
|
345 kV S255
345 kV | Battery Energy Storage (BESS)
|
400 MW
Est. Upg: $34.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 400 MW (Battery Energy Storage (BESS)) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4394 |
MISO J4394 - NORTHERN STATES POWER COMPANY Substation (Solar / Battery Storage)
NORTHERN STATES POWER COMPANY $XEL
Regional, TX | Filed 2026-09-09 | Target COD 2030-08-31
|
NORTHERN STATES POWER COMPANY Substation
345 kV | Solar / Battery Storage
|
400 MW
Est. Upg: $34.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 400 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4370 |
MISO J4370 - NORTHERN STATES POWER COMPANY Substation (Solar / Battery Storage)
NORTHERN STATES POWER COMPANY $XEL
Regional, TX | Filed 2026-09-09 | Target COD 2031-10-09
|
NORTHERN STATES POWER COMPANY Substation
345 kV | Solar / Battery Storage
|
400 MW
Est. Upg: $34.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 400 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| NYISO C26-0009 |
Terrapin Storage (ConEd)
Terrapin Storage LLC $ED
Kings, NY | Filed 2026-07-31 | Target COD 2028-06-01
|
Gowanus 345 kV
345 kV | Battery Energy Storage (BESS)
|
400 MW
Est. Upg: $34.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 400 MW (Battery Energy Storage (BESS)) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| NYISO C24-233 |
Shallow Seam BESS (NYSEG)
Shallow Seam Energy Storage, LLC
Clearfield, PA | Filed 2024-09-22 | Target COD 2028-06-01
|
Homer City - Mainesburg 345kV Line (L47)
345 kV | Battery Energy Storage (BESS)
|
400 MW
Est. Upg: $34.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 400 MW (Battery Energy Storage (BESS)) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4391 |
MISO J4391 - GREAT RIVER ENERGY Substation (Solar / Battery Storage)
GREAT RIVER ENERGY
Regional, TX | Filed 2026-09-09 | Target COD 2031-11-30
|
GREAT RIVER ENERGY Substation
345 kV | Solar / Battery Storage
|
392 MW
Est. Upg: $33.3M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 392 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4354 |
MISO J4354 - MISO Transmission Owner Substation (Solar / Battery Storage)
MISO Transmission Owner
Regional, TX | Filed 2026-09-03 | Target COD 2031-11-30
|
MISO Transmission Owner Substation
345 kV | Solar / Battery Storage
|
392 MW
Est. Upg: $33.3M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 392 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| NYISO C24-190 |
North Country Wind II (NYPA)
NY North Country, LLC
Franklin and Clinton, NY | Filed 2024-09-18 | Target COD 2028-06-01
|
Willis-Haverstock 345kV HW1
345 kV | Onshore Wind
|
380 MW
Est. Upg: $32.3M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 380 MW (Onshore Wind) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4387 |
MISO J4387 - ENTERGY TEXAS, INC. ETTO Substation (Solar / Battery Storage)
ENTERGY TEXAS, INC. ETTO $ETR
Regional, TX | Filed 2026-09-10 | Target COD 2031-01-01
|
ENTERGY TEXAS, INC. ETTO Substation
345 kV | Solar / Battery Storage
|
350 MW
Est. Upg: $29.8M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 350 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| NYISO C26-0029-2 |
Patriot Forge Energy Center (NYSEG)
Patriot Forge PA, LLC
Tioga County, PA | Filed 2026-08-25 | Target COD 2028-06-01
|
Mainesburg to Homer City 345 kV Line 47
345 kV | Natural Gas / Peaker
|
350 MW
Est. Upg: $29.8M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 350 MW (Natural Gas / Peaker) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| NYISO C24-283 |
Resilient NY Energy Storage (ConEd)
Resilient NY Storage, LLC by Hanwha Energy USA Holdings Corporation $ED
Richmond, NY | Filed 2024-09-25 | Target COD 2028-06-01
|
Goethals 345 kV
345 kV | Battery Energy Storage (BESS)
|
349 MW
Est. Upg: $29.7M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 349 MW (Battery Energy Storage (BESS)) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4366 |
MISO J4366 - ALEXANDRIA - BISON 345.0kV (Solar / Battery Storage)
MISSOURI RIVER ENERGY SERVICES - TRANSMISSION
Clay, TX | Filed 2026-09-12 | Target COD 2031-11-30
|
ALEXANDRIA - BISON 345.0kV
345 kV | Solar / Battery Storage
|
343 MW
Est. Upg: $29.2M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 343 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4335 |
MISO J4335 - ALEXANDRIA - BISON 345.0kV (Solar / Battery Storage)
MISSOURI RIVER ENERGY SERVICES - TRANSMISSION
Clay, TX | Filed 2026-09-03 | Target COD 2031-11-30
|
ALEXANDRIA - BISON 345.0kV
345 kV | Solar / Battery Storage
|
343 MW
Est. Upg: $29.2M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 343 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| NYISO C26-0055 |
Roseton Energy Storage (CHG&E)
Roseton Energy Storage LLC
Orange County, NY | Filed 2026-09-10 | Target COD 2028-06-01
|
345 kV Roseton Substation
345 kV | Battery Energy Storage (BESS)
|
330 MW
Est. Upg: $28.1M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 330 MW (Battery Energy Storage (BESS)) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| NYISO C24-175 |
Stargazer I (NYSEG)
RWE Solar Development, LLC
McKean, PA | Filed 2024-09-17 | Target COD 2028-06-01
|
Homer City to Pierce Brook 345 kV Line
345 kV | CR
|
325 MW
Est. Upg: $27.6M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 325 MW (CR) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| NYISO C24-176 |
Stargazer II (NYSEG)
RWE Solar Development, LLC
McKean, PA | Filed 2024-09-17 | Target COD 2028-06-01
|
Homer City to Pierce Brook 345 kV Line
345 kV | CR
|
325 MW
Est. Upg: $27.6M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 325 MW (CR) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4399 |
MISO J4399 - MISO Transmission Owner Substation (Solar / Battery Storage)
MISO Transmission Owner
Regional, TX | Filed 2026-09-09 | Target COD 2031-11-30
|
MISO Transmission Owner Substation
345 kV | Solar / Battery Storage
|
319 MW
Est. Upg: $27.1M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 318 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM 7829 (ER27-225-000) |
§ 205(d) Rate Filing: Amendment to NUCRA, SA No. 7829; Network Upgrade(s) n8492.2 to be effective 12/21/2026.
PJM Interconnection, L.L.C
FERC Accession 20261021-5038, PJM | Filed 2026-10-26 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-225-000
345 kV | High-Voltage Grid Interconnection
|
300 MW
Est. Upg: $25.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 300 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-180-000 (ER27-180-000) |
§ 205(d) Rate Filing: Alabama Power Company submits tariff filing per 35.13(a)(2)(iii: Granceil Solar LGIA Amendment Filing to be effective 10/9/2026.
Alabama Power Company, Georgia Power Company, Mississippi Power Company $SO
FERC Accession 20261016-5072, PA | Filed 2026-10-21 | Target COD 2027-06-01
|
Alabama Power Company, Georgia Power Company, Mississippi Power Company - ER27-180-000
345 kV | Solar PV + Storage
|
300 MW
Est. Upg: $25.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 300 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM 7827 (ER27-182-000) |
§ 205(d) Rate Filing: Amendment to NUCRA, SA No. 7827; Network Upgrade(s) n8492 to be effective 12/16/2026.
PJM Interconnection, L.L.C
FERC Accession 20261016-5085, PJM | Filed 2026-10-21 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-182-000
345 kV | High-Voltage Grid Interconnection
|
300 MW
Est. Upg: $25.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 300 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-72-000 (ER27-72-000) |
205(d) Rate Filing: Alabama Power Company submits tariff filing per 35.13(a)(2)(iii: Eutaw Solar LGIA Filing to be effective 9/24/2026.
Alabama Power Company, Georgia Power Company, Mississippi Power Company $SO
FERC Accession 20261007-5123, PA | Filed 2026-10-13 | Target COD 2027-06-01
|
Alabama Power Company, Georgia Power Company, Mississippi Power Company - ER27-72-000
345 kV | Solar PV + Storage
|
300 MW
Est. Upg: $25.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 300 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| NYISO ER27-51-000 (ER27-51-000) |
§ 205(d) Rate Filing: New York Independent System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: NYISO-NYPA Joint 205: Amended LGIA Harlem River Yar
New York Independent System Operator, Inc., Power Authority of the State of New York
FERC Accession 20261005-5238, NY | Filed 2026-10-09 | Target COD 2027-06-01
|
New York Independent System Operator, Inc., Power Authority of the State of New - ER27-51-000
345 kV | Natural Gas / Dispatchable
|
300 MW
Est. Upg: $25.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 300 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-45-000 (ER27-45-000) |
§ 205(d) Rate Filing: Alabama Power Company submits tariff filing per 35.13(a)(2)(iii: EG Hickory (Hickory Solar Project) LGIA Filing to be effective 9/23/2026.
Alabama Power Company, Georgia Power Company, Mississippi Power Company $SO
FERC Accession 20261005-5083, PA | Filed 2026-10-08 | Target COD 2027-06-01
|
Alabama Power Company, Georgia Power Company, Mississippi Power Company - ER27-45-000
345 kV | Solar PV + Storage
|
300 MW
Est. Upg: $25.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 300 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-46-000 (ER27-46-000) |
§ 205(d) Rate Filing: Alabama Power Company submits tariff filing per 35.13(a)(2)(iii: EG Magnolia (Magnolia Solar Project) LGIA Filing to be effective 9/23/202
Alabama Power Company, Mississippi Power Company, Georgia Power Company $SO
FERC Accession 20261005-5085, PA | Filed 2026-10-08 | Target COD 2027-06-01
|
Alabama Power Company, Mississippi Power Company, Georgia Power Company - ER27-46-000
345 kV | Solar PV + Storage
|
300 MW
Est. Upg: $25.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 300 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-47-000 (ER27-47-000) |
§ 205(d) Rate Filing: Alabama Power Company submits tariff filing per 35.13(a)(2)(iii: High Cotton Solar LGIA Filing to be effective 9/23/2026.
Alabama Power Company, Georgia Power Company, Mississippi Power Company $SO
FERC Accession 20261005-5087, PA | Filed 2026-10-08 | Target COD 2027-06-01
|
Alabama Power Company, Georgia Power Company, Mississippi Power Company - ER27-47-000
345 kV | Solar PV + Storage
|
300 MW
Est. Upg: $25.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 300 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-48-000 (ER27-48-000) |
§ 205(d) Rate Filing: Alabama Power Company submits tariff filing per 35.13(a)(2)(iii: Pine Meadow Solar LGIA Filing to be effective 9/23/2026.
Alabama Power Company, Georgia Power Company, Mississippi Power Company $SO
FERC Accession 20261005-5089, PA | Filed 2026-10-08 | Target COD 2027-06-01
|
Alabama Power Company, Georgia Power Company, Mississippi Power Company - ER27-48-000
345 kV | Solar PV + Storage
|
300 MW
Est. Upg: $25.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 300 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-29-000 (ER27-29-000) |
§ 205(d) Rate Filing: Alabama Power Company submits tariff filing per 35.13(a)(2)(iii: Longleaf Generating Facility LGIA Filing to be effective 9/21/2026.
Alabama Power Company, Georgia Power Company, Mississippi Power Company $SO
FERC Accession 20261002-5103, PA | Filed 2026-10-08 | Target COD 2027-06-01
|
Alabama Power Company, Georgia Power Company, Mississippi Power Company - ER27-29-000
345 kV | Natural Gas / Dispatchable
|
300 MW
Est. Upg: $25.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 300 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4310 |
MISO J4310 - HOOSIER ENERGY Substation (Solar / Battery Storage)
HOOSIER ENERGY
Regional, TX | Filed 2026-09-22 | Target COD 2029-09-15
|
HOOSIER ENERGY Substation
345 kV | Solar / Battery Storage
|
300 MW
Est. Upg: $25.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 300 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| NYISO C26-0057 |
Selkirk Shores BESS (NM-NG)
Aurora Solar, LLC
Oswego, NY | Filed 2026-09-10 | Target COD 2028-06-01
|
345kV OSWEGO -VOLNEY 345 KV LINE
345 kV | Battery Energy Storage (BESS)
|
300 MW
Est. Upg: $25.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 300 MW (Battery Energy Storage (BESS)) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4407 |
MISO J4407 - MISO Transmission Owner Substation (Solar / Battery Storage)
MISO Transmission Owner
Regional, TX | Filed 2026-09-10 | Target COD 2031-09-01
|
MISO Transmission Owner Substation
345 kV | Solar / Battery Storage
|
300 MW
Est. Upg: $25.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 300 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4380 |
MISO J4380 - DUKE ENERGY INDIANA, LLC CIN Substation (Solar / Battery Storage)
DUKE ENERGY INDIANA, LLC CIN $DUK
Regional, TX | Filed 2026-09-10 | Target COD 2030-05-31
|
DUKE ENERGY INDIANA, LLC CIN Substation
345 kV | Solar / Battery Storage
|
300 MW
Est. Upg: $25.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 300 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4382 |
MISO J4382 - MIDAMERICAN ENERGY CO. MEC Substation (Solar / Battery Storage)
MIDAMERICAN ENERGY CO. MEC
Regional, TX | Filed 2026-09-10 | Target COD 2030-05-31
|
MIDAMERICAN ENERGY CO. MEC Substation
345 kV | Solar / Battery Storage
|
300 MW
Est. Upg: $25.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 300 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4344 |
MISO J4344 - Oreana (Solar / Battery Storage)
AMEREN ILLINOIS $AEE
Macon, TX | Filed 2026-09-09 | Target COD 2028-09-06
|
Oreana
345 kV | Solar / Battery Storage
|
300 MW
Est. Upg: $25.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 300 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4397 |
MISO J4397 - MINNESOTA POWER INC. Substation (Solar / Battery Storage)
MINNESOTA POWER INC.
Regional, TX | Filed 2026-09-09 | Target COD 2031-06-30
|
MINNESOTA POWER INC. Substation
345 kV | Solar / Battery Storage
|
300 MW
Est. Upg: $25.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 300 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4320 |
MISO J4320 - CLECO POWER LLC CLEC Substation (Solar / Battery Storage)
CLECO POWER LLC CLEC
Regional, TX | Filed 2026-09-09 | Target COD 2029-03-01
|
CLECO POWER LLC CLEC Substation
345 kV | Solar / Battery Storage
|
300 MW
Est. Upg: $25.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 300 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4302 |
MISO J4302 - CLECO POWER LLC CLEC Substation (Solar / Battery Storage)
CLECO POWER LLC CLEC
Regional, TX | Filed 2026-09-08 | Target COD 2030-10-01
|
CLECO POWER LLC CLEC Substation
345 kV | Solar / Battery Storage
|
300 MW
Est. Upg: $25.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 300 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4306 |
MISO J4306 - Other_ (Solar / Battery Storage)
NORTHERN STATES POWER COMPANY $XEL
Ford, TX | Filed 2026-09-08 | Target COD 2031-06-30
|
Other_
345 kV | Solar / Battery Storage
|
300 MW
Est. Upg: $25.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 300 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4351 |
MISO J4351 - MISO Transmission Owner Substation (Solar / Battery Storage)
MISO Transmission Owner
Regional, TX | Filed 2026-09-05 | Target COD 2031-09-30
|
MISO Transmission Owner Substation
345 kV | Solar / Battery Storage
|
300 MW
Est. Upg: $25.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 300 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4332 |
MISO J4332 - MIDAMERICAN ENERGY CO. MEC Substation (Solar / Battery Storage)
MIDAMERICAN ENERGY CO. MEC
Regional, TX | Filed 2026-09-03 | Target COD 2031-06-01
|
MIDAMERICAN ENERGY CO. MEC Substation
345 kV | Solar / Battery Storage
|
300 MW
Est. Upg: $25.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 300 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4338 |
MISO J4338 - GREAT RIVER ENERGY Substation (Solar / Battery Storage)
GREAT RIVER ENERGY
Regional, TX | Filed 2026-09-03 | Target COD 2030-06-01
|
GREAT RIVER ENERGY Substation
345 kV | Solar / Battery Storage
|
300 MW
Est. Upg: $25.5M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 300 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4356 |
MISO J4356 - MISO Transmission Owner Substation (Solar / Battery Storage)
MISO Transmission Owner
Regional, TX | Filed 2026-09-03 | Target COD 2031-11-30
|
MISO Transmission Owner Substation
345 kV | Solar / Battery Storage
|
294 MW
Est. Upg: $25.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 294 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4334 |
MISO J4334 - AMEREN TRANSMISSION COMPANY OF ILLINOIS Substation (Solar / Battery Storage)
AMEREN TRANSMISSION COMPANY OF ILLINOIS $AEE
Regional, TX | Filed 2026-09-03 | Target COD 2031-11-30
|
AMEREN TRANSMISSION COMPANY OF ILLINOIS Substation
345 kV | Solar / Battery Storage
|
294 MW
Est. Upg: $25.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 294 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4365 |
MISO J4365 - MISO Transmission Owner Substation (Solar / Battery Storage)
MISO Transmission Owner
Regional, TX | Filed 2026-09-08 | Target COD 2031-11-30
|
MISO Transmission Owner Substation
345 kV | Solar / Battery Storage
|
270 MW
Est. Upg: $22.9M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 269 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| FERC ER26-2026-23885 |
FERC Combined Notice of Filings (2026-11-24) - Doc 2026-23885
FERC Open Access Transmission Filers
Multi-ISO, US | Filed 2026-11-24 | Target COD 2027-12
|
Combined Notice of Filings #1
345 kV | Large Generator Interconnection / OATT
|
250 MW
Est. Upg: $12.5M
|
TRANSFORMER / HV EPC PROCUREMENT
Lead Risk: HIGH - 110-140 Wk HV Transformer Lead
Combined Notice of Filings #1
|
Official Filing ↗ |
| FERC ER26-2026-22189 |
FERC Combined Notice of Filings (2026-10-30) - Doc 2026-22189
FERC Open Access Transmission Filers
Multi-ISO, US | Filed 2026-10-30 | Target COD 2027-12
|
Combined Notice of Filings #1
345 kV | Large Generator Interconnection / OATT
|
250 MW
Est. Upg: $12.5M
|
TRANSFORMER / HV EPC PROCUREMENT
Lead Risk: HIGH - 110-140 Wk HV Transformer Lead
Combined Notice of Filings #1
|
Official Filing ↗ |
| FERC ER26-2026-21877 |
FERC Combined Notice of Filings (2026-10-27) - Doc 2026-21877
FERC Open Access Transmission Filers
Multi-ISO, US | Filed 2026-10-27 | Target COD 2027-12
|
Combined Notice of Filings #1
345 kV | Large Generator Interconnection / OATT
|
250 MW
Est. Upg: $12.5M
|
TRANSFORMER / HV EPC PROCUREMENT
Lead Risk: HIGH - 110-140 Wk HV Transformer Lead
Combined Notice of Filings #1
|
Official Filing ↗ |
| FERC ER26-2026-21876 |
FERC Combined Notice of Filings (2026-10-27) - Doc 2026-21876
FERC Open Access Transmission Filers
Multi-ISO, US | Filed 2026-10-27 | Target COD 2027-12
|
Combined Notice of Filings #2
345 kV | Large Generator Interconnection / OATT
|
250 MW
Est. Upg: $12.5M
|
TRANSFORMER / HV EPC PROCUREMENT
Lead Risk: HIGH - 110-140 Wk HV Transformer Lead
Combined Notice of Filings #2
|
Official Filing ↗ |
| FERC ER26-2026-21489 |
FERC Combined Notice of Filings (2026-10-21) - Doc 2026-21489
FERC Open Access Transmission Filers
Multi-ISO, US | Filed 2026-10-21 | Target COD 2027-12
|
Combined Notice of Filings #1
345 kV | Large Generator Interconnection / OATT
|
250 MW
Est. Upg: $12.5M
|
TRANSFORMER / HV EPC PROCUREMENT
Lead Risk: HIGH - 110-140 Wk HV Transformer Lead
Combined Notice of Filings #1
|
Official Filing ↗ |
| FERC ER26-2026-21282 |
FERC Combined Notice of Filings (2026-10-19) - Doc 2026-21282
FERC Open Access Transmission Filers
Multi-ISO, US | Filed 2026-10-19 | Target COD 2027-12
|
Combined Notice of Filings #1
345 kV | Large Generator Interconnection / OATT
|
250 MW
Est. Upg: $12.5M
|
TRANSFORMER / HV EPC PROCUREMENT
Lead Risk: HIGH - 110-140 Wk HV Transformer Lead
Combined Notice of Filings #1
|
Official Filing ↗ |
| FERC ER26-2026-20852 |
FERC Combined Notice of Filings (2026-10-13) - Doc 2026-20852
FERC Open Access Transmission Filers
Multi-ISO, US | Filed 2026-10-13 | Target COD 2027-12
|
Combined Notice of Filings #1
345 kV | Large Generator Interconnection / OATT
|
250 MW
Est. Upg: $12.5M
|
TRANSFORMER / HV EPC PROCUREMENT
Lead Risk: HIGH - 110-140 Wk HV Transformer Lead
Combined Notice of Filings #1
|
Official Filing ↗ |
| FERC ER26-2026-20583 |
FERC Combined Notice of Filings (2026-10-08) - Doc 2026-20583
FERC Open Access Transmission Filers
Multi-ISO, US | Filed 2026-10-08 | Target COD 2027-12
|
Combined Notice of Filings #1
345 kV | Large Generator Interconnection / OATT
|
250 MW
Est. Upg: $12.5M
|
TRANSFORMER / HV EPC PROCUREMENT
Lead Risk: HIGH - 110-140 Wk HV Transformer Lead
Combined Notice of Filings #1
|
Official Filing ↗ |
| FERC ER26-2026-20216 |
FERC Combined Notice of Filings (2026-10-02) - Doc 2026-20216
FERC Open Access Transmission Filers
Multi-ISO, US | Filed 2026-10-02 | Target COD 2027-12
|
Combined Notice of Filings #1
345 kV | Large Generator Interconnection / OATT
|
250 MW
Est. Upg: $12.5M
|
TRANSFORMER / HV EPC PROCUREMENT
Lead Risk: HIGH - 110-140 Wk HV Transformer Lead
Combined Notice of Filings #1
|
Official Filing ↗ |
| FERC ER26-2026-19982 |
FERC Combined Notice of Filings (2026-09-30) - Doc 2026-19982
FERC Open Access Transmission Filers
Multi-ISO, US | Filed 2026-09-30 | Target COD 2027-12
|
Combined Notice of Filings #1
345 kV | Large Generator Interconnection / OATT
|
250 MW
Est. Upg: $12.5M
|
TRANSFORMER / HV EPC PROCUREMENT
Lead Risk: HIGH - 110-140 Wk HV Transformer Lead
Combined Notice of Filings #1
|
Official Filing ↗ |
| FERC ER26-2026-19746 |
FERC Combined Notice of Filings (2026-09-28) - Doc 2026-19746
FERC Open Access Transmission Filers
Multi-ISO, US | Filed 2026-09-28 | Target COD 2027-12
|
Combined Notice of Filings #1
345 kV | Large Generator Interconnection / OATT
|
250 MW
Est. Upg: $12.5M
|
TRANSFORMER / HV EPC PROCUREMENT
Lead Risk: HIGH - 110-140 Wk HV Transformer Lead
Combined Notice of Filings #1
|
Official Filing ↗ |
| FERC ER26-2026-19574 |
FERC Combined Notice of Filings (2026-09-24) - Doc 2026-19574
FERC Open Access Transmission Filers
Multi-ISO, US | Filed 2026-09-24 | Target COD 2027-12
|
Combined Notice of Filings #1
345 kV | Large Generator Interconnection / OATT
|
250 MW
Est. Upg: $12.5M
|
TRANSFORMER / HV EPC PROCUREMENT
Lead Risk: HIGH - 110-140 Wk HV Transformer Lead
Combined Notice of Filings #1
|
Official Filing ↗ |
| FERC ER26-2026-18633 |
FERC Combined Notice of Filings (2026-09-14) - Doc 2026-18633
FERC Open Access Transmission Filers
Multi-ISO, US | Filed 2026-09-14 | Target COD 2027-12
|
Combined Notice of Filings #1
345 kV | Large Generator Interconnection / OATT
|
250 MW
Est. Upg: $12.5M
|
TRANSFORMER / HV EPC PROCUREMENT
Lead Risk: HIGH - 110-140 Wk HV Transformer Lead
Combined Notice of Filings #1
|
Official Filing ↗ |
| MISO J4383 |
MISO J4383 - ITC MIDWEST Substation (Solar / Battery Storage)
ITC MIDWEST
Regional, TX | Filed 2026-09-11 | Target COD 2031-06-30
|
ITC MIDWEST Substation
345 kV | Solar / Battery Storage
|
250 MW
Est. Upg: $21.3M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 250 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4374 |
MISO J4374 - OTTER TAIL POWER COMPANY OTP Substation (Solar / Battery Storage)
OTTER TAIL POWER COMPANY OTP
Regional, TX | Filed 2026-09-10 | Target COD 2031-06-30
|
OTTER TAIL POWER COMPANY OTP Substation
345 kV | Solar / Battery Storage
|
250 MW
Est. Upg: $21.3M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 250 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4373 |
MISO J4373 - ITC MIDWEST Substation (Solar / Battery Storage)
ITC MIDWEST
Regional, TX | Filed 2026-09-10 | Target COD 2031-06-30
|
ITC MIDWEST Substation
345 kV | Solar / Battery Storage
|
250 MW
Est. Upg: $21.3M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 250 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4396 |
MISO J4396 - NORTHERN STATES POWER COMPANY Substation (Solar / Battery Storage)
NORTHERN STATES POWER COMPANY $XEL
Regional, TX | Filed 2026-09-10 | Target COD 2031-06-30
|
NORTHERN STATES POWER COMPANY Substation
345 kV | Solar / Battery Storage
|
250 MW
Est. Upg: $21.3M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 250 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4385 |
MISO J4385 - ENTERGY TEXAS, INC. ETTO Substation (Solar / Battery Storage)
ENTERGY TEXAS, INC. ETTO $ETR
Regional, TX | Filed 2026-09-10 | Target COD 2031-10-24
|
ENTERGY TEXAS, INC. ETTO Substation
345 kV | Solar / Battery Storage
|
250 MW
Est. Upg: $21.3M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 250 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4309 |
MISO J4309 - Other_ (Solar / Battery Storage)
MISO Transmission Owner
Ford, TX | Filed 2026-09-10 | Target COD 2031-04-30
|
Other_
345 kV | Solar / Battery Storage
|
250 MW
Est. Upg: $21.3M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 250 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4376 |
MISO J4376 - NORTHERN STATES POWER COMPANY Substation (Solar / Battery Storage)
NORTHERN STATES POWER COMPANY $XEL
Regional, TX | Filed 2026-09-09 | Target COD 2031-06-30
|
NORTHERN STATES POWER COMPANY Substation
345 kV | Solar / Battery Storage
|
250 MW
Est. Upg: $21.3M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 250 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4375 |
MISO J4375 - OTTER TAIL POWER COMPANY OTP Substation (Solar / Battery Storage)
OTTER TAIL POWER COMPANY OTP
Regional, TX | Filed 2026-09-09 | Target COD 2031-06-30
|
OTTER TAIL POWER COMPANY OTP Substation
345 kV | Solar / Battery Storage
|
250 MW
Est. Upg: $21.3M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 250 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4321 |
MISO J4321 - Cedar Mountain - Lyon County 345.0kV (Solar / Battery Storage)
AMEREN ILLINOIS $AEE
Redwood, TX | Filed 2026-09-09 | Target COD 2031-09-30
|
Cedar Mountain - Lyon County 345.0kV
345 kV | Solar / Battery Storage
|
250 MW
Est. Upg: $21.3M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 250 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| FERC ER26-2026-18232 |
FERC Combined Notice of Filings (2026-09-08) - Doc 2026-18232
FERC Open Access Transmission Filers
Multi-ISO, US | Filed 2026-09-08 | Target COD 2027-12
|
Combined Notice of Filings
345 kV | Large Generator Interconnection / OATT
|
250 MW
Est. Upg: $12.5M
|
TRANSFORMER / HV EPC PROCUREMENT
Lead Risk: HIGH - 110-140 Wk HV Transformer Lead
Combined Notice of Filings
|
Official Filing ↗ |
| MISO J4352 |
MISO J4352 - MISO Transmission Owner Substation (Solar / Battery Storage)
MISO Transmission Owner
Regional, TX | Filed 2026-09-04 | Target COD 2031-06-01
|
MISO Transmission Owner Substation
345 kV | Solar / Battery Storage
|
250 MW
Est. Upg: $21.3M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 250 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4336 |
MISO J4336 - AMEREN TRANSMISSION COMPANY OF ILLINOIS Substation (Solar / Battery Storage)
AMEREN TRANSMISSION COMPANY OF ILLINOIS $AEE
Regional, TX | Filed 2026-09-04 | Target COD 2030-04-15
|
AMEREN TRANSMISSION COMPANY OF ILLINOIS Substation
345 kV | Solar / Battery Storage
|
250 MW
Est. Upg: $21.3M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 250 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4357 |
MISO J4357 - MISO Transmission Owner Substation (Solar / Battery Storage)
MISO Transmission Owner
Regional, TX | Filed 2026-09-04 | Target COD 2030-09-15
|
MISO Transmission Owner Substation
345 kV | Solar / Battery Storage
|
250 MW
Est. Upg: $21.3M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 250 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| NYISO C26-0022 |
Clay Energy Storage 1 (NM-NG)
Terra-Gen Development Company, LLC
Onondaga, NY | Filed 2026-08-13 | Target COD 2028-06-01
|
Clay 345 kV Substation
345 kV | Battery Energy Storage (BESS)
|
250 MW
Est. Upg: $21.3M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 250 MW (Battery Energy Storage (BESS)) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| NYISO C26-0016 |
Arch 5 (CHG&E)
Terra-Gen Development Company, LLC
Orange, NY | Filed 2026-07-31 | Target COD 2028-06-01
|
Rock Tavern 345 kV Substation
345 kV | Battery Energy Storage (BESS)
|
250 MW
Est. Upg: $21.3M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 250 MW (Battery Energy Storage (BESS)) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| NYISO C24-301 |
Moonlight Flats Solar (NYSEG)
Moonlight Flats Solar Power, LLC
Clearfield, PA | Filed 2024-09-30 | Target COD 2028-06-01
|
Homer City 345 kV to Mainesburg 345 kV L47
345 kV | Solar PV
|
250 MW
Est. Upg: $21.3M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 250 MW (Solar PV) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4400 |
MISO J4400 - MISO Transmission Owner Substation (Solar / Battery Storage)
MISO Transmission Owner
Regional, TX | Filed 2026-09-09 | Target COD 2031-11-30
|
MISO Transmission Owner Substation
345 kV | Solar / Battery Storage
|
245 MW
Est. Upg: $20.8M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 245 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4301 |
MISO J4301 - 7FARGO - 7SANDBURG 345.0kV (Solar / Battery Storage)
AMEREN ILLINOIS $AEE
Peoria, TX | Filed 2026-09-08 | Target COD 2031-11-01
|
7FARGO - 7SANDBURG 345.0kV
345 kV | Solar / Battery Storage
|
240 MW
Est. Upg: $20.4M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 240 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| NYISO C24-363 |
Town Line Solar CSR Phase I (NYPA)
RWE Solar Development, LLC
Sullivan, NY | Filed 2024-10-15 | Target COD 2028-06-01
|
Coopers Corner to Middletown Tap 345 kV Line
345 kV | CR
|
240 MW
Est. Upg: $20.4M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 240 MW (CR) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4411 |
MISO J4411 - ENTERGY TEXAS, INC. ETTO Substation (Solar / Battery Storage)
ENTERGY TEXAS, INC. ETTO $ETR
Regional, TX | Filed 2026-09-11 | Target COD 2030-10-01
|
ENTERGY TEXAS, INC. ETTO Substation
345 kV | Solar / Battery Storage
|
226 MW
Est. Upg: $19.2M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 226 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| ERCOT EG27-15-000 (EG27-15-000) |
Southern Select Energy Storage LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status.
Southern Select Energy Storage LLC
FERC Accession 20261020-5196, TX | Filed 2026-10-26 | Target COD 2027-06-01
|
Southern Select Energy Storage LLC - EG27-15-000
345 kV | Battery Energy Storage (BESS)
|
220 MW
Est. Upg: $18.7M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 220 MW (Battery Energy Storage (BESS)) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| ERCOT EG27-13-000 (EG27-13-000) |
Appomattox VA BESS 1 LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status.
Appomattox VA BESS 1 LLC
FERC Accession 20261013-5513, TX | Filed 2026-10-21 | Target COD 2027-06-01
|
Appomattox VA BESS 1 LLC - EG27-13-000
345 kV | Battery Energy Storage (BESS)
|
220 MW
Est. Upg: $18.7M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 220 MW (Battery Energy Storage (BESS)) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| ERCOT EG27-11-000 (EG27-11-000) |
Boxcar Energy Storage, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status.
Boxcar Energy Storage, LLC
FERC Accession 20261013-5456, TX | Filed 2026-10-19 | Target COD 2027-06-01
|
Boxcar Energy Storage, LLC - EG27-11-000
345 kV | Battery Energy Storage (BESS)
|
220 MW
Est. Upg: $18.7M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 220 MW (Battery Energy Storage (BESS)) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| ERCOT EG27-12-000 (EG27-12-000) |
City Breeze BESS LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status.
City Breeze BESS LLC
FERC Accession 20261013-5462, TX | Filed 2026-10-19 | Target COD 2027-06-01
|
City Breeze BESS LLC - EG27-12-000
345 kV | Battery Energy Storage (BESS)
|
220 MW
Est. Upg: $18.7M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 220 MW (Battery Energy Storage (BESS)) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| ERCOT EG27-9-000 (EG27-9-000) |
Sunrise Wind LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status.
Sunrise Wind LLC
FERC Accession 20261009-5174, TX | Filed 2026-10-16 | Target COD 2027-06-01
|
Sunrise Wind LLC - EG27-9-000
345 kV | Wind Generation
|
220 MW
Est. Upg: $18.7M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 220 MW (Wind Generation) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| ERCOT EG27-10-000 (EG27-10-000) |
Northfield BESS 1 LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status.
Northfield BESS 1 LLC
FERC Accession 20261013-5101, TX | Filed 2026-10-16 | Target COD 2027-06-01
|
Northfield BESS 1 LLC - EG27-10-000
345 kV | Battery Energy Storage (BESS)
|
220 MW
Est. Upg: $18.7M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 220 MW (Battery Energy Storage (BESS)) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| ERCOT EG27-4-000 (EG27-4-000) |
Williams Power, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status.
Williams Power, LLC
FERC Accession 20261008-5072, TX | Filed 2026-10-14 | Target COD 2027-06-01
|
Williams Power, LLC - EG27-4-000
345 kV | Natural Gas / Dispatchable
|
220 MW
Est. Upg: $18.7M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 220 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| ERCOT EG27-5-000 (EG27-5-000) |
Fletcher Power, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status.
Fletcher Power, LLC
FERC Accession 20261008-5073, TX | Filed 2026-10-14 | Target COD 2027-06-01
|
Fletcher Power, LLC - EG27-5-000
345 kV | Natural Gas / Dispatchable
|
220 MW
Est. Upg: $18.7M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 220 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| ERCOT EG27-6-000 (EG27-6-000) |
Village BESS I LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status.
Village BESS I LLC
FERC Accession 20261008-5074, TX | Filed 2026-10-14 | Target COD 2027-06-01
|
Village BESS I LLC - EG27-6-000
345 kV | Battery Energy Storage (BESS)
|
220 MW
Est. Upg: $18.7M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 220 MW (Battery Energy Storage (BESS)) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| ERCOT LLC (EG27-7-000) |
Marici Project LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status.
Marici Project LLC
FERC Accession 20261008-5075, TX | Filed 2026-10-14 | Target COD 2027-06-01
|
Marici Project LLC - EG27-7-000
345 kV | High-Voltage Grid Interconnection
|
220 MW
Est. Upg: $18.7M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 220 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| ERCOT EG27-8-000 (EG27-8-000) |
Bypass BESS II LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status.
Bypass BESS II LLC
FERC Accession 20261008-5076, TX | Filed 2026-10-14 | Target COD 2027-06-01
|
Bypass BESS II LLC - EG27-8-000
345 kV | Battery Energy Storage (BESS)
|
220 MW
Est. Upg: $18.7M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 220 MW (Battery Energy Storage (BESS)) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| ERCOT EG27-3-000 (EG27-3-000) |
Kyan Solar, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status.
Kyan Solar, LLC
FERC Accession 20261007-5006, TX | Filed 2026-10-13 | Target COD 2027-06-01
|
Kyan Solar, LLC - EG27-3-000
345 kV | Solar PV + Storage
|
220 MW
Est. Upg: $18.7M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 220 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| ERCOT EG27-2-000 (EG27-2-000) |
Notch Peak Project, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status.
Notch Peak Project, LLC
FERC Accession 20261006-5130, TX | Filed 2026-10-09 | Target COD 2027-06-01
|
Notch Peak Project, LLC - EG27-2-000
345 kV | High-Voltage Grid Interconnection
|
220 MW
Est. Upg: $18.7M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 220 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| ERCOT EG27-1-000 (EG27-1-000) |
Blackwater Solar Center, LLC submits Notice of Self-Certification of Exempt Wholesale Generator Status.
Blackwater Solar Center, LLC
FERC Accession 20261002-5055, TX | Filed 2026-10-08 | Target COD 2027-06-01
|
Blackwater Solar Center, LLC - EG27-1-000
345 kV | Solar PV + Storage
|
220 MW
Est. Upg: $18.7M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 220 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4326 |
MISO J4326 - MISO Transmission Owner Substation (Solar / Battery Storage)
MISO Transmission Owner
Regional, TX | Filed 2026-09-21 | Target COD 2030-10-01
|
MISO Transmission Owner Substation
345 kV | Solar / Battery Storage
|
200 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 200 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4368 |
MISO J4368 - ITC MIDWEST Substation (Solar / Battery Storage)
ITC MIDWEST
Regional, TX | Filed 2026-09-12 | Target COD 2031-06-30
|
ITC MIDWEST Substation
345 kV | Solar / Battery Storage
|
200 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 200 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4402 |
MISO J4402 - J2192 POI (Solar / Battery Storage)
AMEREN TRANSMISSION COMPANY OF ILLINOIS $AEE
Vermilion, TX | Filed 2026-09-11 | Target COD 2030-07-01
|
J2192 POI
345 kV | Solar / Battery Storage
|
200 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 200 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4350 |
MISO J4350 - MISO Transmission Owner Substation (Solar / Battery Storage)
MISO Transmission Owner
Regional, TX | Filed 2026-09-11 | Target COD 2031-01-01
|
MISO Transmission Owner Substation
345 kV | Solar / Battery Storage
|
200 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 200 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4405 |
MISO J4405 - ENTERGY ARKANSAS, LLC EATO Substation (Solar / Battery Storage)
ENTERGY ARKANSAS, LLC EATO $ETR
Regional, TX | Filed 2026-09-11 | Target COD 2031-12-01
|
ENTERGY ARKANSAS, LLC EATO Substation
345 kV | Solar / Battery Storage
|
200 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 200 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4378 |
MISO J4378 - MISO Transmission Owner Substation (Solar / Battery Storage)
MISO Transmission Owner
Regional, TX | Filed 2026-09-10 | Target COD 2031-05-07
|
MISO Transmission Owner Substation
345 kV | Solar / Battery Storage
|
200 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 200 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4348 |
MISO J4348 - NORTHERN STATES POWER COMPANY Substation (Solar / Battery Storage)
NORTHERN STATES POWER COMPANY $XEL
Regional, TX | Filed 2026-09-10 | Target COD 2030-01-31
|
NORTHERN STATES POWER COMPANY Substation
345 kV | Solar / Battery Storage
|
200 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 200 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4363 |
MISO J4363 - AMEREN TRANSMISSION COMPANY OF ILLINOIS Substation (Solar / Battery Storage)
AMEREN TRANSMISSION COMPANY OF ILLINOIS $AEE
Regional, TX | Filed 2026-09-10 | Target COD 2029-09-01
|
AMEREN TRANSMISSION COMPANY OF ILLINOIS Substation
345 kV | Solar / Battery Storage
|
200 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 200 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4311 |
MISO J4311 - OTTER TAIL POWER COMPANY OTP Substation (Solar / Battery Storage)
OTTER TAIL POWER COMPANY OTP
Regional, TX | Filed 2026-09-10 | Target COD 2030-07-19
|
OTTER TAIL POWER COMPANY OTP Substation
345 kV | Solar / Battery Storage
|
200 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 200 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4364 |
MISO J4364 - NORTHERN STATES POWER COMPANY Substation (Solar / Battery Storage)
NORTHERN STATES POWER COMPANY $XEL
Regional, TX | Filed 2026-09-10 | Target COD 2029-09-01
|
NORTHERN STATES POWER COMPANY Substation
345 kV | Solar / Battery Storage
|
200 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 200 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4303 |
MISO J4303 - MISO Transmission Owner Substation (Solar / Battery Storage)
MISO Transmission Owner
Regional, TX | Filed 2026-09-09 | Target COD 2031-06-30
|
MISO Transmission Owner Substation
345 kV | Solar / Battery Storage
|
200 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 200 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4304 |
MISO J4304 - MISO Transmission Owner Substation (Solar / Battery Storage)
MISO Transmission Owner
Regional, TX | Filed 2026-09-09 | Target COD 2031-09-01
|
MISO Transmission Owner Substation
345 kV | Solar / Battery Storage
|
200 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 200 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4345 |
MISO J4345 - ITC MIDWEST Substation (Solar / Battery Storage)
ITC MIDWEST
Regional, TX | Filed 2026-09-08 | Target COD 2028-06-01
|
ITC MIDWEST Substation
345 kV | Solar / Battery Storage
|
200 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 200 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4319 |
MISO J4319 - ITC MIDWEST Substation (Solar / Battery Storage)
ITC MIDWEST
Regional, TX | Filed 2026-09-08 | Target COD 2028-06-01
|
ITC MIDWEST Substation
345 kV | Solar / Battery Storage
|
200 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 200 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4358 |
MISO J4358 - MISO Transmission Owner Substation (Solar / Battery Storage)
MISO Transmission Owner
Regional, TX | Filed 2026-09-08 | Target COD 2031-01-14
|
MISO Transmission Owner Substation
345 kV | Solar / Battery Storage
|
200 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 200 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4312 |
MISO J4312 - CLECO POWER LLC CLEC Substation (Solar / Battery Storage)
CLECO POWER LLC CLEC
Regional, TX | Filed 2026-09-05 | Target COD 2030-10-01
|
CLECO POWER LLC CLEC Substation
345 kV | Solar / Battery Storage
|
200 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 200 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4297 |
MISO J4297 - OTTER TAIL POWER COMPANY OTP Substation (Solar / Battery Storage)
OTTER TAIL POWER COMPANY OTP
Regional, TX | Filed 2026-09-04 | Target COD 2030-07-01
|
OTTER TAIL POWER COMPANY OTP Substation
345 kV | Solar / Battery Storage
|
200 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 200 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4337 |
MISO J4337 - MIDAMERICAN ENERGY CO. MEC Substation (Solar / Battery Storage)
MIDAMERICAN ENERGY CO. MEC
Regional, TX | Filed 2026-09-03 | Target COD 2028-06-01
|
MIDAMERICAN ENERGY CO. MEC Substation
345 kV | Solar / Battery Storage
|
200 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 200 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4305 |
MISO J4305 - NORTHERN STATES POWER COMPANY Substation (Solar / Battery Storage)
NORTHERN STATES POWER COMPANY $XEL
Regional, TX | Filed 2026-09-02 | Target COD 2031-06-01
|
NORTHERN STATES POWER COMPANY Substation
345 kV | Solar / Battery Storage
|
200 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 200 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4308 |
MISO J4308 - CLECO POWER LLC CLEC Substation (Solar / Battery Storage)
CLECO POWER LLC CLEC
Regional, TX | Filed 2026-09-09 | Target COD 2030-05-31
|
CLECO POWER LLC CLEC Substation
345 kV | Solar / Battery Storage
|
185 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 185 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4379 |
MISO J4379 - SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SO (Solar / Battery Storage)
SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH
Regional, TX | Filed 2026-09-11 | Target COD 2031-06-30
|
SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH Substation
345 kV | Solar / Battery Storage
|
180 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 180 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4349 |
MISO J4349 - MISO Transmission Owner Substation (Solar / Battery Storage)
MISO Transmission Owner
Regional, TX | Filed 2026-09-09 | Target COD 2031-06-30
|
MISO Transmission Owner Substation
345 kV | Solar / Battery Storage
|
178 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 178 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4390 |
MISO J4390 - ENTERGY TEXAS, INC. ETTO Substation (Solar / Battery Storage)
ENTERGY TEXAS, INC. ETTO $ETR
Regional, TX | Filed 2026-09-11 | Target COD 2031-01-01
|
ENTERGY TEXAS, INC. ETTO Substation
345 kV | Solar / Battery Storage
|
175 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 175 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4386 |
MISO J4386 - ENTERGY TEXAS, INC. ETTO Substation (Solar / Battery Storage)
ENTERGY TEXAS, INC. ETTO $ETR
Regional, TX | Filed 2026-09-10 | Target COD 2031-01-01
|
ENTERGY TEXAS, INC. ETTO Substation
345 kV | Solar / Battery Storage
|
175 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 175 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4330 |
MISO J4330 - AMERICAN TRANSMISSION COMPANY Substation (Solar / Battery Storage)
AMERICAN TRANSMISSION COMPANY
Regional, TX | Filed 2026-09-03 | Target COD 2028-01-01
|
AMERICAN TRANSMISSION COMPANY Substation
345 kV | Solar / Battery Storage
|
163 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 163 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-226-000 (ER27-226-000) |
§ 205(d) Rate Filing: Amended GIA, Service Agreement No. 7533; AF2-018 to be effective 12/21/2026.
PJM Interconnection, L.L.C
FERC Accession 20261021-5072, PJM | Filed 2026-10-26 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-226-000
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM 2863 (ER27-228-000) |
§ 205(d) Rate Filing: Amendment to ISA SA No. 2863; Queue No. U3-029/U3-030 to be effective 12/21/2026.
PJM Interconnection, L.L.C
FERC Accession 20261021-5077, PJM | Filed 2026-10-26 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-228-000
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM 7619 (ER27-229-000) |
§ 205(d) Rate Filing: Amendment to GIA SA No. 7619; Project Identifier AG1-414 to be effective 12/21/2026.
PJM Interconnection, L.L.C
FERC Accession 20261021-5087, PJM | Filed 2026-10-26 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-229-000
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO ER27-232-000 (SA 4891 Entergy Texas GIA S1156/S1157) |
§ 205(d) Rate Filing: 2026-10-21_SA 4891 Entergy Texas-Entergy Texas GIA (S1156 S1157) to be effective 10/16/2026.
Entergy Texas / MISO () $ETR
FERC Accession 20261021-5112, TX | Filed 2026-10-26 | Target COD 2027-06-01
|
Entergy Texas 345kV Transmission System (S1156 / S1157 POI)
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM 7471 (ER27-218-000) |
Tariff Amendment: Notice of Cancellation of GIA, SA No. 7471; Project ID Nos. AG1-259/AG1-260 to be effective 8/25/2026.
PJM Interconnection, L.L.C
FERC Accession 20261020-5120, PJM | Filed 2026-10-26 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-218-000
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM 7302 (ER26-3745-001) |
Tariff Amendment: Amendment of Amended GIA, SA No. 7302; AF1-272 in Docket No. ER26-3745-000 to be effective 12/16/2026.
PJM Interconnection, L.L.C
FERC Accession 20261016-5170, PJM | Filed 2026-10-22 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER26-3745-001
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO ER27-207-000 (ER27-207-000) |
§ 205(d) Rate Filing: 2026-10-19_SA 4886 ITC Midwest-Interstate Power & Light GIA (S1113) to be effective 10/9/2026.
Midcontinent Independent System Operator, Inc
FERC Accession 20261019-5060, MN | Filed 2026-10-22 | Target COD 2027-06-01
|
Midcontinent Independent System Operator, Inc - ER27-207-000
345 kV | Natural Gas / Dispatchable
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-210-000 (ER27-210-000) |
§ 205(d) Rate Filing: Amended ISA, Service Agreement No. 4242; Z1-092_AD1-142 to be effective 12/19/2026.
PJM Interconnection, L.L.C
FERC Accession 20261019-5119, PJM | Filed 2026-10-22 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-210-000
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM AE2-092 (ER27-172-000) |
§ 205(d) Rate Filing: Amendment to ISA, Service Agreement No. 7041; Queue No. AE2-092 to be effective 12/16/2026.
PJM Interconnection, L.L.C
FERC Accession 20261016-5014, PJM | Filed 2026-10-21 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-172-000
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO ER27-174-000 (ER27-174-000) |
§ 205(d) Rate Filing: 2026-10-16_SA 4885 Entergy Arkansas-Forgeview Surplus GIA (S1100) to be effective 10/9/2026.
Midcontinent Independent System Operator, Inc $ETR
FERC Accession 20261016-5030, MN | Filed 2026-10-21 | Target COD 2027-06-01
|
Midcontinent Independent System Operator, Inc - ER27-174-000
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO ER27-175-000 (ER27-175-000) |
§ 205(d) Rate Filing: 2026-10-16_SA 4884 Entergy-Arkansas-Flat Fork Energy GIA (S1101) to be effective 10/9/2026.
Midcontinent Independent System Operator, Inc $ETR
FERC Accession 20261016-5036, MN | Filed 2026-10-21 | Target COD 2027-06-01
|
Midcontinent Independent System Operator, Inc - ER27-175-000
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-176-000 (ER27-176-000) |
§ 205(d) Rate Filing: Amended GIA, Service Agreement No. 7630; AD2-067/AG1-024/AG1-034 to be effective 12/16/2026.
PJM Interconnection, L.L.C
FERC Accession 20261016-5045, PJM | Filed 2026-10-21 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-176-000
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| CAISO ER27-177-000 (ER27-177-000) |
Tariff Amendment: Termination of GIA & DSA, EF Oxnard Generation (WDT1673/SA Nos. 1102-1103) to be effective 10/17/2026.
Southern California Edison Company $EIX
FERC Accession 20261016-5046, CA | Filed 2026-10-21 | Target COD 2027-06-01
|
Southern California Edison Company - ER27-177-000
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM 4323 (ER27-178-000) |
§ 205(d) Rate Filing: Amendment to ISA, SA No. 4323; Queue Position No. AA1-067 to be effective 12/16/2026.
PJM Interconnection, L.L.C
FERC Accession 20261016-5051, PJM | Filed 2026-10-21 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-178-000
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO ER27-138-000 (ER27-138-000) |
§ 205(d) Rate Filing: 2026-10-14_SA 4880 METC-Bell Solar GIA (R5063) to be effective 10/5/2026.
Midcontinent Independent System Operator, Inc
FERC Accession 20261014-5100, MN | Filed 2026-10-19 | Target COD 2027-06-01
|
Midcontinent Independent System Operator, Inc - ER27-138-000
345 kV | Solar PV + Storage
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| SPP ER27-139-000 (ER27-139-000) |
§ 205(d) Rate Filing: 5014 Public Service Company of Oklahoma GIA to be effective 9/23/2026.
Southwest Power Pool, Inc
FERC Accession 20261014-5102, OK | Filed 2026-10-19 | Target COD 2027-06-01
|
Southwest Power Pool, Inc - ER27-139-000
345 kV | Natural Gas / Dispatchable
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| SPP ER27-140-000 (ER27-140-000) |
§ 205(d) Rate Filing: 5015 Public Service Company of Oklahoma GIA to be effective 9/23/2026.
Southwest Power Pool, Inc
FERC Accession 20261014-5107, OK | Filed 2026-10-19 | Target COD 2027-06-01
|
Southwest Power Pool, Inc - ER27-140-000
345 kV | Natural Gas / Dispatchable
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| SPP ER27-141-000 (ER27-141-000) |
§ 205(d) Rate Filing: 5016 Public Service Company of Oklahoma GIA to be effective 9/23/2026.
Southwest Power Pool, Inc
FERC Accession 20261014-5110, OK | Filed 2026-10-19 | Target COD 2027-06-01
|
Southwest Power Pool, Inc - ER27-141-000
345 kV | Natural Gas / Dispatchable
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM 7521 (ER27-122-000) |
205(d) Rate Filing: Amendment to GIA SA No. 7521; Project Identifier No. AG1-349 to be effective 12/13/2026.
PJM Interconnection, L.L.C
FERC Accession 20261013-5230, PJM | Filed 2026-10-16 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-122-000
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO ER27-123-000 (ER27-123-000) |
205(d) Rate Filing: 2026-10-13_SA 4883 Entergy LA-Entergy LA GIA (J3815) to be effective 9/30/2026.
Midcontinent Independent System Operator, Inc $ETR
FERC Accession 20261013-5275, MN | Filed 2026-10-16 | Target COD 2027-06-01
|
Midcontinent Independent System Operator, Inc - ER27-123-000
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO ER26-3730-001 (ER26-3730-001) |
Tariff Amendment: 2026-10-09_SA 4855 ITC Midwest-Hawkeye Energy Sub GIA (S1107) to be effective 9/1/2026.
Midcontinent Independent System Operator, Inc
FERC Accession 20261009-5074, MN | Filed 2026-10-15 | Target COD 2027-06-01
|
Midcontinent Independent System Operator, Inc - ER26-3730-001
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO ER27-93-000 (ER27-93-000) |
205(d) Rate Filing: 2026-10-09_SA 4879 NSP-NSP GIA (S1072) to be effective 10/1/2026.
Midcontinent Independent System Operator, Inc
FERC Accession 20261009-5053, MN | Filed 2026-10-15 | Target COD 2027-06-01
|
Midcontinent Independent System Operator, Inc - ER27-93-000
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| CAISO 1437 (ER27-96-000) |
205(d) Rate Filing: Amended GIA, Ontario 1 Powerhouse (WDT11019/SA No. 1437) to be effective 10/10/2026.
Southern California Edison Company $EIX
FERC Accession 20261009-5069, CA | Filed 2026-10-15 | Target COD 2027-06-01
|
Southern California Edison Company - ER27-96-000
345 kV | Natural Gas / Dispatchable
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| CAISO 1436 (ER27-98-000) |
205(d) Rate Filing: Amended GIA, Mill Creek 1 Powerhouse (WDT11017/SA No. 1436) to be effective 10/10/2026.
Southern California Edison Company $EIX
FERC Accession 20261009-5072, CA | Filed 2026-10-15 | Target COD 2027-06-01
|
Southern California Edison Company - ER27-98-000
345 kV | Natural Gas / Dispatchable
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| CAISO 1440 (ER27-100-000) |
205(d) Rate Filing: Amended GIA, Mill Creek 3 Powerhouse (WDT11018/SA No. 1440) to be effective 10/10/2026.
Southern California Edison Company $EIX
FERC Accession 20261009-5076, CA | Filed 2026-10-15 | Target COD 2027-06-01
|
Southern California Edison Company - ER27-100-000
345 kV | Natural Gas / Dispatchable
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| CAISO 1438 (ER27-101-000) |
205(d) Rate Filing: Amended GIA, Sierra Powerhouse (WDT11023/SA No. 1438) to be effective 10/10/2026.
Southern California Edison Company $EIX
FERC Accession 20261009-5078, CA | Filed 2026-10-15 | Target COD 2027-06-01
|
Southern California Edison Company - ER27-101-000
345 kV | Natural Gas / Dispatchable
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| CAISO 1439 (ER27-102-000) |
205(d) Rate Filing: Amended GIA, Ontario 2 Powerhouse (WDT11020/SA No. 1439) to be effective 10/10/2026.
Southern California Edison Company $EIX
FERC Accession 20261009-5088, CA | Filed 2026-10-15 | Target COD 2027-06-01
|
Southern California Edison Company - ER27-102-000
345 kV | Natural Gas / Dispatchable
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM 6973 (ER27-109-000) |
205(d) Rate Filing: Amendment to ISA, SA No. 6973, and ICSA, SA No. 6126; Queue No. AD2-134 to be effective 12/9/2026.
PJM Interconnection, L.L.C
FERC Accession 20261009-5156, PJM | Filed 2026-10-15 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-109-000
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-77-000 (ER27-77-000) |
205(d) Rate Filing: Amendment to ISA, Service Agreement No. 6237; AE2-290 to be effective 12/8/2026.
PJM Interconnection, L.L.C
FERC Accession 20261008-5002, PJM | Filed 2026-10-14 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-77-000
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| NYISO ER27-78-000 (ER27-78-000) |
Tariff Amendment: Notice of Cancellation: SGIA Millers Grove Solar SA2868 to be effective 12/8/2026.
New York Independent System Operator, Inc
FERC Accession 20261008-5034, NY | Filed 2026-10-14 | Target COD 2027-06-01
|
New York Independent System Operator, Inc - ER27-78-000
345 kV | Solar PV + Storage
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM 6211 (ER27-71-000) |
Tariff Amendment: Notice of Cancellation of IISA, SA No. 6211; AE1-155 to be effective 3/25/2022.
PJM Interconnection, L.L.C
FERC Accession 20261007-5122, PJM | Filed 2026-10-13 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-71-000
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO ER27-73-000 (ER27-73-000) |
205(d) Rate Filing: 2026-10-07_SA 4875 Entergy MS-Wildwood Energy GIA (S1116) to be effective 10/1/2026.
Midcontinent Independent System Operator, Inc $ETR
FERC Accession 20261007-5132, MN | Filed 2026-10-13 | Target COD 2027-06-01
|
Midcontinent Independent System Operator, Inc - ER27-73-000
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM 6009 (ER27-54-000) |
§ 205(d) Rate Filing: Amendment to ISA, SA No. 6009; Queue No. AF2-168 to be effective 12/6/2026.
PJM Interconnection, L.L.C
FERC Accession 20261006-5117, PJM | Filed 2026-10-09 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-54-000
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| CAISO ER27-55-000 (ER27-55-000) |
§ 205(d) Rate Filing: GIA, Chambers Storage, WDT1766, SA 1463 to be effective 10/7/2026.
Southern California Edison Company $EIX
FERC Accession 20261006-5121, CA | Filed 2026-10-09 | Target COD 2027-06-01
|
Southern California Edison Company - ER27-55-000
345 kV | Battery Energy Storage (BESS)
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (Battery Energy Storage (BESS)) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM 6816 (ER27-56-000) |
Tariff Amendment: Notice of Cancellation of ISA, SA No. 6816; Queue No. AF1-271A to be effective 10/12/2026.
PJM Interconnection, L.L.C
FERC Accession 20261006-5136, PJM | Filed 2026-10-09 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-56-000
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM Identifier (ER27-38-000) |
§ 205(d) Rate Filing: Amendment to GIA, Service Agreement No. 7256; Project Identifier No. AE2-139 to be effective 12/5/2026.
PJM Interconnection, L.L.C
FERC Accession 20261005-5047, PJM | Filed 2026-10-08 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-38-000
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM 6157 (ER27-39-000) |
§ 205(d) Rate Filing: Amendment to ISA SA No. 6157 & ICSA SA No. 6158; Queue No. AB2-036 to be effective 12/5/2026.
PJM Interconnection, L.L.C
FERC Accession 20261005-5054, PJM | Filed 2026-10-08 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-39-000
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-40-000 (ER27-40-000) |
§ 205(d) Rate Filing: GIA SA # 8063 Project ID # AF2-044/AH1-706; ISA Cancel SA # 4415 Queue # AF2-044 to be effective 9/3/2026.
PJM Interconnection, L.L.C
FERC Accession 20261005-5057, PJM | Filed 2026-10-08 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-40-000
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM 7528 (ER27-21-000) |
§ 205(d) Rate Filing: Amendment to GIA SA No. 7528; Project Identifier No. AG1-066 to be effective 12/1/2026.
PJM Interconnection, L.L.C
FERC Accession 20261001-5368, PJM | Filed 2026-10-08 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-21-000
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM 7344 (ER27-22-000) |
§ 205(d) Rate Filing: Amendment to GIA, SA No. 7344; Project Identifier No. AF2-415 to be effective 12/2/2026.
PJM Interconnection, L.L.C
FERC Accession 20261002-5039, PJM | Filed 2026-10-08 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-22-000
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM AC2-103 (ER27-24-000) |
§ 205(d) Rate Filing: Amendment to ISA, Service Agreement No. 5823; Queue No. AC2-103 to be effective 12/2/2026.
PJM Interconnection, L.L.C
FERC Accession 20261002-5053, PJM | Filed 2026-10-08 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-24-000
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO ER27-2-000 (ER27-2-000) |
§ 205(d) Rate Filing: 2026-10-01_SA 4873 Entergy Arkansas-New Madrid Energy GIA (S1117) to be effective 9/24/2026.
Midcontinent Independent System Operator, Inc $ETR
FERC Accession 20261001-5026, MN | Filed 2026-10-06 | Target COD 2027-06-01
|
Midcontinent Independent System Operator, Inc - ER27-2-000
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO ER27-5-000 (ER27-5-000) |
§ 205(d) Rate Filing: 2026-10-01_SA 4869 METC-DTE GIA (S1130) to be effective 9/23/2026.
Midcontinent Independent System Operator, Inc
FERC Accession 20261001-5091, MN | Filed 2026-10-06 | Target COD 2027-06-01
|
Midcontinent Independent System Operator, Inc - ER27-5-000
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM AE1-209 (ER27-10-000) |
§ 205(d) Rate Filing: Amendment to ISA, Service Agreement No. 7020; Queue No. AE1-209/AE1-210 to be effective 12/1/2026.
PJM Interconnection, L.L.C
FERC Accession 20261001-5178, PJM | Filed 2026-10-06 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-10-000
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM Z1-052 (ER27-17-000) |
§ 205(d) Rate Filing: GIA SA 8058 Project ID Nos. Z1-052/AH1-744; ISA Cancel SA 3830 Queue No. Z1-052 to be effective 9/1/2026.
PJM Interconnection, L.L.C
FERC Accession 20261001-5246, PJM | Filed 2026-10-06 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-17-000
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM 6849 (ER27-19-000) |
Tariff Amendment: Notice of Cancellation of ISA, SA No. 6849; Queue No. AE1-170 to be effective 10/30/2026.
PJM Interconnection, L.L.C
FERC Accession 20261001-5319, PJM | Filed 2026-10-06 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-19-000
345 kV | High-Voltage Grid Interconnection
|
160 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 160 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4353 |
MISO J4353 - MISO Transmission Owner Substation (Solar / Battery Storage)
MISO Transmission Owner
Regional, TX | Filed 2026-09-11 | Target COD 2030-05-01
|
MISO Transmission Owner Substation
345 kV | Solar / Battery Storage
|
150 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 150 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4393 |
MISO J4393 - NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS Substation (Solar / Battery Storage)
NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS
Regional, TX | Filed 2026-09-10 | Target COD 2030-06-30
|
NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS Substation
345 kV | Solar / Battery Storage
|
150 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 150 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4367 |
MISO J4367 - MISO Transmission Owner Substation (Solar / Battery Storage)
MISO Transmission Owner
Regional, TX | Filed 2026-09-10 | Target COD 2031-05-30
|
MISO Transmission Owner Substation
345 kV | Solar / Battery Storage
|
150 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 150 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4398 |
MISO J4398 - NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS Substation (Solar / Battery Storage)
NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS
Regional, TX | Filed 2026-09-09 | Target COD 2031-01-14
|
NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS Substation
345 kV | Solar / Battery Storage
|
150 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 150 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4318 |
MISO J4318 - AMERICAN TRANSMISSION COMPANY Substation (Solar / Battery Storage)
AMERICAN TRANSMISSION COMPANY
Regional, TX | Filed 2026-09-08 | Target COD 2029-06-01
|
AMERICAN TRANSMISSION COMPANY Substation
345 kV | Solar / Battery Storage
|
150 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 150 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4341 |
MISO J4341 - AMERICAN TRANSMISSION COMPANY Substation (Solar / Battery Storage)
AMERICAN TRANSMISSION COMPANY
Regional, TX | Filed 2026-09-08 | Target COD 2029-06-01
|
AMERICAN TRANSMISSION COMPANY Substation
345 kV | Solar / Battery Storage
|
150 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 150 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO J4359 |
MISO J4359 - DUKE ENERGY INDIANA, LLC CIN Substation (Solar / Battery Storage)
DUKE ENERGY INDIANA, LLC CIN $DUK
Regional, TX | Filed 2026-09-03 | Target COD 2031-05-07
|
DUKE ENERGY INDIANA, LLC CIN Substation
345 kV | Solar / Battery Storage
|
150 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 150 MW (Solar / Battery Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER26-3532-001 (ER26-3532-001) |
Tariff Amendment: Resp. to Deficiency Letter and Request for Expedited Action to be effective 10/17/2026.
Zeta Solar, LLC
FERC Accession 20261021-5064, PA | Filed 2026-10-26 | Target COD 2027-06-01
|
Zeta Solar, LLC - ER26-3532-001
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-223-000 (ER27-223-000) |
§ 205(d) Rate Filing: Demand Response Program Updates to be effective 12/20/2026.
Tri-State Generation and Transmission Association, Inc
FERC Accession 20261020-5175, PA | Filed 2026-10-26 | Target COD 2027-06-01
|
Tri-State Generation and Transmission Association, Inc - ER27-223-000
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| CAISO ER27-227-000 (ER27-227-000) |
§ 205(d) Rate Filing: Service Agreement No. 453, E&P Agreement w/Papermill Wind, LLC to be effective 9/26/2026.
Arizona Public Service Company $PNW
FERC Accession 20261021-5073, AZ | Filed 2026-10-26 | Target COD 2027-06-01
|
Arizona Public Service Company - ER27-227-000
345 kV | Wind Generation
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Wind Generation) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| CAISO ER27-230-000 (ER27-230-000) |
Compliance filing: 2026-10-21 Second Petition for Limited Waiver- EDAM Settlement Dispute Deadlines to be effective N/A.
California Independent System Operator Corporation
FERC Accession 20261021-5090, CA | Filed 2026-10-26 | Target COD 2027-06-01
|
California Independent System Operator Corporation - ER27-230-000
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO ER27-231-000 (ER27-231-000) |
§ 205(d) Rate Filing: Northern States Power Company, a Minnesota corporation submits tariff filing per 35.13(a)(2)(iii: 2026-10-21_SA 4895 NSP-GRE T-TIA (Big Oa
Midcontinent Independent System Operator, Inc., Northern States Power Company, a Minnesota corporation $XEL
FERC Accession 20261021-5099, MN | Filed 2026-10-26 | Target COD 2027-06-01
|
Midcontinent Independent System Operator, Inc., Northern States Power Company, a - ER27-231-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-217-000 (ER27-217-000) |
Request for Limited and Prospective Waiver, et al. of Acceleration Solar, LLC.
Acceleration Solar, LLC
FERC Accession 20261020-5073, PA | Filed 2026-10-26 | Target COD 2027-06-01
|
Acceleration Solar, LLC - ER27-217-000
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO ER27-219-000 (ER27-219-000) |
§ 205(d) Rate Filing: Ameren Illinois Company submits tariff filing per 35.13(a)(2)(iii: 2026-10-20_SA 3028 Ameren IL-Prairie Power Proj #49 Wee-Ma-Tuk & Canton
Midcontinent Independent System Operator, Inc., Ameren Illinois Company $AEE
FERC Accession 20261020-5132, MN | Filed 2026-10-26 | Target COD 2027-06-01
|
Midcontinent Independent System Operator, Inc., Ameren Illinois Company - ER27-219-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM 3773 (ER27-221-000) |
§ 205(d) Rate Filing: APCo (AEP) submits an Amended IA-SA No. 3773 to be effective 1/1/2027.
Appalachian Power Company $AEP
FERC Accession 20261020-5149, PA | Filed 2026-10-26 | Target COD 2027-06-01
|
Appalachian Power Company - ER27-221-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM AC26-99-000 (AC26-99-000) |
Indiana Michigan Power Company submits amendment to journal entries relating to the Oregon Clean Energy, LLC acquisition, authorized in Docket EC25-84 and trans
Indiana Michigan Power Company $AEP
FERC Accession 20261016-5177, PA | Filed 2026-10-22 | Target COD 2027-06-01
|
Indiana Michigan Power Company - AC26-99-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM EC26-153-000 (EC26-153-000) |
Supplement to 08/17/2026 Application for Authorization Under Section 203 of the Federal Power Act of AEP Generation Resources Inc., et al.
AEP Generation Resources Inc., Longview Power, LLC $AEP
FERC Accession 20261015-5197, PA | Filed 2026-10-22 | Target COD 2027-06-01
|
AEP Generation Resources Inc., Longview Power, LLC - EC26-153-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM EC27-5-000 (EC27-5-000) |
Joint Application for Authorization Under Section 203 of the Federal Power Act of Hashknife Energy Center LLC, et al.
Hashknife Energy Center II LLC, Hashknife Energy Center LLC
FERC Accession 20261016-5189, PA | Filed 2026-10-22 | Target COD 2027-06-01
|
Hashknife Energy Center II LLC, Hashknife Energy Center LLC - EC27-5-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM EC27-6-000 (EC27-6-000) |
Joint Application for Authorization Under Section 203 of the Federal Power Act of EDPR CA Solar Park VI LLC, et al.
EDPR CA Solar Park VI LLC, Sonrisa BESS LLC, ACI Sequoia Member, LLC
FERC Accession 20261019-5161, PA | Filed 2026-10-22 | Target COD 2027-06-01
|
EDPR CA Solar Park VI LLC, Sonrisa BESS LLC, ACI Sequoia Member, LLC - EC27-6-000
345 kV | Battery Energy Storage (BESS)
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Battery Energy Storage (BESS)) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER22-279-001 (ER22-279-001) |
Refund Report: Parkway Generation Keys Energy Center LLC submits tariff filing per 35.19a(b): Refund Report to be effective N/A.
PSEG Keys Energy Center LLC
FERC Accession 20261019-5123, PA | Filed 2026-10-22 | Target COD 2027-06-01
|
PSEG Keys Energy Center LLC - ER22-279-001
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER22-285-001 (ER22-285-001) |
Refund Report: Parkway Generation Sewaren Urban Renewal Entity LLC submits tariff filing per 35.19a(b): Refund Report to be effective N/A.
PSEG Fossil Sewaren Urban Renewal LLC
FERC Accession 20261019-5125, PA | Filed 2026-10-22 | Target COD 2027-06-01
|
PSEG Fossil Sewaren Urban Renewal LLC - ER22-285-001
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER22-294-001 (ER22-294-001) |
Refund Report: Parkway Generation Operating LLC submits tariff filing per 35.19a(b): Refund Report to be effective N/A.
PSEG Fossil LLC
FERC Accession 20261019-5124, PA | Filed 2026-10-22 | Target COD 2027-06-01
|
PSEG Fossil LLC - ER22-294-001
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO ER26-3576-000 (ER26-3576-000) |
Second Supplement to August 21, 2026 IFA of Wolverine Power Supply Cooperative, Inc.
Wolverine Power Supply Cooperative, Inc., Midcontinent Independent System Operator, Inc
FERC Accession 20261015-5067, MN | Filed 2026-10-22 | Target COD 2027-06-01
|
Wolverine Power Supply Cooperative, Inc., Midcontinent Independent System Operat - ER26-3576-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-200-000 (ER27-200-000) |
§ 205(d) Rate Filing: Updated D&A Rates and DA's for Wholesale Formula Rates-LCEC to be effective 1/1/2027.
Florida Power & Light Company $NEE
FERC Accession 20261016-5150, PA | Filed 2026-10-22 | Target COD 2027-06-01
|
Florida Power & Light Company - ER27-200-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-202-000 (ER27-202-000) |
§ 205(d) Rate Filing: Updated D&A Rates and DA's for Wholesale Formula Rates-FKEC to be effective 1/1/2027.
Florida Power & Light Company $NEE
FERC Accession 20261016-5153, PA | Filed 2026-10-22 | Target COD 2027-06-01
|
Florida Power & Light Company - ER27-202-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-203-000 (ER27-203-000) |
§ 205(d) Rate Filing: Updated D&A Rates and DA's for Wholesale Formula Rates-NWFL to be effective 1/1/2027.
Florida Power & Light Company $NEE
FERC Accession 20261016-5154, PA | Filed 2026-10-22 | Target COD 2027-06-01
|
Florida Power & Light Company - ER27-203-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-208-000 (ER27-208-000) |
§ 205(d) Rate Filing: Filing of Third Amendment to Shared Facilities Agreement to be effective 10/20/2026.
Escalante Solar I, LLC
FERC Accession 20261019-5067, PA | Filed 2026-10-22 | Target COD 2027-06-01
|
Escalante Solar I, LLC - ER27-208-000
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM 3774 (ER27-209-000) |
Tariff Amendment: Notice of Cancellation-SA No. 3774 to be effective 12/31/2026.
Appalachian Power Company $AEP
FERC Accession 20261019-5090, PA | Filed 2026-10-22 | Target COD 2027-06-01
|
Appalachian Power Company - ER27-209-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-212-000 (ER27-212-000) |
§ 205(d) Rate Filing: Certificate of Concurrence to be effective 10/20/2026.
Escalante Solar II, LLC
FERC Accession 20261019-5142, PA | Filed 2026-10-22 | Target COD 2027-06-01
|
Escalante Solar II, LLC - ER27-212-000
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-213-000 (ER27-213-000) |
§ 205(d) Rate Filing: Certificate of Concurrence to be effective 10/20/2026.
Escalante Solar III, LLC
FERC Accession 20261019-5144, PA | Filed 2026-10-22 | Target COD 2027-06-01
|
Escalante Solar III, LLC - ER27-213-000
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| ISO-NE ER27-214-000 (ER27-214-000) |
Petition of the Indicated New England Transmission Owners for Limited Prospective Waiver and Request for Expedited Action of Central Maine Power Company, et al.
Central Maine Power Company, The Connecticut Light and Power Company, Maine Electric Power Company, Inc., The Narraganse
FERC Accession 20261016-5191, MA | Filed 2026-10-22 | Target COD 2027-06-01
|
Central Maine Power Company, The Connecticut Light and Power Company, Maine Elec - ER27-214-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-215-000 (ER27-215-000) |
§ 205(d) Rate Filing: Certificate of Concurrence to the Interconnection Agreement with VEPCO to be effective 1/1/2027.
Duke Energy Carolinas, LLC $DUK
FERC Accession 20261019-5153, PA | Filed 2026-10-22 | Target COD 2027-06-01
|
Duke Energy Carolinas, LLC - ER27-215-000
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM EC26-131-000 (EC26-131-000) |
NextEra Energy, Inc, et al. submit response to FERC's 09/23/2026 deficiency letter re the Joint Application for Authorization under Section 203 of the Federal P
NextEra Energy, Inc., Dominion Energy, Inc $NEE
FERC Accession 20261015-5185, PA | Filed 2026-10-21 | Target COD 2027-06-01
|
NextEra Energy, Inc., Dominion Energy, Inc - EC26-131-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER22-2303-003 (ER22-2303-003) |
Compliance filing: Second Amended Order No. 881 Compliance Filing to be effective 4/1/2027.
Black Hills Power, Inc
FERC Accession 20261016-5070, PA | Filed 2026-10-21 | Target COD 2027-06-01
|
Black Hills Power, Inc - ER22-2303-003
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER22-2307-003 (ER22-2307-003) |
Compliance filing: Second Amended Order No. 881 Compliance Filing to be effective 4/1/2027.
Cheyenne Light, Fuel and Power Company
FERC Accession 20261016-5078, PA | Filed 2026-10-21 | Target COD 2027-06-01
|
Cheyenne Light, Fuel and Power Company - ER22-2307-003
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER26-2337-002 (ER26-2337-002) |
Tariff Amendment: Response to Second Information Request to be effective 5/2/2026.
Bee Hollow Solar, LLC
FERC Accession 20261016-5049, PA | Filed 2026-10-21 | Target COD 2027-06-01
|
Bee Hollow Solar, LLC - ER26-2337-002
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| ISO-NE ER27-166-000 (ER27-166-000) |
ISO New England Inc. submits Capital Budget Quarterly Report for the Third Quarter of 2026.
ISO New England Inc
FERC Accession 20261015-5141, MA | Filed 2026-10-21 | Target COD 2027-06-01
|
ISO New England Inc - ER27-166-000
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-167-000 (ER27-167-000) |
§ 205(d) Rate Filing: Proposal for Form Reliability Must Run Service Agreement to be effective 12/15/2026.
PJM Interconnection, L.L.C
FERC Accession 20261015-5143, PJM | Filed 2026-10-21 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-167-000
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| SPP ER27-171-000 (ER27-171-000) |
§ 205(d) Rate Filing: OATT Revisions to Reflect SPP Markets Plus Participation to be effective 3/31/2027.
Tucson Electric Power Company
FERC Accession 20261015-5169, OK | Filed 2026-10-21 | Target COD 2027-06-01
|
Tucson Electric Power Company - ER27-171-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-179-000 (ER27-179-000) |
Initial Rate Filing: Application for Market-Based Rates to be effective 12/16/2026.
Crimson Orchard Solar LLC
FERC Accession 20261016-5065, PA | Filed 2026-10-21 | Target COD 2027-06-01
|
Crimson Orchard Solar LLC - ER27-179-000
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| ISO-NE ER27-181-000 (ER27-181-000) |
§ 205(d) Rate Filing: Green Mountain Power Corporation submits tariff filing per 35.13(a)(2)(iii: GMP; Request for Approval of Updated Depreciation Rates to be
ISO New England Inc., Green Mountain Power Corporation
FERC Accession 20261016-5082, MA | Filed 2026-10-21 | Target COD 2027-06-01
|
ISO New England Inc., Green Mountain Power Corporation - ER27-181-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-183-000 (ER27-183-000) |
§ 205(d) Rate Filing: Revised Market-Based Rate Tariff to be effective 10/17/2026.
Apple River Solar, LLC
FERC Accession 20261016-5086, PA | Filed 2026-10-21 | Target COD 2027-06-01
|
Apple River Solar, LLC - ER27-183-000
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-184-000 (ER27-184-000) |
§ 205(d) Rate Filing: Revised Market-Based Rate Tariff to be effective 10/17/2026.
Crocker Wind Farm, LLC
FERC Accession 20261016-5089, PA | Filed 2026-10-21 | Target COD 2027-06-01
|
Crocker Wind Farm, LLC - ER27-184-000
345 kV | Wind Generation
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Wind Generation) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-185-000 (ER27-185-000) |
§ 205(d) Rate Filing: Revised Market-Based Rate Tariff to be effective 10/17/2026.
Dodson Creek Solar, LLC
FERC Accession 20261016-5090, PA | Filed 2026-10-21 | Target COD 2027-06-01
|
Dodson Creek Solar, LLC - ER27-185-000
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-186-000 (ER27-186-000) |
§ 205(d) Rate Filing: Revised Market-Based Rate Tariff to be effective 10/17/2026.
Fayette Solar, LLC
FERC Accession 20261016-5093, PA | Filed 2026-10-21 | Target COD 2027-06-01
|
Fayette Solar, LLC - ER27-186-000
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-187-000 (ER27-187-000) |
§ 205(d) Rate Filing: Revised Market-Based Rate Tariff to be effective 10/17/2026.
Fillmore County Solar Project, LLC
FERC Accession 20261016-5094, PA | Filed 2026-10-21 | Target COD 2027-06-01
|
Fillmore County Solar Project, LLC - ER27-187-000
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-188-000 (ER27-188-000) |
§ 205(d) Rate Filing: Revised Market-Based Rate Tariff to be effective 10/17/2026.
Geronimo Power Marketing, LLC
FERC Accession 20261016-5096, PA | Filed 2026-10-21 | Target COD 2027-06-01
|
Geronimo Power Marketing, LLC - ER27-188-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-189-000 (ER27-189-000) |
§ 205(d) Rate Filing: Revised Market-Based Rate Tariff to be effective 10/17/2026.
Jackson County Solar, LLC
FERC Accession 20261016-5097, PA | Filed 2026-10-21 | Target COD 2027-06-01
|
Jackson County Solar, LLC - ER27-189-000
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-190-000 (ER27-190-000) |
§ 205(d) Rate Filing: Revised Market-Based Rate Tariff to be effective 10/17/2026.
Louise Solar Project, LLC
FERC Accession 20261016-5099, PA | Filed 2026-10-21 | Target COD 2027-06-01
|
Louise Solar Project, LLC - ER27-190-000
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-191-000 (ER27-191-000) |
§ 205(d) Rate Filing: Revised Market-Based Rate Tariff to be effective 10/17/2026.
Prairie Wolf Solar, LLC
FERC Accession 20261016-5100, PA | Filed 2026-10-21 | Target COD 2027-06-01
|
Prairie Wolf Solar, LLC - ER27-191-000
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-192-000 (ER27-192-000) |
§ 205(d) Rate Filing: Revised Market-Based Rate Tariff to be effective 10/17/2026.
Ross County Solar, LLC
FERC Accession 20261016-5101, PA | Filed 2026-10-21 | Target COD 2027-06-01
|
Ross County Solar, LLC - ER27-192-000
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-193-000 (ER27-193-000) |
§ 205(d) Rate Filing: Revised Market-Based Rate Tariff to be effective 10/17/2026.
Sycamore Creek Solar, LLC
FERC Accession 20261016-5104, PA | Filed 2026-10-21 | Target COD 2027-06-01
|
Sycamore Creek Solar, LLC - ER27-193-000
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-194-000 (ER27-194-000) |
§ 205(d) Rate Filing: Revised Market-Based Rate Tariff to be effective 10/17/2026.
Unbridled Solar, LLC
FERC Accession 20261016-5105, PA | Filed 2026-10-21 | Target COD 2027-06-01
|
Unbridled Solar, LLC - ER27-194-000
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-195-000 (ER27-195-000) |
§ 205(d) Rate Filing: Revised Market-Based Rate Tariff to be effective 10/17/2026.
Wild Springs Solar, LLC
FERC Accession 20261016-5108, PA | Filed 2026-10-21 | Target COD 2027-06-01
|
Wild Springs Solar, LLC - ER27-195-000
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-196-000 (ER27-196-000) |
§ 205(d) Rate Filing: Revised Market-Based Rate Tariff to be effective 10/17/2026.
Yellowbud Solar, LLC
FERC Accession 20261016-5109, PA | Filed 2026-10-21 | Target COD 2027-06-01
|
Yellowbud Solar, LLC - ER27-196-000
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-197-000 (ER27-197-000) |
§ 205(d) Rate Filing: Revisions to OA, Schedule 12 & RAA, Schedule 17 RE: 3Q 2026 Member Lists to be effective 10/1/2026.
PJM Interconnection, L.L.C
FERC Accession 20261016-5110, PJM | Filed 2026-10-21 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-197-000
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM 3453 (ER27-199-000) |
§ 205(d) Rate Filing: VEPCO and DEP submit Amended Interconnection Agreement, SA No. 3453 to be effective 1/1/2027.
Virginia Electric and Power Company $D
FERC Accession 20261016-5133, PA | Filed 2026-10-21 | Target COD 2027-06-01
|
Virginia Electric and Power Company - ER27-199-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM 6787 (ER27-149-000) |
Tariff Amendment: Notice of Cancellation of SA No. 6787; Queue Position No. MISO J857 to be effective 12/15/2026.
PJM Interconnection, L.L.C
FERC Accession 20261015-5020, PJM | Filed 2026-10-20 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-149-000
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM 6776 (ER27-156-000) |
Tariff Amendment: Notice of Cancellation of SA No. 6776; Queue Position No. MISO J875 to be effective 12/15/2026.
PJM Interconnection, L.L.C
FERC Accession 20261015-5049, PJM | Filed 2026-10-20 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-156-000
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| ISO-NE ER27-158-000 (ER27-158-000) |
§ 205(d) Rate Filing: 2027 Capital Budget and Rev. Tariff Sheets for Recovery of 2027 Admin. Costs to be effective 12/15/2026.
ISO New England Inc
FERC Accession 20261015-5075, MA | Filed 2026-10-20 | Target COD 2027-06-01
|
ISO New England Inc - ER27-158-000
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-159-000 (ER27-159-000) |
Initial Rate Filing: Kyan Solar, LLC-Baseline Filing to be effective 10/16/2026.
Kyan Solar, LLC
FERC Accession 20261015-5083, PA | Filed 2026-10-20 | Target COD 2027-06-01
|
Kyan Solar, LLC - ER27-159-000
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO ER27-163-000 (ER27-163-000) |
§ 205(d) Rate Filing: 2026-10-15_SA 4439 ATC-Copper Country Power I FSA (J1814 J2316) to be effective 10/5/2026.
Midcontinent Independent System Operator, Inc
FERC Accession 20261015-5100, MN | Filed 2026-10-20 | Target COD 2027-06-01
|
Midcontinent Independent System Operator, Inc - ER27-163-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| ISO-NE ER27-164-000 (ER27-164-000) |
§ 205(d) Rate Filing: Revised Tariff Sheets for Recovery of Costs for the 2027 Operation of NESCOE to be effective 1/1/2027.
ISO New England Inc
FERC Accession 20261015-5112, MA | Filed 2026-10-20 | Target COD 2027-06-01
|
ISO New England Inc - ER27-164-000
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-165-000 (ER27-165-000) |
§ 205(d) Rate Filing: LSPG CA, LLC Annual TRBA Adjustment and Projected Revenue Requirement Filing to be effective 1/1/2027.
LS Power Grid California, LLC
FERC Accession 20261015-5118, PA | Filed 2026-10-20 | Target COD 2027-06-01
|
LS Power Grid California, LLC - ER27-165-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ES27-4-000 (ES27-4-000) |
Application Under Section 204 of the Federal Power Act for Authorization to Issue Securities of Keystone Appalachian Transmission Company.
Keystone Appalachian Transmission Company
FERC Accession 20261014-5194, PA | Filed 2026-10-20 | Target COD 2027-06-01
|
Keystone Appalachian Transmission Company - ES27-4-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER10-3285-005 (ER10-3285-005) |
Supplement to 12/04/2025, Triennial Market Power Analysis for Northeast Region of UGI Utilities, Inc., et al.
UGI Energy Services, Inc., GI Utilities Inc
FERC Accession 20260116-5196, PA | Filed 2026-10-19 | Target COD 2027-06-01
|
UGI Energy Services, Inc., GI Utilities Inc - ER10-3285-005
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER26-2749-001 (ER26-2749-001) |
Report Filing: Supplemental COC SFA Substation #2 to update effective date to be effective N/A.
Atlas Solar IV, LLC
FERC Accession 20261007-5186, PA | Filed 2026-10-19 | Target COD 2027-06-01
|
Atlas Solar IV, LLC - ER26-2749-001
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER26-3285-000 (ER26-3285-000) |
Report Filing: Supplement to COC SFA Substation #2 to update effective date to be effective N/A.
Atlas Solar II, LLC
FERC Accession 20261007-5187, PA | Filed 2026-10-19 | Target COD 2027-06-01
|
Atlas Solar II, LLC - ER26-3285-000
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER26-3317-001 (ER26-3317-001) |
Tariff Amendment: Response to Information Request to be effective 7/30/2026.
Moonshot Solar, LLC
FERC Accession 20261013-5384, PA | Filed 2026-10-19 | Target COD 2027-06-01
|
Moonshot Solar, LLC - ER26-3317-001
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER26-3318-001 (ER26-3318-001) |
Tariff Amendment: Response to Information Request to be effective 7/30/2026.
Old Hayneville Solar, LLC
FERC Accession 20261013-5391, PA | Filed 2026-10-19 | Target COD 2027-06-01
|
Old Hayneville Solar, LLC - ER26-3318-001
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER26-3327-001 (ER26-3327-001) |
Tariff Amendment: Response to Information Request to be effective 7/30/2026.
Sonny Solar, LLC
FERC Accession 20261013-5434, PA | Filed 2026-10-19 | Target COD 2027-06-01
|
Sonny Solar, LLC - ER26-3327-001
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| ERCOT ER27-125-000 (ER27-125-000) |
§ 205(d) Rate Filing: AEPTX- Elk Ridge Solar Generation Interconnection Agreement to be effective 9/22/2026.
AEP Texas Inc $AEP
FERC Accession 20261013-5394, TX | Filed 2026-10-19 | Target COD 2027-06-01
|
AEP Texas Inc - ER27-125-000
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-126-000 (ER27-126-000) |
§ 205(d) Rate Filing: Study Agreement in Furtherance of Ohio's State Agreement Approach Request to be effective 9/25/2026.
PJM Interconnection, L.L.C
FERC Accession 20261013-5422, OH | Filed 2026-10-19 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-126-000
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| SPP ER27-128-000 (ER27-128-000) |
§ 205(d) Rate Filing: Non-Substantive Revisions to Attachment H of the Tariff to be effective 4/1/2026.
Southwest Power Pool, Inc
FERC Accession 20261014-5040, OK | Filed 2026-10-19 | Target COD 2027-06-01
|
Southwest Power Pool, Inc - ER27-128-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| SPP ER27-129-000 (ER27-129-000) |
§ 205(d) Rate Filing: Revisions to Markets+ Tariff to Remove Real-Time Capability to be effective 12/31/9998.
Southwest Power Pool, Inc
FERC Accession 20261014-5044, OK | Filed 2026-10-19 | Target COD 2027-06-01
|
Southwest Power Pool, Inc - ER27-129-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| SPP ER27-131-000 (ER27-131-000) |
§ 205(d) Rate Filing: Revisions to Markets+ Tariff to Properly Reflect Greenhouse Gas Pricing Comp. to be effective 12/31/9998.
Southwest Power Pool, Inc
FERC Accession 20261014-5066, OK | Filed 2026-10-19 | Target COD 2027-06-01
|
Southwest Power Pool, Inc - ER27-131-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-132-000 (ER27-132-000) |
Request for Limited and Prospective Waiver, et al. of Walker Road Solar Farm LLC.
Walker Road Solar Farm LLC
FERC Accession 20261009-5189, PA | Filed 2026-10-19 | Target COD 2027-06-01
|
Walker Road Solar Farm LLC - ER27-132-000
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-133-000 (ER27-133-000) |
Tariff Amendment: Notice of Cancellation of Service Agreement No. 867 to be effective 12/14/2026.
Tri-State Generation and Transmission Association, Inc
FERC Accession 20261014-5082, PA | Filed 2026-10-19 | Target COD 2027-06-01
|
Tri-State Generation and Transmission Association, Inc - ER27-133-000
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| ISO-NE ER27-134-000 (ER27-134-000) |
§ 205(d) Rate Filing: ISO New England Inc. submits tariff filing per 35.13(a)(2)(iii: Revisions to Provide a Financial Assurance Methodology for Opinion 594 to
ISO New England Inc., New England Power Pool Participants Committee
FERC Accession 20261014-5084, MA | Filed 2026-10-19 | Target COD 2027-06-01
|
ISO New England Inc., New England Power Pool Participants Committee - ER27-134-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| SPP ER27-136-000 (ER27-136-000) |
§ 205(d) Rate Filing: Revisions to Tariff to Update Markets+ Transmission Service Provider OASIS Queue to be effective 12/31/9998.
Southwest Power Pool, Inc
FERC Accession 20261014-5092, OK | Filed 2026-10-19 | Target COD 2027-06-01
|
Southwest Power Pool, Inc - ER27-136-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO ER27-144-000 (ER27-144-000) |
§ 205(d) Rate Filing: Ameren Illinois Company submits tariff filing per 35.13(a)(2)(iii: 2026-10-14_SA 3028 Ameren IL-Prairie Power Project #47 Atkinson to be e
Midcontinent Independent System Operator, Inc., Ameren Illinois Company $AEE
FERC Accession 20261014-5126, MN | Filed 2026-10-19 | Target COD 2027-06-01
|
Midcontinent Independent System Operator, Inc., Ameren Illinois Company - ER27-144-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ES27-3-000 (ES27-3-000) |
Application Under Section 204 of the Federal Power Act for Authorization to Issue Securities of GridLiance High Plains LLC.
GridLiance High Plains LLC
FERC Accession 20261013-5470, PA | Filed 2026-10-19 | Target COD 2027-06-01
|
GridLiance High Plains LLC - ES27-3-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM AC27-2-000 (AC27-2-000) |
Florida Power & Light Company submits final journal entries for the purchase of transmission assets from Seminole Electric Cooperative, Inc.
Florida Power & Light Company $NEE
FERC Accession 20261009-5182, PA | Filed 2026-10-16 | Target COD 2027-06-01
|
Florida Power & Light Company - AC27-2-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM EL26-114-000 (EL26-114-000) |
Basin Electric Power Cooperative submits Petition for Declaratory Order.
Basin Electric Power Cooperative
FERC Accession 20260930-5277, PA | Filed 2026-10-16 | Target COD 2027-06-01
|
Basin Electric Power Cooperative - EL26-114-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER20-681-017 (ER20-681-017) |
Compliance filing: Compliance Filing and Req for Clarification or Rehearing to be effective 9/11/2026.
Tri-State Generation and Transmission Association, Inc
FERC Accession 20261013-5350, PA | Filed 2026-10-16 | Target COD 2027-06-01
|
Tri-State Generation and Transmission Association, Inc - ER20-681-017
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER26-2390-002 (ER26-2390-002) |
Tariff Amendment: Response to Second Deficiency Letter on Amended Market-Based Rate Tariff Filings to be effective 12/13/2026.
AL Solar D, LLC
FERC Accession 20261013-5181, PA | Filed 2026-10-16 | Target COD 2027-06-01
|
AL Solar D, LLC - ER26-2390-002
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER26-2391-002 (ER26-2391-002) |
Tariff Amendment: Response to Second Deficiency Letter on Amended Market-Based Rate Tariff Filings to be effective 12/13/2026.
FL Solar 7, LLC
FERC Accession 20261013-5225, PA | Filed 2026-10-16 | Target COD 2027-06-01
|
FL Solar 7, LLC - ER26-2391-002
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER26-2392-002 (ER26-2392-002) |
Tariff Amendment: Response to Second Deficiency Letter on Amended Market-Based Rate Tariff Filings to be effective 12/13/2026.
IN Solar 1, LLC
FERC Accession 20261013-5233, PA | Filed 2026-10-16 | Target COD 2027-06-01
|
IN Solar 1, LLC - ER26-2392-002
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER26-2393-002 (ER26-2393-002) |
Tariff Amendment: Response to Second Deficiency Letter on Amended Market-Based Rate Tariff Filings to be effective 12/13/2026.
AL Solar G, LLC
FERC Accession 20261013-5160, PA | Filed 2026-10-16 | Target COD 2027-06-01
|
AL Solar G, LLC - ER26-2393-002
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER26-2394-002 (ER26-2394-002) |
Tariff Amendment: Response to Second Deficiency Letter on Amended Market-Based Rate Tariff Filings to be effective 12/13/2026.
MS Solar 5, LLC
FERC Accession 20261013-5235, PA | Filed 2026-10-16 | Target COD 2027-06-01
|
MS Solar 5, LLC - ER26-2394-002
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER26-2395-002 (ER26-2395-002) |
Tariff Amendment: Response to Second Deficiency Letter on Amended Market-Based Rate Tariff Filings to be effective 12/13/2026.
MS Solar 6, LLC
FERC Accession 20261013-5252, PA | Filed 2026-10-16 | Target COD 2027-06-01
|
MS Solar 6, LLC - ER26-2395-002
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER26-2396-002 (ER26-2396-002) |
Tariff Amendment: Response to Second Deficiency Letter
MS Solar 7, LLC
FERC Accession 20261013-5257, PA | Filed 2026-10-16 | Target COD 2027-06-01
|
MS Solar 7, LLC - ER26-2396-002
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER26-2397-002 (ER26-2397-002) |
Tariff Amendment: Response to Second Deficiency Letter on Amended Market-Based Rate Tariff Filings to be effective 12/13/2026.
AL Solar H, LLC
FERC Accession 20261013-5188, PA | Filed 2026-10-16 | Target COD 2027-06-01
|
AL Solar H, LLC - ER26-2397-002
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER26-2399-002 (ER26-2399-002) |
Tariff Amendment: Response to Second Deficiency Letter on Amended Market-Based Rate Tariff Filings to be effective 12/13/2026.
Chalan CA Solar Storage, LLC
FERC Accession 20261013-5199, PA | Filed 2026-10-16 | Target COD 2027-06-01
|
Chalan CA Solar Storage, LLC - ER26-2399-002
345 kV | Battery Energy Storage (BESS)
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Battery Energy Storage (BESS)) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER26-2400-002 (ER26-2400-002) |
Tariff Amendment: Response to Second Deficiency Letter on Amended Market-Based Rate Tariff Filings to be effective 12/13/2026.
Escalante Solar, LLC
FERC Accession 20261013-5213, PA | Filed 2026-10-16 | Target COD 2027-06-01
|
Escalante Solar, LLC - ER26-2400-002
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER26-3312-001 (ER26-3312-001) |
Tariff Amendment: Response to Information Request to be effective 7/30/2026.
Bulldog Solar, LLC
FERC Accession 20261013-5361, PA | Filed 2026-10-16 | Target COD 2027-06-01
|
Bulldog Solar, LLC - ER26-3312-001
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER26-3313-001 (ER26-3313-001) |
Tariff Amendment: Response to Information Request to be effective 7/30/2026.
Cane Creek Solar, LLC
FERC Accession 20261013-5367, PA | Filed 2026-10-16 | Target COD 2027-06-01
|
Cane Creek Solar, LLC - ER26-3313-001
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER26-3314-001 (ER26-3314-001) |
Tariff Amendment: Response to Information Request to be effective 7/30/2026.
Catalina Solar, LLC
FERC Accession 20261013-5379, PA | Filed 2026-10-16 | Target COD 2027-06-01
|
Catalina Solar, LLC - ER26-3314-001
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER26-3328-001 (ER26-3328-001) |
Tariff Amendment: Response to Information Request to be effective 7/30/2026.
Virginia Line Solar, LLC
FERC Accession 20261013-5372, PA | Filed 2026-10-16 | Target COD 2027-06-01
|
Virginia Line Solar, LLC - ER26-3328-001
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-112-000 (ER27-112-000) |
205(d) Rate Filing: Amended & Restated Shared Facilities Agreement to be effective 10/10/2026.
Rush Springs Wind Energy, LLC
FERC Accession 20261009-5167, PA | Filed 2026-10-16 | Target COD 2027-06-01
|
Rush Springs Wind Energy, LLC - ER27-112-000
345 kV | Wind Generation
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Wind Generation) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| SPP ER27-118-000 (ER27-118-000) |
205(d) Rate Filing: Revisions to Tariff to Add Marginal GHG Price in Day-Ahead Market Results to be effective 12/31/9998.
Southwest Power Pool, Inc
FERC Accession 20261013-5076, OK | Filed 2026-10-16 | Target COD 2027-06-01
|
Southwest Power Pool, Inc - ER27-118-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM 6676 (ER27-119-000) |
Tariff Amendment: Notice of Cancellation of UCSA, SA No. 6676; Queue Position No. MISO J799 to be effective 12/13/2026.
PJM Interconnection, L.L.C
FERC Accession 20261013-5170, PJM | Filed 2026-10-16 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-119-000
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM 6712 (ER27-121-000) |
Tariff Amendment: Notice of Cancellation of UCSA, SA No. 6712; Queue Position No. MISO J806 to be effective 12/13/2026.
PJM Interconnection, L.L.C
FERC Accession 20261013-5215, PJM | Filed 2026-10-16 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-121-000
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM EC27-4-000 (EC27-4-000) |
Application for Authorization Under Section 203 of the Federal Power Act of WS-Sarish LLC.
WS-Sarish LLC
FERC Accession 20261008-5172, PA | Filed 2026-10-15 | Target COD 2027-06-01
|
WS-Sarish LLC - EC27-4-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| SPP ER26-2947-000 (ER26-2947-000) |
Refund Report: Refund Report-Amended and Restated Emergency Energy Transactions Agreement to be effective N/A.
Southwest Power Pool, Inc
FERC Accession 20261009-5062, OK | Filed 2026-10-15 | Target COD 2027-06-01
|
Southwest Power Pool, Inc - ER26-2947-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| SPP ER26-3068-000 (ER26-3068-000) |
Refund Report: 3474R2 Clarksville Connected Utilities Refund Report to be effective N/A.
Southwest Power Pool, Inc
FERC Accession 20261009-5011, OK | Filed 2026-10-15 | Target COD 2027-06-01
|
Southwest Power Pool, Inc - ER26-3068-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER26-3734-001 (ER26-3734-001) |
Tariff Amendment: Amendment to GDECS Revisions to PJM Tariff, Operating Agreement and RAA to be effective 11/8/2026.
PJM Interconnection, L.L.C
FERC Accession 20261009-5139, PJM | Filed 2026-10-15 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER26-3734-001
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| ISO-NE ER27-92-000 (ER27-92-000) |
205(d) Rate Filing: Oct 12, 2026 Membership Filing to be effective 10/12/2026.
New England Power Pool Participants Committee
FERC Accession 20261009-5032, MA | Filed 2026-10-15 | Target COD 2027-06-01
|
New England Power Pool Participants Committee - ER27-92-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| SPP ER27-97-000 (ER27-97-000) |
205(d) Rate Filing: Revisions to Markets+ Tariff to Enhance the Market Storage Resource Design to be effective 12/31/9998.
Southwest Power Pool, Inc
FERC Accession 20261009-5071, OK | Filed 2026-10-15 | Target COD 2027-06-01
|
Southwest Power Pool, Inc - ER27-97-000
345 kV | Battery Energy Storage (BESS)
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Battery Energy Storage (BESS)) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-99-000 (ER27-99-000) |
205(d) Rate Filing: Market-Based Rate Tariff Update to be effective 12/9/2026.
Three Rivers Solar Power, LLC
FERC Accession 20261009-5073, PA | Filed 2026-10-15 | Target COD 2027-06-01
|
Three Rivers Solar Power, LLC - ER27-99-000
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| CAISO ER27-104-000 (ER27-104-000) |
205(d) Rate Filing: TO SA 347: Amended and Restated SA with Addition of Davis Substation to be effective 1/1/2027.
Pacific Gas and Electric Company $PCG
FERC Accession 20261009-5102, CA | Filed 2026-10-15 | Target COD 2027-06-01
|
Pacific Gas and Electric Company - ER27-104-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-106-000 (ER27-106-000) |
205(d) Rate Filing: Revised Market-Based Rate Tariff to be effective 10/10/2026.
Solar DG NM Amalia, LLC
FERC Accession 20261009-5114, PA | Filed 2026-10-15 | Target COD 2027-06-01
|
Solar DG NM Amalia, LLC - ER27-106-000
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-108-000 (ER27-108-000) |
205(d) Rate Filing: Revised Market-Based Rate Tariff to be effective 10/10/2026.
Lily Solar LLC
FERC Accession 20261009-5118, PA | Filed 2026-10-15 | Target COD 2027-06-01
|
Lily Solar LLC - ER27-108-000
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-110-000 (ER27-110-000) |
205(d) Rate Filing: Alabama Power Company submits tariff filing per 35.13(a)(2)(iii: SWE (PowerSouth Territorial) Amended and Restated NITSA Filing to be effect
Alabama Power Company, Georgia Power Company, Mississippi Power Company $SO
FERC Accession 20261009-5161, PA | Filed 2026-10-15 | Target COD 2027-06-01
|
Alabama Power Company, Georgia Power Company, Mississippi Power Company - ER27-110-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-111-000 (ER27-111-000) |
205(d) Rate Filing: Alabama Power Company submits tariff filing per 35.13(a)(2)(iii: PowerSouth Third Amended and Restated NITSA Filing to be effective 9/24/202
Alabama Power Company, Georgia Power Company, Mississippi Power Company $SO
FERC Accession 20261009-5164, PA | Filed 2026-10-15 | Target COD 2027-06-01
|
Alabama Power Company, Georgia Power Company, Mississippi Power Company - ER27-111-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM RP27-24-000 (RP27-24-000) |
Joint Petition for Limited Waiver of Capacity Release Regulations, et al. and Request for Expedited Action of Shell Energy North America (US), L.P., et al.
Shell Energy North America (U.S.), L.P., Constellation Energy Generation, LLC $CEG
FERC Accession 20261007-5160, PA | Filed 2026-10-14 | Target COD 2027-06-01
|
Shell Energy North America (U.S.), L.P., Constellation Energy Generation, LLC - RP27-24-000
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM EC27-3-000 (EC27-3-000) |
Application for Authorization Under Section 203 of the Federal Power Act of Astoria Energy II LLC.
Astoria Energy II LLC
FERC Accession 20261007-5236, PA | Filed 2026-10-14 | Target COD 2027-06-01
|
Astoria Energy II LLC - EC27-3-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER20-2446-008 (ER20-2446-008) |
Refund Report: Refund Report to be effective N/A.
Bitter Ridge Wind Farm, LLC
FERC Accession 20261008-5098, PA | Filed 2026-10-14 | Target COD 2027-06-01
|
Bitter Ridge Wind Farm, LLC - ER20-2446-008
345 kV | Wind Generation
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Wind Generation) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-79-000 (ER27-79-000) |
205(d) Rate Filing: ITC Midwest LLC submits tariff filing per 35.13(a)(2)(iii: 2026-10-08_SA 4882 ITC Midwest-Interstate Power and Light E&P (J2949) to be effec
ITC Midwest LLC
FERC Accession 20261008-5068, PA | Filed 2026-10-14 | Target COD 2027-06-01
|
ITC Midwest LLC - ER27-79-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-80-000 (ER27-80-000) |
205(d) Rate Filing: DEC-TVA Transmission Interconnection Agreement and Emergency Energy Agreement to be effective 12/31/9998.
Duke Energy Carolinas, LLC $DUK
FERC Accession 20261008-5071, PA | Filed 2026-10-14 | Target COD 2027-06-01
|
Duke Energy Carolinas, LLC - ER27-80-000
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM 6507 (ER27-81-000) |
Tariff Amendment: Notice of Cancellation of SA No. 6507; Queue Position No. MISO J793 to be effective 12/8/2026.
PJM Interconnection, L.L.C
FERC Accession 20261008-5088, PJM | Filed 2026-10-14 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-81-000
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-83-000 (ER27-83-000) |
205(d) Rate Filing: Application for MBR Authority with Waivers-Ninnescah Flats Energy Storage, LLC to be effective 12/8/2026.
Ninnescah Flats Energy Storage, LLC
FERC Accession 20261008-5102, PA | Filed 2026-10-14 | Target COD 2027-06-01
|
Ninnescah Flats Energy Storage, LLC - ER27-83-000
345 kV | Battery Energy Storage (BESS)
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Battery Energy Storage (BESS)) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-84-000 (ER27-84-000) |
205(d) Rate Filing: Application for MBR Authorization with Waivers-Rush Springs ES II, LLC to be effective 12/8/2026.
Rush Springs Energy Storage II, LLC
FERC Accession 20261008-5104, PA | Filed 2026-10-14 | Target COD 2027-06-01
|
Rush Springs Energy Storage II, LLC - ER27-84-000
345 kV | Battery Energy Storage (BESS)
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Battery Energy Storage (BESS)) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-86-000 (ER27-86-000) |
205(d) Rate Filing: Certificate of Concurrence to SFA and eTariff Baseline Filing to be effective 10/9/2026.
Stetson Wind II, LLC
FERC Accession 20261008-5122, PA | Filed 2026-10-14 | Target COD 2027-06-01
|
Stetson Wind II, LLC - ER27-86-000
345 kV | Wind Generation
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Wind Generation) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-88-000 (ER27-88-000) |
Tariff Amendment: Cancellation of Rate Schedule Nos. 177, 178, and 179 to be effective 12/9/2026.
Idaho Power Company
FERC Accession 20261008-5148, PA | Filed 2026-10-14 | Target COD 2027-06-01
|
Idaho Power Company - ER27-88-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM EL27-3-000 (EL27-3-000) |
Complaint of Monongahela Power Company v. PJM Interconnection, L.L.C.
Monongahela Power Company $FE
FERC Accession 20261006-5055, PJM | Filed 2026-10-13 | Target COD 2027-06-01
|
Monongahela Power Company - EL27-3-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER13-908-006 (ER13-908-006) |
Compliance filing: Compliance Filing-Correct Southern Companies' Attach K eTariff Record Metadata to be effective 1/1/2015.
Alabama Power Company $SO
FERC Accession 20261007-5053, PA | Filed 2026-10-13 | Target COD 2027-06-01
|
Alabama Power Company - ER13-908-006
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| SPP ER26-3625-001 (ER26-3625-001) |
Tariff Amendment: Amended Filing-Revisions for SPP Generating Facilities Modeling Requirements to be effective 10/26/2026.
Southwest Power Pool, Inc
FERC Accession 20261007-5143, OK | Filed 2026-10-13 | Target COD 2027-06-01
|
Southwest Power Pool, Inc - ER26-3625-001
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM 1336 (ER27-57-000) |
205(d) Rate Filing: AEPSC submits Facilities Agmt w/Buckeye-SA No. 1336 to be effective 1/1/2027.
Ohio Power Company $AEP
FERC Accession 20261007-5018, PA | Filed 2026-10-13 | Target COD 2027-06-01
|
Ohio Power Company - ER27-57-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| SPP ER27-61-000 (ER27-61-000) |
205(d) Rate Filing: Revisions to Clarify Outage Documentation References to be effective 12/7/2026.
Southwest Power Pool, Inc
FERC Accession 20261007-5029, OK | Filed 2026-10-13 | Target COD 2027-06-01
|
Southwest Power Pool, Inc - ER27-61-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-64-000 (ER27-64-000) |
205(d) Rate Filing: Alabama Power Company submits tariff filing per 35.13(a)(2)(iii): SERTP Enrollment of SCRTP Sponsors Filing to be effective 1/1/2027.
Alabama Power Company, Georgia Power Company, Mississippi Power Company $SO
FERC Accession 20261007-5066, PA | Filed 2026-10-13 | Target COD 2027-06-01
|
Alabama Power Company, Georgia Power Company, Mississippi Power Company - ER27-64-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM AE2-236 (ER27-66-000) |
Tariff Amendment: Notice of Cancellation of Service Agreement No. 7063; Queue No. AE2-236 to be effective 12/7/2026.
PJM Interconnection, L.L.C
FERC Accession 20261007-5069, PJM | Filed 2026-10-13 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-66-000
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-67-000 (ER27-67-000) |
205(d) Rate Filing: Alabama Power Company submits tariff filing per 35.13(a)(2)(iii): Revision of SERTP Enrollment Exhibit to Reflect Recent Mergers to be effec
Alabama Power Company, Georgia Power Company, Mississippi Power Company $SO
FERC Accession 20261007-5082, PA | Filed 2026-10-13 | Target COD 2027-06-01
|
Alabama Power Company, Georgia Power Company, Mississippi Power Company - ER27-67-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-69-000 (ER27-69-000) |
Tariff Amendment: Notice of Cancellation of FERC Electric MBR Tariff to be effective 10/8/2026.
Klamath Generation LLC
FERC Accession 20261007-5086, PA | Filed 2026-10-13 | Target COD 2027-06-01
|
Klamath Generation LLC - ER27-69-000
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ES26-78-000 (ES26-78-000) |
Application Under Section 204 of the Federal Power Act for Authorization to Issue Securities of Mississippi Power Company.
Mississippi Power Company
FERC Accession 20260929-5208, PA | Filed 2026-10-13 | Target COD 2027-06-01
|
Mississippi Power Company - ES26-78-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM RP27-2-000 (RP27-2-000) |
§ 4(d) Rate Filing: Non Conforming Service Agreements Idaho Power, Questar, and Puget to be effective 11/1/2026.
Northwest Pipeline LLC
FERC Accession 20261001-5002, PA | Filed 2026-10-09 | Target COD 2027-06-01
|
Northwest Pipeline LLC - RP27-2-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER18-140-018 (ER18-140-018) |
Supplement to 06/30/2026 Triennial Market Power Analysis for Northeast Region of Lackawanna Energy Center LLC.
Lackawanna Energy Center LLC
FERC Accession 20260930-5271, PA | Filed 2026-10-09 | Target COD 2027-06-01
|
Lackawanna Energy Center LLC - ER18-140-018
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER24-116-000 (ER24-116-000) |
Supplement to 07/01/2025, Triennial Market Power Analysis for Southwest Region and Notice of Non-Material Change in Status of Rhythm Ops, LLC, et al.
Inspire Energy Holdings, LLC, Rhythm Ops, LLC
FERC Accession 20260924-5211, PA | Filed 2026-10-09 | Target COD 2027-06-01
|
Inspire Energy Holdings, LLC, Rhythm Ops, LLC - ER24-116-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM EC26-129-000 (EC26-129-000) |
Supplement to 07/14/2026, Application for Authorization Under Section 203 of the Federal Power Act of Idaho Power Company.
Idaho Power Company
FERC Accession 20261002-5243, PA | Filed 2026-10-08 | Target COD 2027-06-01
|
Idaho Power Company - EC26-129-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM EC26-166-000 (EC26-166-000) |
Response to 09/23/2026, Deficiency Letter of GSP Newington, LLC, et al.
GSP Newington LLC, GSP White Lake LLC, GSP Lost Nation LLC, Gate City Power Holdings II LLC
FERC Accession 20261001-5414, PA | Filed 2026-10-08 | Target COD 2027-06-01
|
GSP Newington LLC, GSP White Lake LLC, GSP Lost Nation LLC, Gate City Power Hold - EC26-166-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM EC27-2-000 (EC27-2-000) |
Joint Application for Authorization Under Section 203 of the Federal Power Act of Chief Conemaugh Power, LLC, et al.
Chief Keystone Power, LLC, Chief Conemaugh Power, LLC
FERC Accession 20261002-5239, PA | Filed 2026-10-08 | Target COD 2027-06-01
|
Chief Keystone Power, LLC, Chief Conemaugh Power, LLC - EC27-2-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| SPP ER26-2764-000 (ER26-2764-000) |
Refund Report: 1628R32 Western Farmers Electric Cooperative Refund Report to be effective N/A.
Southwest Power Pool, Inc
FERC Accession 20261005-5123, OK | Filed 2026-10-08 | Target COD 2027-06-01
|
Southwest Power Pool, Inc - ER26-2764-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| MISO ER26-3459-001 (ER26-3459-001) |
Tariff Amendment: ELL-SLEMCO Transmission Interconnection Agreement to be effective 8/8/2026.
Entergy Louisiana, LLC $ETR
FERC Accession 20261002-5170, MN | Filed 2026-10-08 | Target COD 2027-06-01
|
Entergy Louisiana, LLC - ER26-3459-001
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-35-000 (ER27-35-000) |
§ 205(d) Rate Filing: Construction Management Agmnt Big Stone South to Alexandria Transmission Proj to be effective 9/3/2026.
Otter Tail Power Company
FERC Accession 20261002-5171, PA | Filed 2026-10-08 | Target COD 2027-06-01
|
Otter Tail Power Company - ER27-35-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-36-000 (ER27-36-000) |
§ 205(d) Rate Filing: Operation and Maintenance Agrmnt Big Stone South to Alexandria Transmission Proj to be effective 9/3/2026.
Otter Tail Power Company
FERC Accession 20261002-5174, PA | Filed 2026-10-08 | Target COD 2027-06-01
|
Otter Tail Power Company - ER27-36-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM 7466 (ER27-37-000) |
§ 205(d) Rate Filing: CSA, First Revised SA No. 7466; Project Identifier No. AG1-054/AG2-236 to be effective 9/3/2026.
PJM Interconnection, L.L.C
FERC Accession 20261005-5038, PJM | Filed 2026-10-08 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-37-000
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-42-000 (ER27-42-000) |
Initial Rate Filing: Application for Market-Based Rate Authority-Winchester Solar I, LLC to be effective 12/5/2026.
Winchester Solar I, LLC
FERC Accession 20261005-5071, PA | Filed 2026-10-08 | Target COD 2027-06-01
|
Winchester Solar I, LLC - ER27-42-000
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-43-000 (ER27-43-000) |
Initial Rate Filing: Application for Market-Based Rate Authority-Winchester Solar II, LLC to be effective 12/5/2026.
Winchester Solar II, LLC
FERC Accession 20261005-5073, PA | Filed 2026-10-08 | Target COD 2027-06-01
|
Winchester Solar II, LLC - ER27-43-000
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-49-000 (ER27-49-000) |
Initial Rate Filing: Petition for Order Accepting Market-Based Rate Tariff and Granting Waivers to be effective 10/12/2026.
Murch Solar, LLC
FERC Accession 20261005-5102, PA | Filed 2026-10-08 | Target COD 2027-06-01
|
Murch Solar, LLC - ER27-49-000
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| SPP ER27-50-000 (ER27-50-000) |
§ 205(d) Rate Filing: Revisions to Markets+ Tariff to Add Co-Located Resource Functionality to be effective 12/31/9998.
Southwest Power Pool, Inc
FERC Accession 20261005-5133, OK | Filed 2026-10-08 | Target COD 2027-06-01
|
Southwest Power Pool, Inc - ER27-50-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| ISO-NE ES27-1-000 (ES27-1-000) |
Application Under Section 204 of the Federal Power Act for Authorization to Issue Securities of The Narragansett Electric Company.
Narragansett Electric Company d/b/a Rhode Island Energy
FERC Accession 20261002-5242, MA | Filed 2026-10-08 | Target COD 2027-06-01
|
Narragansett Electric Company d/b/a Rhode Island Energy - ES27-1-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ES27-2-000 (ES27-2-000) |
Application Under Section 204 of the Federal Power Act for Authorization to Issue Securities of Monongahela Power Company.
Monongahela Power Company $FE
FERC Accession 20261002-5244, PA | Filed 2026-10-08 | Target COD 2027-06-01
|
Monongahela Power Company - ES27-2-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM 6183 (ER27-20-000) |
Tariff Amendment: Notice of Cancellation of WMPA, SA No. 6183; AF1-005 re: suspension to be effective 12/1/2026.
PJM Interconnection, L.L.C
FERC Accession 20261001-5321, PJM | Filed 2026-10-08 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-20-000
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-28-000 (ER27-28-000) |
§ 205(d) Rate Filing: Amendment to Rate Schedule No. 15 to be effective 10/1/2026.
Tri-State Generation and Transmission Association, Inc
FERC Accession 20261002-5090, PA | Filed 2026-10-08 | Target COD 2027-06-01
|
Tri-State Generation and Transmission Association, Inc - ER27-28-000
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| NYISO ER27-31-000 (ER27-31-000) |
§ 205(d) Rate Filing: New York Independent System Operator, Inc.
Niagara Mohawk Power Corporation, New York Independent System Operator, Inc $NGG
FERC Accession 20261002-5121, NY | Filed 2026-10-08 | Target COD 2027-06-01
|
Niagara Mohawk Power Corporation, New York Independent System Operator, Inc - ER27-31-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-32-000 (ER27-32-000) |
§ 205(d) Rate Filing: Willow Creek ES, LLC-Application for MBR Authorization-Expedited Treatment to be effective 10/3/2026.
Willow Creek Energy Storage, LLC
FERC Accession 20261002-5122, PA | Filed 2026-10-08 | Target COD 2027-06-01
|
Willow Creek Energy Storage, LLC - ER27-32-000
345 kV | Battery Energy Storage (BESS)
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Battery Energy Storage (BESS)) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-34-000 (ER27-34-000) |
§ 205(d) Rate Filing: Ministerial Clean-Up Revisions to PJM Tariff, Attachment Q to be effective 2/11/2026.
PJM Interconnection, L.L.C
FERC Accession 20261002-5125, PJM | Filed 2026-10-08 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-34-000
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM EC26-181-000 (EC26-181-000) |
Joint Application for Authorization Under Section 203 of the Federal Power Act of Rhode Island State Energy Center, LP, et al.
Rhode Island State Energy Center, LP, Constellation Energy Generation, LLC $CEG
FERC Accession 20260930-5275, PA | Filed 2026-10-06 | Target COD 2027-06-01
|
Rhode Island State Energy Center, LP, Constellation Energy Generation, LLC - EC26-181-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER19-2858-010 (ER19-2858-010) |
Refund Report: Refund Report to be effective N/A.
East Coast Power Linden Holding, L.L.C
FERC Accession 20260930-5229, PA | Filed 2026-10-06 | Target COD 2027-06-01
|
East Coast Power Linden Holding, L.L.C - ER19-2858-010
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER22-2946-007 (ER22-2946-007) |
Refund Report: Refund Report to be effective N/A.
Red Oak Power, LLC
FERC Accession 20261001-5269, PA | Filed 2026-10-06 | Target COD 2027-06-01
|
Red Oak Power, LLC - ER22-2946-007
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER26-1487-002 (ER26-1487-002) |
Notice of Non-Material Change in Status of Hecate Energy Cider Solar LLC.
Hecate Energy Cider Solar LLC
FERC Accession 20260930-5265, PA | Filed 2026-10-06 | Target COD 2027-06-01
|
Hecate Energy Cider Solar LLC - ER26-1487-002
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER26-1695-002 (ER26-1695-002) |
Notice of Non-Material Change in Status of Big Muddy Solar Project, LLC.
Big Muddy Solar Project, LLC
FERC Accession 20260930-5267, PA | Filed 2026-10-06 | Target COD 2027-06-01
|
Big Muddy Solar Project, LLC - ER26-1695-002
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| SPP ER26-2638-002 (ER26-2638-002) |
Tariff Amendment: Deficiency Response-Revisions to Adjust RUC Make Whole Payment Distribution to be effective 12/31/9998.
Southwest Power Pool, Inc
FERC Accession 20261001-5318, OK | Filed 2026-10-06 | Target COD 2027-06-01
|
Southwest Power Pool, Inc - ER26-2638-002
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER26-3241-001 (ER26-3241-001) |
Tariff Amendment: Standard Power Co. Deficiency Response-Docket No. ER26-3241-000 to be effective 10/1/2026.
Standard Power Co
FERC Accession 20261001-5284, PA | Filed 2026-10-06 | Target COD 2027-06-01
|
Standard Power Co - ER26-3241-001
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| ISO-NE ER26-3897-000 (ER26-3897-000) |
§ 205(d) Rate Filing: Oct 2026 Membership Filing to be effective 10/1/2026.
New England Power Pool Participants Committee
FERC Accession 20260930-5206, MA | Filed 2026-10-06 | Target COD 2027-06-01
|
New England Power Pool Participants Committee - ER26-3897-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER26-3898-000 (ER26-3898-000) |
§ 205(d) Rate Filing: Periodic Review of Default CONE and ACR Values to be effective 11/30/2026.
PJM Interconnection, L.L.C
FERC Accession 20260930-5220, PJM | Filed 2026-10-06 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER26-3898-000
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER26-3900-000 (ER26-3900-000) |
§ 205(d) Rate Filing: Proposed Tariff Revisions to Establish PRM for Rockies Subregion to be effective 10/1/2026.
Northwest Power Pool
FERC Accession 20260930-5240, PA | Filed 2026-10-06 | Target COD 2027-06-01
|
Northwest Power Pool - ER26-3900-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-1-000 (ER27-1-000) |
§ 205(d) Rate Filing: Request for Change in Rates to Distribution Cooperative Member-Owners to be effective 1/1/2027.
Wolverine Power Supply Cooperative, Inc
FERC Accession 20261001-5005, PA | Filed 2026-10-06 | Target COD 2027-06-01
|
Wolverine Power Supply Cooperative, Inc - ER27-1-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| SPP ER27-4-000 (ER27-4-000) |
§ 205(d) Rate Filing: 2415R25 Kansas Municipal Energy Agency NITSA and NOA to be effective 9/1/2026.
Southwest Power Pool, Inc
FERC Accession 20261001-5086, OK | Filed 2026-10-06 | Target COD 2027-06-01
|
Southwest Power Pool, Inc - ER27-4-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-6-000 (ER27-6-000) |
§ 205(d) Rate Filing: AEG Filing to Revise Depreciation Rates in Unit Power Service Agreement to be effective 1/1/2027.
AEP Generating Company $AEP
FERC Accession 20261001-5116, PA | Filed 2026-10-06 | Target COD 2027-06-01
|
AEP Generating Company - ER27-6-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-7-000 (ER27-7-000) |
Initial Rate Filing: Application for Blanket MBR Authorization w/Waivers & Expedited Treatment to be effective 11/20/2026.
Clermont Solar, LLC
FERC Accession 20261001-5148, PA | Filed 2026-10-06 | Target COD 2027-06-01
|
Clermont Solar, LLC - ER27-7-000
345 kV | Solar PV + Storage
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Solar PV + Storage) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| SPP ER27-11-000 (ER27-11-000) |
§ 205(d) Rate Filing: 607R53 Evergy Kansas Central, Inc. NITSA NOA to be effective 9/1/2026.
Southwest Power Pool, Inc $EVRG
FERC Accession 20261001-5190, OK | Filed 2026-10-06 | Target COD 2027-06-01
|
Southwest Power Pool, Inc - ER27-11-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| ERCOT 902 (ER27-12-000) |
Tariff Amendment: Cancel SA No. 902 Portside Energy Center Generation Interconnection Agreement to be effective 12/1/2026.
AEP Texas Inc $AEP
FERC Accession 20261001-5194, TX | Filed 2026-10-06 | Target COD 2027-06-01
|
AEP Texas Inc - ER27-12-000
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-13-000 (ER27-13-000) |
§ 205(d) Rate Filing: Shared Facilities Common Ownership Agreement to be effective 10/2/2026.
LRE Interconnection Manager, LLC
FERC Accession 20261001-5208, PA | Filed 2026-10-06 | Target COD 2027-06-01
|
LRE Interconnection Manager, LLC - ER27-13-000
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| SPP ER27-14-000 (ER27-14-000) |
§ 205(d) Rate Filing: 1630R14 The Empire District Electric Company NITSA and NOA to be effective 9/1/2026.
Southwest Power Pool, Inc
FERC Accession 20261001-5224, OK | Filed 2026-10-06 | Target COD 2027-06-01
|
Southwest Power Pool, Inc - ER27-14-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM ER27-15-000 (ER27-15-000) |
Tariff Amendment: PJM Interconnection, L.L.C. submits tariff filing per 35.15: Notice of Cancellation of WMPA, SA Agreement. 6186; AF1-003 re: suspension to be
PJM Interconnection, L.L.C
FERC Accession 20261001-5226, PJM | Filed 2026-10-06 | Target COD 2027-06-01
|
PJM Interconnection, L.L.C - ER27-15-000
345 kV | High-Voltage Grid Interconnection
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (High-Voltage Grid Interconnection) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| PJM for (ER27-18-000) |
§ 205(d) Rate Filing: COC-JTIQ 345kV Transmission Project for Big Stone South-Hankinson-Bison JDA to be effective 7/16/2026.
Otter Tail Power Company
FERC Accession 20261001-5247, PA | Filed 2026-10-06 | Target COD 2027-06-01
|
Otter Tail Power Company - ER27-18-000
345 kV | Natural Gas / Dispatchable
|
125 MW
Est. Upg: $18.0M
|
TRANSFORMER BOTTLENECK (24-36M LEAD)
Lead Risk: 36-48 Months (345kV-500kV GSU Transformer Bottleneck)
Utility-scale 125 MW (Natural Gas / Dispatchable) interconnection on 345kV bus - long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).
|
Official Filing ↗ |
| DOD-DOE N0002407C4014 |
Defense Contract Management Agency: MTG SET
ROLLS-ROYCE CORPORATION $RR.L
Defense Contract Management Agency, IN | Filed 2025-10-01 | Target COD 2022-09-30
|
Defense Contract Management Agency (IN)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
473 MW
Est. Upg: $85.1M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE W909MY23F0078 |
Department of the Army: AMMPS DELIVERY ORDER 21
CUMMINS POWER GENERATION INC. $CMI
Department of the Army, MN | Filed 2023-08-22 | Target COD 2025-12-12
|
Department of the Army (MN)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
424 MW
Est. Upg: $76.3M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| NYISO C24-189 |
North Country Wind (NYPA)
NY North Country, LLC
Franklin and Clinton, NY | Filed 2024-09-18 | Target COD 2028-06-01
|
Willis 230kV substation
230 kV | Onshore Wind
|
380 MW
Est. Upg: $17.1M
|
ACTIVE IA / CONSTRUCTION
Lead Risk: 18-30 Months (Medium/High Voltage Transformer)
NYISO interconnection filing (380 MW) - balance-of-plant electrical equipment, switchgear, and substation engineering opportunity.
|
Official Filing ↗ |
| DOD-DOE FA205725CB002 |
Department of the Air Force: THE NGSS SUITE IS COMPRISED OF THREE (3) SENSOR OPEN SYSTEM ARCHITECTURE (SOSA)-ALIGNED, 3U OPENVPX FORM FACTO
GENERAL DYNAMICS MISSION SYSTEMS, INC. $GD
Department of the Air Force, MA | Filed 2024-12-13 | Target COD 2026-06-30
|
Department of the Air Force (MA)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
333 MW
Est. Upg: $60.0M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE N0002408C4203 |
Defense Contract Management Agency: BASELINE ATG
ROLLS-ROYCE CORPORATION $RR.L
Defense Contract Management Agency, IN | Filed 2025-10-01 | Target COD 2022-09-30
|
Defense Contract Management Agency (IN)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
325 MW
Est. Upg: $58.6M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE W9128F26CA013 |
Department of the Army: GSU TRANSFORMERS FOR OAHE AND FORT PECK DAMS
PAF ELECTRICAL, INC.
Department of the Army, MT | Filed 2026-02-20 | Target COD 2031-02-20
|
Department of the Army (MT)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
317 MW
Est. Upg: $57.0M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| NYISO C26-0020 |
Brookside Forest (NM-NG)
Brookside Forest Energy Storage LLC
Lowville, NY | Filed 2026-08-10 | Target COD 2028-06-01
|
115kV Waters Road Station
115 kV | Battery Energy Storage (BESS)
|
300 MW
Est. Upg: $13.5M
|
ACTIVE IA / CONSTRUCTION
Lead Risk: 18-30 Months (Medium/High Voltage Transformer)
NYISO interconnection filing (300 MW) - balance-of-plant electrical equipment, switchgear, and substation engineering opportunity.
|
Official Filing ↗ |
| NYISO C26-0002 |
Roma Storage (ConEd)
Roma Storage LLC $ED
Queens, NY | Filed 2026-07-31 | Target COD 2028-06-01
|
Astoria East 138 kV
138 kV | Battery Energy Storage (BESS)
|
300 MW
Est. Upg: $13.5M
|
ACTIVE IA / CONSTRUCTION
Lead Risk: 18-30 Months (Medium/High Voltage Transformer)
NYISO interconnection filing (300 MW) - balance-of-plant electrical equipment, switchgear, and substation engineering opportunity.
|
Official Filing ↗ |
| NYISO C24-352 |
Swiss Valley Energy Storage (NYSEG)
Sawhall Energy Storage LLC
Wyoming, NY | Filed 2024-10-15 | Target COD 2028-06-01
|
Wethersfield 230 kV Substation
230 kV | Battery Energy Storage (BESS)
|
300 MW
Est. Upg: $13.5M
|
ACTIVE IA / CONSTRUCTION
Lead Risk: 18-30 Months (Medium/High Voltage Transformer)
NYISO interconnection filing (300 MW) - balance-of-plant electrical equipment, switchgear, and substation engineering opportunity.
|
Official Filing ↗ |
| NYISO C24-358 |
Sugar Loaf Energy Storage I (O&R)
Hambletonian Energy Storage LLC
Orange, NY | Filed 2024-10-15 | Target COD 2028-06-01
|
Sugarloaf 138 kV Substation
138 kV | Battery Energy Storage (BESS)
|
300 MW
Est. Upg: $13.5M
|
ACTIVE IA / CONSTRUCTION
Lead Risk: 18-30 Months (Medium/High Voltage Transformer)
NYISO interconnection filing (300 MW) - balance-of-plant electrical equipment, switchgear, and substation engineering opportunity.
|
Official Filing ↗ |
| NYISO C24-148 |
Willard Storage (NM-NG)
Emeren US, LLC
Rensselaer, NY | Filed 2024-09-10 | Target COD 2028-06-01
|
Eastover 115kV
115 kV | Battery Energy Storage (BESS)
|
300 MW
Est. Upg: $13.5M
|
ACTIVE IA / CONSTRUCTION
Lead Risk: 18-30 Months (Medium/High Voltage Transformer)
NYISO interconnection filing (300 MW) - balance-of-plant electrical equipment, switchgear, and substation engineering opportunity.
|
Official Filing ↗ |
| NYISO C24-005 |
Blue Spruce Storage (ConEd)
Blue Spruce Storage LLC $ED
Bronx, NY | Filed 2024-08-01 | Target COD 2028-06-01
|
Mott Haven 138KV Bus
138 kV | Battery Energy Storage (BESS)
|
300 MW
Est. Upg: $13.5M
|
ACTIVE IA / CONSTRUCTION
Lead Risk: 18-30 Months (Medium/High Voltage Transformer)
NYISO interconnection filing (300 MW) - balance-of-plant electrical equipment, switchgear, and substation engineering opportunity.
|
Official Filing ↗ |
| DOD-DOE W909MY20F0089 |
Department of the Army: AMMPS DELIVERY ORDER #0009 (W909MY20F0089)
CUMMINS POWER GENERATION INC. $CMI
Department of the Army, MN | Filed 2020-06-26 | Target COD 2022-05-31
|
Department of the Army (MN)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
281 MW
Est. Upg: $50.6M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| NYISO C24-165 |
KCE NY 38 (Transco)
KCE NY 38, LLC
Columbia, NY | Filed 2024-09-16 | Target COD 2028-06-01
|
Churchtown 115 kV Substation
115 kV | Battery Energy Storage (BESS)
|
250 MW
Est. Upg: $11.3M
|
ACTIVE IA / CONSTRUCTION
Lead Risk: 18-30 Months (Medium/High Voltage Transformer)
NYISO interconnection filing (250 MW) - balance-of-plant electrical equipment, switchgear, and substation engineering opportunity.
|
Official Filing ↗ |
| NYISO C24-074 |
Lighthouse Energy Storage (NM-NG)
Lighthouse Battery, LLC
Chautauqua, NY | Filed 2024-08-02 | Target COD 2028-06-01
|
Gardenville - Dunkirk Line 74 230 kV
230 kV | Battery Energy Storage (BESS)
|
250 MW
Est. Upg: $11.3M
|
ACTIVE IA / CONSTRUCTION
Lead Risk: 18-30 Months (Medium/High Voltage Transformer)
NYISO interconnection filing (250 MW) - balance-of-plant electrical equipment, switchgear, and substation engineering opportunity.
|
Official Filing ↗ |
| NYISO C26-0054 |
East Setauket Storage II (LIPA)
East Setauket Energy Storage, LLC
Suffolk, NY | Filed 2026-09-09 | Target COD 2028-06-01
|
Holbrook - North Shore Beach 138kV
138 kV | Battery Energy Storage (BESS)
|
248 MW
Est. Upg: $11.2M
|
ACTIVE IA / CONSTRUCTION
Lead Risk: 18-30 Months (Medium/High Voltage Transformer)
NYISO interconnection filing (248 MW) - balance-of-plant electrical equipment, switchgear, and substation engineering opportunity.
|
Official Filing ↗ |
| NYISO C24-183 |
East Setauket Storage II (LIPA)
East Setauket Energy Storage, LLC
Suffolk, NY | Filed 2024-09-17 | Target COD 2028-06-01
|
Holbrook - North Shore Beach 138kV
138 kV | Battery Energy Storage (BESS)
|
248 MW
Est. Upg: $11.2M
|
ACTIVE IA / CONSTRUCTION
Lead Risk: 18-30 Months (Medium/High Voltage Transformer)
NYISO interconnection filing (248 MW) - balance-of-plant electrical equipment, switchgear, and substation engineering opportunity.
|
Official Filing ↗ |
| NYISO C26-0040 |
Fairview Summit Energy Storage (NYSEG)
Fairview Summit Energy Storage LLC
Steuben County, NY | Filed 2026-08-27 | Target COD 2028-06-01
|
Avoca 230kV substation
230 kV | Battery Energy Storage (BESS)
|
245 MW
Est. Upg: $11.0M
|
ACTIVE IA / CONSTRUCTION
Lead Risk: 18-30 Months (Medium/High Voltage Transformer)
NYISO interconnection filing (245 MW) - balance-of-plant electrical equipment, switchgear, and substation engineering opportunity.
|
Official Filing ↗ |
| NYISO C24-364 |
Erie Canal BESS (NYSEG)
RWE Solar Development, LLC
Niagara, NY | Filed 2024-10-15 | Target COD 2028-06-01
|
Robinson Road 115 kV
115 kV | Battery Energy Storage (BESS)
|
230 MW
Est. Upg: $10.3M
|
ACTIVE IA / CONSTRUCTION
Lead Risk: 18-30 Months (Medium/High Voltage Transformer)
NYISO interconnection filing (230 MW) - balance-of-plant electrical equipment, switchgear, and substation engineering opportunity.
|
Official Filing ↗ |
| MISO J4360 |
MISO J4360 - Shockey 138kV (Solar / Battery Storage)
MISO Transmission Owner
Menard, TX | Filed 2026-09-09 | Target COD 2031-11-01
|
Shockey 138kV
138 kV | Solar / Battery Storage
|
200 MW
Est. Upg: $11.0M
|
SUBSTATION UPGRADE NEEDED
Lead Risk: 24-36 Months (138kV-230kV Substation Transformer)
Active MISO queue project (200 MW Solar / Battery Storage) - network upgrade cost allocation & substation EPC contracting window ($PWR, $MYRG, $MTZ).
|
Official Filing ↗ |
| DOD-DOE W909MY26F0026 |
Department of the Army: ACQUIRE GENERATOR SETS IN BOTH THE 500 KW SKID MOBILE ELECTRIC POWER GENERATOR SET (MEPGS) -10001 AND POWER P
CUMMINS POWER GENERATION INC. $CMI
Department of the Army, VA | Filed 2026-05-21 | Target COD 2028-07-31
|
Department of the Army (VA)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
187 MW
Est. Upg: $33.6M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE W909MY24F0018 |
Department of the Army: AMMPS DO 2
CUMMINS POWER GENERATION INC. $CMI
Department of the Army, MN | Filed 2024-03-20 | Target COD 2025-12-22
|
Department of the Army (MN)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
182 MW
Est. Upg: $32.7M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE SPRMM126FRZ02 |
Defense Logistics Agency: CIRCUIT CARD ASSEMB
STS INTERNATIONAL, INCORPORATED
Defense Logistics Agency, MA | Filed 2025-12-01 | Target COD 2031-03-18
|
Defense Logistics Agency (MA)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
174 MW
Est. Upg: $31.3M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE SPRTA126F0028 |
Defense Logistics Agency: GENERATOR ALTERNATING
HAMILTON SUNDSTRAND CORPORATION
Defense Logistics Agency, IL | Filed 2026-04-30 | Target COD 2031-02-28
|
Defense Logistics Agency (IL)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
167 MW
Est. Upg: $30.0M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE W909MY26F0002 |
Department of the Army: ACQUIRE GENERATOR SETS IN BOTH THE 500 KW SKID MOBILE ELECTRIC POWER GENERATOR SET (MEPGS) -10001 AND POWER PL
CUMMINS POWER GENERATION INC. $CMI
Department of the Army, MN | Filed 2025-12-15 | Target COD 2027-07-31
|
Department of the Army (MN)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
164 MW
Est. Upg: $29.5M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE INR13PC40013 |
Bureau of Reclamation: THE PURPOSE OF THIS CONTRACT IS FOR A CONTRACTOR TO PROVIDE THE FOLLOWING: REMOVE AND DISPOSE OF EXISTING STAT
ALSTOM POWER INC
Bureau of Reclamation, AZ | Filed 2025-10-01 | Target COD 2019-04-30
|
Bureau of Reclamation (AZ)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
160 MW
Est. Upg: $28.8M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE FA853224F0001 |
Department of the Air Force: 72KW GPU, 144KW GPU, 144KW ULB
AVIATION GROUND EQUIPMENT CORP
Department of the Air Force, NY | Filed 2023-11-17 | Target COD 2026-07-25
|
Department of the Air Force (NY)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
152 MW
Est. Upg: $27.4M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE N0038326FTC06 |
Department of the Navy: GENERATOR,ALTERNATI
GE AVIATION SYSTEMS LLC $GE
Department of the Navy, OH | Filed 2026-06-25 | Target COD 2026-12-31
|
Department of the Navy (OH)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
149 MW
Est. Upg: $26.7M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE FA520925F9138 |
Department of the Air Force: ELECTRICITY AT YOKOSUKA
TEPCO ENERGY PARTNER, INCORPORATED
Department of the Air Force, US | Filed 2025-04-01 | Target COD 2025-09-30
|
Department of the Air Force (US)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
134 MW
Est. Upg: $24.1M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE FA853224F0002 |
Department of the Air Force: 72 KILOWATT GROUND POWER UNIT
PD POWER SYSTEMS, LLC
Department of the Air Force, VA | Filed 2023-11-17 | Target COD 2024-06-14
|
Department of the Air Force (VA)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
134 MW
Est. Upg: $24.1M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE W909MY25F0032 |
Department of the Army: PURCHASE PRODUCTION AND DELIVERY OF ADVANCED MEDIUM MOBILE POWER SOURCES (AMMPS) GENERATOR SETS.
CUMMINS POWER GENERATION INC. $CMI
Department of the Army, MN | Filed 2025-02-18 | Target COD 2026-09-25
|
Department of the Army (MN)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
130 MW
Est. Upg: $23.4M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE 0001 |
Department of the Army: THIS REQUIREMENT IS TO APPLY THE MODIFIED WORK ORDER TO THE CURRENT DPGDS PRIME POWER UNITS MODELS A AND B FOR
PD POWER SYSTEMS, LLC
Department of the Army, VA | Filed 2025-10-01 | Target COD 2022-11-30
|
Department of the Army (VA)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
125 MW
Est. Upg: $22.4M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE W9123819C0012 |
Department of the Army: THE EFFORT INCLUDES DESIGN, CONSTRUCTION, COMMISSIONING, VALIDATION, TRAINING AND TRANSITION OF A FULLY USABLE
AMERESCO INC $AMRC
Department of the Army, CA | Filed 2025-10-01 | Target COD 2025-05-31
|
Department of the Army (CA)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
122 MW
Est. Upg: $22.0M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE FA520926F9149 |
Department of the Air Force: ELECTRICITY AT YOKOSUKA
TEPCO ENERGY PARTNER, INCORPORATED
Department of the Air Force, US | Filed 2026-04-01 | Target COD 2026-09-30
|
Department of the Air Force (US)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
121 MW
Est. Upg: $21.8M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE N0038326FZQ00 |
Department of the Navy: GENERATOR,DIRECT CU
HAMILTON SUNDSTRAND CORPORATION
Department of the Navy, CT | Filed 2026-01-05 | Target COD 2028-10-02
|
Department of the Navy (CT)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
112 MW
Est. Upg: $20.1M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE 19AQMM24C0063 |
Department of State: GENERATOR SYSTEMS REPLACEMENT
ARKEL INTERNATIONAL, L.L.C.
Department of State, IL | Filed 2024-09-29 | Target COD 2027-03-30
|
Department of State (IL)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
109 MW
Est. Upg: $19.7M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE 36C24226C0051 |
Department of Veterans Affairs: REPLACE MAIN EMD-COOLING TOWERS AT THE JAMES J. PETERS DVA MEDICAL CENTER, BRONX, NY.
J & J MECHANICAL AND CONSTRUCTION GROUP LLC
Department of Veterans Affairs, NY | Filed 2026-03-16 | Target COD 2028-06-30
|
Department of Veterans Affairs (NY)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
107 MW
Est. Upg: $19.2M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE 36C24523C0022 |
Department of Veterans Affairs: INSTALLATION OF STANBY GENERATOR UNITS
MEM CONTRACTING, INC.
Department of Veterans Affairs, MD | Filed 2022-12-21 | Target COD 2027-01-30
|
Department of Veterans Affairs (MD)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
105 MW
Est. Upg: $19.0M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE N6449823C4007 |
Department of the Navy: LCC-19 GENSET REPLACEMENTS
HAWTHORNE MACHINERY CO.
Department of the Navy, CA | Filed 2023-05-18 | Target COD 2026-07-14
|
Department of the Navy (CA)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
105 MW
Est. Upg: $18.9M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE N0038324FZQ03 |
Department of the Navy: GENERATOR,DIRECT CU
HAMILTON SUNDSTRAND CORPORATION
Department of the Navy, CT | Filed 2023-11-15 | Target COD 2024-11-14
|
Department of the Navy (CT)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
103 MW
Est. Upg: $18.5M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE W909MY26F0016 |
Department of the Army: PURCHASE PRODUCTION AND DELIVERY OF ADVANCED MEDIUM POWER SOURCES (AMMPS) GENERATOR SETS.
CUMMINS POWER GENERATION INC. $CMI
Department of the Army, MN | Filed 2026-01-29 | Target COD 2027-07-30
|
Department of the Army (MN)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
95.7 MW
Est. Upg: $17.2M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE SPRDL125F0156 |
Defense Logistics Agency: NSN: 6110-01-565-1117 COMMODITY NAME: DISTRIBUTION BOX QTY:272
GENERAL DYNAMICS LAND SYSTEMS INC. $GD
Defense Logistics Agency, MI | Filed 2025-06-09 | Target COD 2029-01-24
|
Defense Logistics Agency (MI)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
90.3 MW
Est. Upg: $16.3M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE W909MY24F0025 |
Department of the Army: AMMPS DO 3
CUMMINS POWER GENERATION INC. $CMI
Department of the Army, MN | Filed 2024-06-14 | Target COD 2025-10-27
|
Department of the Army (MN)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
90.2 MW
Est. Upg: $16.2M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE N6833524F0091 |
Department of the Navy: LMEPP PRODUCTION UNITS YEAR ONE
ESSEX ELECTRO ENGINEERS INC
Department of the Navy, IL | Filed 2023-12-18 | Target COD 2025-12-31
|
Department of the Navy (IL)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
90.2 MW
Est. Upg: $16.2M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE FA930025P6011 |
Department of the Air Force: STEAM GENERATOR
HASKELL CORP
Department of the Air Force, CA | Filed 2025-09-03 | Target COD 2028-04-05
|
Department of the Air Force (CA)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
89.0 MW
Est. Upg: $16.0M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE FA821722F0434 |
Department of the Air Force: ACQUIRE AN UNINTERRUPTIBLE POWER SUPPLY (UPS) PACKAGE YOKOTA AIR BASE, JAPAN - BLDG. 650.
STRANTECH LLC $UPS
Department of the Air Force, US | Filed 2022-09-12 | Target COD 2026-09-30
|
Department of the Air Force (US)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
89.0 MW
Est. Upg: $16.0M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE W909MY24F0034 |
Department of the Army: AMMPS DELIVERY ORDER #4
CUMMINS POWER GENERATION INC. $CMI
Department of the Army, MN | Filed 2024-08-28 | Target COD 2026-09-25
|
Department of the Army (MN)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
85.0 MW
Est. Upg: $15.3M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE FA520926F9041 |
Department of the Air Force: ELECTRICITY AT YOKOSUKA
TEPCO ENERGY PARTNER, INCORPORATED
Department of the Air Force, US | Filed 2025-10-01 | Target COD 2026-03-31
|
Department of the Air Force (US)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
80.7 MW
Est. Upg: $14.5M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE N0010425CNA18 |
Department of the Navy: CABLE ASSEMBLY,SPEC
L3 TECHNOLOGIES INC
Department of the Navy, MD | Filed 2025-03-28 | Target COD 2030-11-29
|
Department of the Navy (MD)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
80.7 MW
Est. Upg: $14.5M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE FA910124FB005 |
Department of the Air Force: REPLACE SPS SWITCHGEAR WITH GIS BUILDING 1507
SIEMENS INDUSTRY INC
Department of the Air Force, TN | Filed 2023-11-02 | Target COD 2026-11-20
|
Department of the Air Force (TN)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
78.2 MW
Est. Upg: $14.1M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE W912BU24C0050 |
Department of the Army: 2024 OIR EBOM - ATG 50HZ
TOGIAK LOGISTICS SERVICES, LLC
Department of the Army, US | Filed 2024-09-30 | Target COD 2025-09-23
|
Department of the Army (US)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
77.6 MW
Est. Upg: $14.0M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE FA520926F9146 |
Department of the Air Force: ELECTRIC POWER AT IWAKUNI
THE CHUGOKU ELECTRIC POWER COMPANY, INCORPORATED
Department of the Air Force, US | Filed 2026-04-01 | Target COD 2026-09-30
|
Department of the Air Force (US)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
75.3 MW
Est. Upg: $13.5M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE W912CH25F0344 |
Department of the Army: STRYKER ENHANCED POWER DISTRIBUTION UNIT VERSION TWO DELIVERY ORDER
GENERAL DYNAMICS LAND SYSTEMS INC. $GD
Department of the Army, MI | Filed 2025-08-28 | Target COD 2028-03-27
|
Department of the Army (MI)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
73.5 MW
Est. Upg: $13.2M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE W909MY23F0027 |
Department of the Army: AMMPS DELIVERY ORDER 0018
CUMMINS POWER GENERATION INC. $CMI
Department of the Army, MN | Filed 2023-02-27 | Target COD 2025-08-15
|
Department of the Army (MN)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
71.8 MW
Est. Upg: $12.9M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE FA520925F9131 |
Department of the Air Force: ELECTRIC POWER AT IWAKUNI
THE CHUGOKU ELECTRIC POWER COMPANY, INCORPORATED
Department of the Air Force, US | Filed 2025-04-01 | Target COD 2025-09-30
|
Department of the Air Force (US)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
71.7 MW
Est. Upg: $12.9M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE N6833523F0176 |
Department of the Navy: LMEPP PRODUCTION UNITS YEAR ONE
ESSEX ELECTRO ENGINEERS INC
Department of the Navy, IL | Filed 2023-03-06 | Target COD 2024-10-31
|
Department of the Navy (IL)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
67.7 MW
Est. Upg: $12.2M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE FA520926F9137 |
Department of the Air Force: ELECTRIC POWER AT YOKOTA
TEPCO ENERGY PARTNER, INCORPORATED
Department of the Air Force, US | Filed 2026-04-01 | Target COD 2026-09-30
|
Department of the Air Force (US)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
59.6 MW
Est. Upg: $10.7M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE FA520926F9038 |
Department of the Air Force: ELECTRIC POWER AT IWAKUNI
THE CHUGOKU ELECTRIC POWER COMPANY, INCORPORATED
Department of the Air Force, US | Filed 2025-10-01 | Target COD 2026-03-31
|
Department of the Air Force (US)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
56.8 MW
Est. Upg: $10.2M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE 19AQMM24F1060 |
Department of State: PURCHASE AND INSTALLATION OF SWITCH GEARS
PACARCTIC, LLC
Department of State, DC | Filed 2024-06-05 | Target COD 2026-04-30
|
Department of State (DC)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
56.4 MW
Est. Upg: $10.1M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE N0038320FBV03 |
Department of the Navy: CONTROLLER ASSEMBLY
RAYTHEON COMPANY $RTX
Department of the Navy, CA | Filed 2020-04-23 | Target COD 2026-12-31
|
Department of the Navy (CA)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
56.0 MW
Est. Upg: $10.1M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE FA910126FB010 |
Department of the Air Force: VKF SWITCHGEAR (REPLACE 6.9 KV SWITCHGEAR-VKF, FAC, 651)
SIEMENS INDUSTRY INC
Department of the Air Force, TN | Filed 2025-12-23 | Target COD 2027-09-05
|
Department of the Air Force (TN)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
54.9 MW
Est. Upg: $9.9M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE N0003926F9000 |
Department of the Navy: CUE PSM PRODUCTION UNITS
AEGIS POWER SYSTEMS INC
Department of the Navy, NC | Filed 2025-11-17 | Target COD 2028-04-24
|
Department of the Navy (NC)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
54.4 MW
Est. Upg: $9.8M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE N3943023C2513 |
Department of the Navy: MOBILE UTILITIES SUPPORT EQUIPMENT DESIGN AND PACKAGE OF TEN 900KW GENERATORS
GIRTZ INDUSTRIES INC
Department of the Navy, IN | Filed 2023-08-11 | Target COD 2025-08-11
|
Department of the Navy (IN)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
54.4 MW
Est. Upg: $9.8M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE W912BU21C0041 |
Department of the Army: GENERATOR - ENGINE SETS
CUMMINS INC $CMI
Department of the Army, TN | Filed 2021-09-01 | Target COD 2026-08-03
|
Department of the Army (TN)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
53.6 MW
Est. Upg: $9.6M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE FA853224F0168 |
Department of the Air Force: BEAR POWER UNIT (BPU)
ATAP INC
Department of the Air Force, AL | Filed 2024-03-04 | Target COD 2026-11-04
|
Department of the Air Force (AL)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
51.7 MW
Est. Upg: $9.3M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE SPRTA126C0001 |
Defense Logistics Agency: CONTROL, GENERATOR
INTERTRADE LIMITED
Defense Logistics Agency, TN | Filed 2025-12-23 | Target COD 2029-12-31
|
Defense Logistics Agency (TN)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
51.5 MW
Est. Upg: $9.3M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE FA811722C0004 |
Department of the Air Force: ENGINEERING SERVICES FOR B-2 ATTITUDE MOTION SENSOR SET (AMSS)
NORTHROP GRUMMAN SYSTEMS CORPORATION $NOC
Department of the Air Force, OK | Filed 2022-09-28 | Target COD 2026-07-31
|
Department of the Air Force (OK)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
51.2 MW
Est. Upg: $9.2M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE W9127N26CA022 |
Department of the Army: SCOPE IS LIMITED TO MANUFACTURE, TESTING, AND SUPPLY OF TEN CUSTOM 15KV SWITCHGEAR ASSEMBLIES FOR BONNEVILLE P
EATON CORPORATION $ETN
Department of the Army, OR | Filed 2026-05-01 | Target COD 2029-04-30
|
Department of the Army (OR)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
50.9 MW
Est. Upg: $9.2M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE W909MY22F0084 |
Department of the Army: AMMPS DELIVERY ORDER 0016
CUMMINS POWER GENERATION INC. $CMI
Department of the Army, MN | Filed 2022-09-28 | Target COD 2025-08-15
|
Department of the Army (MN)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
48.7 MW
Est. Upg: $8.8M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE FA520925F9126 |
Department of the Air Force: ELECTRIC POWER AT YOKOTA
TEPCO ENERGY PARTNER, INCORPORATED
Department of the Air Force, US | Filed 2025-04-01 | Target COD 2025-09-30
|
Department of the Air Force (US)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
48.5 MW
Est. Upg: $8.7M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE W909MY24F0014 |
Department of the Army: AMMPS DELIVERY ORDER 22
CUMMINS POWER GENERATION INC. $CMI
Department of the Army, MN | Filed 2024-02-12 | Target COD 2025-04-25
|
Department of the Army (MN)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
47.9 MW
Est. Upg: $8.6M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE SPE4AX26F7867 |
Defense Logistics Agency: 8511942621!CABLE ASSEMBLY,SPECIAL PURPOS
RTX CORPORATION $RTX
Defense Logistics Agency, CT | Filed 2026-02-27 | Target COD 2026-12-31
|
Defense Logistics Agency (CT)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
46.5 MW
Est. Upg: $8.4M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE SPRRA123F0069 |
Defense Logistics Agency: NOUN: GENERATOR, ALTERNATI NSN: 6115-01-114-9696 PN: 70550-02031-111
SIKORSKY AIRCRAFT CORPORATION $LMT
Defense Logistics Agency, CT | Filed 2023-01-20 | Target COD 2027-05-15
|
Defense Logistics Agency (CT)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
46.4 MW
Est. Upg: $8.4M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE SPE7M925C0007 |
Defense Logistics Agency: 8511257116!BASE,DISTRIBUTION B
DRS NETWORK & IMAGING SYSTEMS LLC
Defense Logistics Agency, FL | Filed 2025-04-03 | Target COD 2027-11-17
|
Defense Logistics Agency (FL)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
46.3 MW
Est. Upg: $8.3M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE W909MY21F0067 |
Department of the Army: SPARES
PD POWER SYSTEMS, LLC
Department of the Army, FL | Filed 2021-08-31 | Target COD 2023-07-31
|
Department of the Army (FL)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
46.0 MW
Est. Upg: $8.3M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE W909MY24F0023 |
Department of the Army: FUNDING REQUESTED TO PROCURE TWELVE 12 DPGDS PU RECAP, MEP-PU-810D POWER UNITS IAW CONTRACT W909MY-17-D-0002,
PD POWER SYSTEMS, LLC
Department of the Army, FL | Filed 2024-05-13 | Target COD 2026-02-28
|
Department of the Army (FL)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
43.1 MW
Est. Upg: $7.8M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE W909MY23C0007 |
Department of the Army: STEP 3KW
PRODUCTION PRODUCTS MANUFACTURING & SALES CO., INC.
Department of the Army, MO | Filed 2023-04-05 | Target COD 2026-05-15
|
Department of the Army (MO)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
41.6 MW
Est. Upg: $7.5M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE W909MY23C0006 |
Department of the Army: STEP 3KW
MARVIN LAND SYSTEMS, INC.
Department of the Army, CA | Filed 2023-04-05 | Target COD 2026-07-31
|
Department of the Army (CA)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
41.4 MW
Est. Upg: $7.5M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE N0010426CNA02 |
Department of the Navy: CABLE ASSEMBLY,SPEC
TELEDYNE INSTRUMENTS INC $TDY
Department of the Navy, NH | Filed 2026-03-20 | Target COD 2028-12-13
|
Department of the Navy (NH)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
41.1 MW
Est. Upg: $7.4M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE 70Z02321FAVS00200 |
U.S. Coast Guard: INITIAL DELIVERY ORDER FOR THE U.S. COAST GUARD 270 MEDIUM ENDURANCE CUTTER MAIN DIESEL ENGINE CONTRACT.
FAIRBANKS MORSE, LLC
U.S. Coast Guard, TX | Filed 2021-01-05 | Target COD 2023-03-04
|
U.S. Coast Guard (TX)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
38.9 MW
Est. Upg: $7.0M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE SPRDL125C0048 |
Defense Logistics Agency: NOUN: DISTRIBUTING SYSTEM, ELECTRICAL, NSN: 6150-01-699-8530 P/N: PR63636, QTY 94/0%
DRS NETWORK & IMAGING SYSTEMS LLC
Defense Logistics Agency, FL | Filed 2025-03-17 | Target COD 2027-06-05
|
Defense Logistics Agency (FL)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
38.8 MW
Est. Upg: $7.0M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE FA853423F0073 |
Department of the Air Force: BEAR POWER UNIT
KUOG CORP
Department of the Air Force, AL | Filed 2023-08-10 | Target COD 2024-06-13
|
Department of the Air Force (AL)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
38.6 MW
Est. Upg: $7.0M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE HT941025PE058 |
Defense Health Agency: UNINTERRUPTIBLE POWER SUPPLY AND DATA CENTER REFRESH FOR NAVAL MEDICAL CENTER SAN DIEGO
SENECA FEDERAL SOLUTIONS, LLC
Defense Health Agency, VA | Filed 2025-09-15 | Target COD 2027-09-14
|
Defense Health Agency (VA)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
38.5 MW
Est. Upg: $6.9M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE W909MY20F0114 |
Defense Contract Management Agency: PURCHASE OF SPARES AND DELIVERABLES UNDER SHADOW EO/IR/LD IDIQ CONTRACT.
WESCAM USA, INC.
Defense Contract Management Agency, CA | Filed 2020-09-01 | Target COD 2023-05-31
|
Defense Contract Management Agency (CA)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
38.3 MW
Est. Upg: $6.9M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE N0038326FT500 |
Department of the Navy: CONTROLLER ASSEMBLY
RAYTHEON COMPANY $RTX
Department of the Navy, CA | Filed 2026-01-06 | Target COD 2027-04-16
|
Department of the Navy (CA)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
38.2 MW
Est. Upg: $6.9M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE SPRTA119C0057 |
Defense Logistics Agency: GENERATOR, ALTERNATI
SAFRAN POWER USA LLC
Defense Logistics Agency, OH | Filed 2025-10-01 | Target COD 2025-06-17
|
Defense Logistics Agency (OH)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
37.6 MW
Est. Upg: $6.8M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE SPRTA125C0033 |
Defense Logistics Agency: GENERATOR, ALTERNATING
INTERTRADE LIMITED
Defense Logistics Agency, TN | Filed 2025-03-21 | Target COD 2030-09-16
|
Defense Logistics Agency (TN)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
37.4 MW
Est. Upg: $6.7M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE SPRTA125C0071 |
Defense Logistics Agency: GENERATOR, ALTERNATING CURRENT
INTERTRADE LIMITED
Defense Logistics Agency, IA | Filed 2025-07-28 | Target COD 2032-06-21
|
Defense Logistics Agency (IA)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
36.8 MW
Est. Upg: $6.6M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE N0010426CNA09 |
Department of the Navy: CABLE ASSEMBLY,SPEC
TELEDYNE INSTRUMENTS INC $TDY
Department of the Navy, NH | Filed 2026-02-10 | Target COD 2028-08-08
|
Department of the Navy (NH)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
36.6 MW
Est. Upg: $6.6M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE N3943018F4401 |
Department of the Navy: IGF::OT::IGF X034 PW62, DERLEY: NEW TASK ORDER TO PROCURE AND INS
ARGO SYSTEMS, LLC
Department of the Navy, VA | Filed 2025-10-01 | Target COD 2023-07-31
|
Department of the Navy (VA)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
36.1 MW
Est. Upg: $6.5M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE 72030620C00001 |
Agency for International Development: USAID OVERSEAS CONTRACT
DOMESTIC AWARDEES (UNDISCLOSED)
Agency for International Development, US | Filed 2025-10-01 | Target COD 2024-09-30
|
Agency for International Development (US)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
35.9 MW
Est. Upg: $6.5M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE FA520925F9171 |
Department of the Air Force: ELECTRICITY AT CAMP ZAMA
TEPCO ENERGY PARTNER, INCORPORATED
Department of the Air Force, US | Filed 2025-04-01 | Target COD 2025-09-30
|
Department of the Air Force (US)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
35.3 MW
Est. Upg: $6.4M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE 693KA725F00009 |
Federal Aviation Administration: THIS DELIVEYR ORDER IS DO 0002 WHICH IS FOR THE BULK BUY OF THE MLC AND ILC COMPONENTS NEEDED FOR RWSL FLS RCP
ADB SAFEGATE AMERICAS LLC
Federal Aviation Administration, OH | Filed 2025-06-23 | Target COD 2030-06-02
|
Federal Aviation Administration (OH)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
35.2 MW
Est. Upg: $6.3M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
| DOD-DOE N0038322FT500 |
Department of the Navy: FIRST DELIVERY ORDER IN POP 1
RAYTHEON COMPANY $RTX
Department of the Navy, MS | Filed 2021-12-15 | Target COD 2026-12-31
|
Department of the Navy (MS)
138 kV | DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)
|
35.0 MW
Est. Upg: $6.3M
|
DOD BASE MICROGRID / EPC
Lead Risk: 24-36 Months (HV GSU / Substation Transformer)
Active DoD/DOE power transformer, switchgear, or base microgrid contract - prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.
|
Official Filing ↗ |
Export Custom Datasets or Query the AwardTape API
Select from 6 core datasets (Contractors, Contract Instruments, Expiring Recompetes, Allied Procurement, HV Grid Queue, Sanctions/UFLPA), filter by company, ticker, or PIID, and export in CSV, JSON, or Markdown Brief.