No active exclusion found for this UEI, CAGE or legal name.
| Registration | Active / All awards / expires 2027-01-12 |
|---|---|
| Legal name | DOYON MANAGEMENT SERVICES, LLC |
| Address | 32001 32ND AVE S STE 335, FEDERAL WAY, WA, 98001, USA / district 09 |
| Structure | Partnership or LLP, incorporated in AK / in business since 2003-07-25 |
| NAICS | 236210 (+27 more) |
| API | registration JSON / SAM.gov record |
| Contract ID | Obligated (FY24+) | Type | Agency | Category | Description | Latest Action |
|---|---|---|---|---|---|---|
| 70Z08725FKODI0001 | $19.8M | delivery order | U.S. Coast Guard | Real property maintenance and repair | Major repair and renovation building n1 on base kodiak | Sep 28, 2026 |
| 70Z08724FKODI0002 | $12.1M | delivery order | U.S. Coast Guard | Real property maintenance and repair | Demo wharf at base kodiak, ak | Jul 14, 2026 |
| W912DW21C0023 | $11.7M | definitive contract | Department of the Army | Real property maintenance and repair | Repair bldg 09175 | Sep 30, 2025 |
| N4425526F0150 | $8.9M | delivery order | Department of the Navy | Real property maintenance and repair | This project will refurbish the main dewatering pumps (mdp) #1 and #2 and replace mdp2s associated check and discharge valves and operators in pumpwell 5 (pw5) of drydock 5 (dd5). the mdps pump out seawater to empty the flooded drydock. | May 14, 2026 |
| N4425526F0093 | $6.2M | delivery order | Department of the Navy | Real property maintenance and repair | This project will replace drainage pump 3, dp3 starter, supporting structure, associated discharge piping and piping components and associated valves in pumpwell 6 of drydock 6. | Mar 10, 2026 |
| N4425526F0031 | $5.6M | delivery order | Department of the Navy | New construction | Procure and install relocatable buildings, farragut, b850 | Feb 18, 2026 |
| FA820126F0062 | $5.1M | delivery order | Department of the Air Force | Real property maintenance and repair | Bldg 265 replace roof | Feb 23, 2026 |
| N4425525F4108 | $4.6M | delivery order | Department of the Navy | Real property maintenance and repair | Replace uh roof, b942 bremerton | Mar 3, 2026 |
| N4425525F0231 | $4.0M | delivery order | Department of the Navy | Real property maintenance and repair | This project is a firm fixed-price, design-build (db) construction contract to demolish the existing open-circuit cooling towers and heat exchangers and replace them with new closed circuit systems that will service building 6500 bangor. | Sep 11, 2025 |
| N4425525F4012 | $4.0M | delivery order | Department of the Navy | Real property maintenance and repair | Replace hvac system at icpb, phase 2, building 6589, naval base kitsap, washington | Dec 11, 2024 |
| N4425524F4295 | $3.6M | delivery order | Department of the Navy | Real property maintenance and repair | Dec 11, 2025 | |
| N4425524F4331 | $3.6M | delivery order | Department of the Navy | Real property maintenance and repair | 15654663, replace all roof sections, b78, psns | Jul 31, 2024 |
| W912DW24F2071 | $2.8M | delivery order | Department of the Army | New construction | Building addition, bldg. 3459 | Sep 27, 2024 |
| N4425525F0207 | $2.8M | delivery order | Department of the Navy | Real property maintenance and repair | Renovate cnsgnw offices, b-13910, marysville | Apr 29, 2026 |
| W912DY24F0527 | $2.7M | delivery order | Department of the Army | New construction | Jblm madigan gate installation elect | Jul 28, 2025 |
| N4425525F4022 | $2.6M | delivery order | Department of the Navy | New construction | Firm-fixed-price for all labor, materials, equipment, and associated costs for a design-build project to modernize the control system and electrical components for one 100-ton rated top running bridge type multiple girder electric ... | Feb 5, 2026 |
| N4425524F4222 | $2.6M | delivery order | Department of the Navy | Real property maintenance and repair | Replace hvac system at swfpac icpb building #6589, phase 1 | Sep 12, 2024 |
| N4425526F0096 | $2.5M | delivery order | Department of the Navy | Real property maintenance and repair | Replace hvac system icpb ph 3 b6589 naval base kitsap bangor, washington | Mar 12, 2026 |
| W912DW24F2053 | $2.1M | delivery order | Department of the Army | New construction | Repair hvac, ddc, and lighting | Dec 8, 2025 |
| N4425525F0218 | $2.1M | delivery order | Department of the Navy | Real property maintenance and repair | Demolish the existing ductwork in the cleaning room and system exhaust fan and replace them with ten new exhaust fans that will service separate sink and work bench hoods. | Aug 26, 2025 |
| N4425524F4354 | $2.1M | delivery order | Department of the Navy | Real property maintenance and repair | 22560355, replace existing roof systems, bldgs. 7415, 7419, 7425, 7428, nbk-bangor | Aug 13, 2024 |
| N4425524F4419 | $1.9M | delivery order | Department of the Navy | Real property maintenance and repair | Replace roof on uh building 2207 and 2720 bangor plaza, naval base kitsap, bangor, washington | Jan 31, 2025 |
| W912DW24F2065 | $1.8M | delivery order | Department of the Army | Real property maintenance and repair | Construction of a playground | Dec 8, 2025 |
| N4425524F4351 | $1.8M | delivery order | Department of the Navy | Real property maintenance and repair | X005 6051388 msr #22159444_1778949 -- (ih-db_22159444) support installation of carousels multiple buildings | May 1, 2026 |
| N4008526F0864 | $1.1M | delivery order | Department of the Navy | New construction | Data concentrator shed restoration, naval station norfolk, norfolk, virginia | May 5, 2026 |
| 70Z08724FKODI0016 | $1.1M | delivery order | U.S. Coast Guard | Real property maintenance and repair | Kodiak fender piles repair fy24 | Feb 3, 2025 |
| N4425525F0022 | $1.1M | delivery order | Department of the Navy | Real property maintenance and repair | This task order is to replace damaged saltwater pump 8 controls with like-in-kind, replace control cabinet with nema 4x rated, replace vfd motor starter with like-in-kind | Mar 6, 2026 |
| N4425524F4339 | $846K | delivery order | Department of the Navy | Real property maintenance and repair | 22208162, complete built-up roof replacement b12, nbk manchester | Sep 25, 2025 |
| N4425520C5001 | $616K | definitive contract | Department of the Navy | Real property maintenance and repair | Electrical improvements and repair to substation 1, naval base kitsap, bangor, washington | Jan 30, 2026 |
| N4425525F0232 | $468K | delivery order | Department of the Navy | Real property maintenance and repair | Replace gutters and downspouts in building 2026 | Jan 16, 2026 |
| FA820122F0304 | $429K | delivery order | Department of the Air Force | Real property maintenance and repair | Repair east apron b5009 phase d | Mar 5, 2025 |
| W912DW26FA011 | $385K | delivery order | Department of the Army | New construction | Airfield bridge security device | Dec 19, 2025 |
| N4425525F4100 | $260K | delivery order | Department of the Navy | Real property maintenance and repair | 8(a) idiq nse aor | Mar 12, 2025 |
| N4425525F4203 | $141K | delivery order | Department of the Navy | Installation of equipment | 8(a) idiq nse aor | Mar 19, 2025 |
| FA462624F0045 | $122K | delivery order | Department of the Air Force | Real property maintenance and repair | This requirement consists of running fiber optic cables from building 145 to 1082. | Apr 11, 2024 |
| FA462623F0036 | $104K | delivery order | Department of the Air Force | Real property maintenance and repair | Upgrade communication cables between building 145 and building 500. | Aug 28, 2024 |
| 70Z08725FKODI0004 | $37K | delivery order | U.S. Coast Guard | Real property maintenance and repair | Casrep remove damaged cargo piles from cutter berth | Nov 15, 2024 |
| N4008524F6712 | $5K | delivery order | Department of the Navy | New construction | Minimum guarantee doyon management services | Sep 26, 2024 |
| N4425524F4402 | $1K | delivery order | Department of the Navy | Real property maintenance and repair | Idiq contract - minimum guarantee | Sep 12, 2024 |
| 70Z08718DPJT24100 | $0 | IDIQ contract | U.S. Coast Guard | Real property maintenance and repair | Region 17 regional multiple award construction contract (rmacc) award | Jul 9, 2026 |
| 70Z08724DJUNE0002 | $0 | IDIQ contract | U.S. Coast Guard | Real property maintenance and repair | Rmacc bridge contract | Aug 14, 2026 |
| 70Z08724FJUNE0006 | $0 | delivery order | U.S. Coast Guard | Real property maintenance and repair | Rmacc bridge contract minimum guarantee | Oct 23, 2024 |
| FA462620D0010 | $0 | IDIQ contract | Department of the Air Force | Real property maintenance and repair | This requirement is for the malmstrom afb multiple award task order contract (matoc) indefinite delivery/indefinite quantity (idiq). the total aggregate maximum amount expendable under the entire matoc lifecycle shall not exceed ... | May 7, 2025 |
| FA820122D0013 | $0 | IDIQ contract | Department of the Air Force | Real property maintenance and repair | Multiple award construction contract (macc) iv for hill afb, tenant units, and utah air national guard. the task orders issued under the contract will provide various construction services for sustainment, maintenance, and new construction. | May 28, 2025 |
| N4008524D2504 | $0 | IDIQ contract | Department of the Navy | New construction | Macc waterfront con projects - base yr | Sep 25, 2025 |
| N4425523D1604 | $0 | IDIQ contract | Department of the Navy | New construction | Navfac northwest 8(a) macc | Jan 29, 2026 |
| N4425524D7000 | $0 | IDIQ contract | Department of the Navy | Real property maintenance and repair | 8(a) idiq nse aor | Sep 22, 2024 |
| W912DW19D1003 | $0 | IDIQ contract | Department of the Army | New construction | $175m 8(a) matoc multi-disciplinary maintenance, repair, construction and incidental design work for joint base lewis mcchord (jblm) its sub-installations and other customers supported within the usace seattle district | Apr 23, 2025 |
| W912DY21D0094 | $0 | IDIQ contract | Department of the Army | New construction | Access control point design build. this is an indefinite delivery indefinite quantity (idiq) multiple award task order contract (matoc). | Aug 18, 2025 |
| W912DW23C0006 | -$1K | definitive contract | Department of the Army | New construction | Agricultural research service (ars)/national clonal germplasm repository is located at the lewis brown research farm in corvallis, oregon. main projects include replace 6 screen houses, construct gutter, renovate green houses 1,2,3 and 4. | May 14, 2025 |
| # | Parent Contract ID | Task Orders | Obligated (FY24+) | Vehicle Ceiling | Unused Ceiling | Description | Latest Order |
|---|---|---|---|---|---|---|---|
| 1 | N4425523D1604 | 18 | $60.7M | $8.9M | - | X005 6051388 msr #22159444_1778949 -- (ih-db_22159444) support installation of carousels multiple buildings | May 14, 2026 |
| 2 | 70Z08724DJUNE0002 | 4 | $20.9M | $19.8M | - | Rmacc bridge contract minimum guarantee | Sep 28, 2026 |
| 3 | 70Z08718DPJT24100 | 1 | $12.1M | $12.1M | - | Demo wharf at base kodiak, ak | Jul 14, 2026 |
| 4 | W912DW19D1003 | 4 | $7.2M | $2.8M | - | Repair hvac, ddc, and lighting | Dec 19, 2025 |
| 5 | FA820122D0013 | 2 | $5.5M | $5.1M | - | Repair east apron b5009 phase d | Feb 23, 2026 |
| 6 | W912DY21D0094 | 1 | $2.7M | $2.8M | $108K | Jblm madigan gate installation elect | Jul 28, 2025 |
| 7 | N4008524D2504 | 2 | $1.1M | $1.1M | - | Minimum guarantee doyon management services | May 5, 2026 |
| 8 | N4425524D7000 | 4 | $870K | $468K | - | Replace gutters and downspouts in building 2026 | Jan 16, 2026 |
| 9 | FA462620D0010 | 2 | $227K | $609K | - | Upgrade communication cables between building 145 and building 500. | Aug 28, 2024 |
Unused ceiling is uncommitted capacity across available contract records, not guaranteed spending. Vehicle details summarize the largest 500 records.
| # | Agency | Awards | Obligated | Share |
|---|---|---|---|---|
| 1 | Department of the Navy | 28 | $63.3M | 51% |
| 2 | U.S. Coast Guard | 7 | $33.0M | 27% |
| 3 | Department of the Army | 9 | $21.6M | 17% |
| 4 | Department of the Air Force | 6 | $5.7M | 4.6% |
| # | Category | Awards | Obligated | Share |
|---|---|---|---|---|
| 1 | Real property maintenance and repair | 36 | $106.1M | 86% |
| 2 | New construction | 13 | $17.5M | 14% |
| 3 | Installation of equipment | 1 | $141K | 0.1% |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Data as of Oct 24, 2026.
Export Custom Datasets or Query the AwardTape API
Select from 6 core datasets (Contractors, Contract Instruments, Expiring Recompetes, Allied Procurement, HV Grid Queue, Sanctions/UFLPA), filter by company, ticker, or PIID, and export in CSV, JSON, or Markdown Brief.
Building an AI agent? Get this company profile as JSON: GET /api/agent/v1/companies/doyon-management-services. Schema, sample and price or start with free sample calls.