W91238-25-F-0064: $9.6M Department of the Army Award to HDR Engineering, Inc
Project title and location: fy26 milcon, mc-130j hangar/aircraft maintenance unit (amu), davis-monthan afb, az. (100% design d-b-b). Contracting activity: W075 ENDIST SACRAMENTO. Estimated completion: 2026-10-30.
$9.6M total obligated / Competed / 2026-10-30 completion / W91238 W075 ENDIST SACRAMENTO
1. Contract Summary & Primary Sources
| Contract Number (PIID) | W91238-25-F-0064 (unhyphenated: W9123825F0064) / Parent Vehicle: W91238-23-D-0003 |
|---|---|
| Prime Contractor (Awardee) |
HDR Engineering, Inc
(Arizona)
FY2024-FY2026 Federal Defense Portfolio: $9.5M obligated across 16 contracts
|
| Total Obligated (all actions) | $9,573,676 ($9.6M) |
| USAspending / FPDS Obligation History | Total obligated: $9,573,676 (signed 2024-12-20, latest FPDS action 2026-01-21) |
| Awarding Branch / Agency | Department of the Army |
| Contracting Command & DoDAAC | W91238: W075 ENDIST SACRAMENTO |
| Competition & Contract Structure | Competed / Delivery Order (delivery order) / Firm-Fixed-Price (FFP) |
| Product / Service & Industry Codes | PSC C211 (Architect And Engineering- General: Landscaping, Interior Layout, And Designing) / NAICS 541330 (Engineering Services) |
| Work Locations & Funding | Primary Place of Performance: Arizona |
| Estimated Completion Date | 2026-10-30 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
Project title and location: fy26 milcon, mc-130j hangar/aircraft maintenance unit (amu), davis-monthan afb, az. (100% design d-b-b)
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: HDR Engineering, Inc
- Delivery Runway: Active through 2026-10-30
- Requirement Scope: Project title and location: fy26 milcon, mc-130j hangar/aircraft maintenance unit (amu), davis-monthan afb, az. (100% design d-b-b)
- Federal Supply Class: PSC C211 (Architect And Engineering- General: Landscaping, Interior Layout, And Designing)
- BD Action: Reference Prime Contract W91238-25-F-0064 when contacting HDR Engineering, Inc Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: W91238 (W075 ENDIST SACRAMENTO)
- Acquisition Method: Competed
- FOIA Jurisdiction: Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil)
- Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.
Recent Contract Actions from Buying Office W91238 (W075 ENDIST SACRAMENTO)
| Date | Contract (PIID) | Prime Contractor | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-11-12 | W91238-27-C-A002 | Martin Brothers Construction | $26.7M | Nov 13, 2028 | The construction of an Energy Resilience and Conservation Investment Program microgrid |
| 2026-10-30 | W91238-27-D-A001 | AECOM Technical Services Inc. | $238.0M | Oct 29, 2031 | AECOM Technical Services Inc., Los Angeles, California (W91238-27-D-A001); RJH Consultants Inc.,* Englewood, Colorado (W91238-27-D-A002); LH... |
| 2026-10-16 | W91238-23-C-0014 | Granite Construction | $32.4M | - | The award record on file for W9123823C0014 shows a $202.43M ceiling and $199.93M obligated, as of the last USAspending load. |
| 2026-09-30 | W91238-26-C-A014 | M.A. Mortenson | $218.7M | Aug 13, 2029 | M.A. Mortenson wins $218.7M contract for design-build construction of a two-story depot maintenance complex to support F-35. U.S. Army Corps... |
| 2026-09-30 | W91238-26-C-A014 | M.A. Mortenson Co. | $0 | - | CORRECTION: The $218,654,000 firm-fixed-price contract (W91238-26-C-A014) announced on Sept. 29, 2026, to M.A. Mortenson Co., Minneapolis, M... |
| 2026-09-29 | W91238-26-C-A014 | M.A. Mortenson | $218.7M | Aug 11, 2029 | M.A. Mortenson wins $218.7M contract for design-build construction of a hangar maintenance facility. U.S. Army Corps of Engineers $100.0M ob... |
| 2026-08-27 | W91238-23-C-0010 | Folsom Dam Constructors | $10.3M | Oct 26, 2029 | Folsom Dam Constructors gets $10.3M modification for Folsom Dam Wing Dam construction. U.S. Army Corps of Engineers $10.3M obligated now wor... |
| 2026-06-15 | W91238-26-D-A001 | Landology Inc | $99.0M | Jun 11, 2031 | Landology and 4 others share $99.0M order for each order of the $99,000,000 firm-fixed-price contract for mitigation. U.S. Army Corps of Eng... |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for W91238-25-F-0064
Routed to Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil) / Official Agency FOIA Portal ↗
Export Contract Dossier & Related Awards
Download this contract record, sibling orders, and buying office awards in CSV, JSON, or Markdown Brief, or query via the AwardTape API & MCP server.
Building an AI agent? Get this award as JSON: GET /api/agent/v1/awards?q=W9123825F0064. Schema, sample and price or start with free sample calls.